ONORM EN ISO 1133-1 : 2012
Superseded
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
PLASTICS - DETERMINATION OF THE MELT MASS-FLOW RATE (MFR) AND MELT VOLUME-FLOW RATE (MVR) OF THERMOPLASTICS - PART 1: STANDARD METHOD (ISO 1133-1:2011)
Superseded date
23-11-2022
Superseded by
Published date
12-01-2013
Sorry this product is not available in your region.
DevelopmentNote |
Supersedes ONORM EN ISO 1133. (04/2012)
|
DocumentType |
Standard
|
PublisherName |
Osterreichisches Normungsinstitut/Austrian Standards
|
Status |
Superseded
|
SupersededBy |
Standards | Relationship |
EN ISO 1133-1:2011 | Identical |
ISO 1133-1:2011 | Identical |
ONORM EN 12201-3 : 2013 | PLASTICS PIPING SYSTEMS FOR WATER SUPPLY, AND FOR DRAINAGE AND SEWERAGE UNDER PRESSURE - POLYETHYLENE (PE) - PART 3: FITTINGS |
ONORM EN 12201-1 : 2015 | PLASTICS PIPING SYSTEMS FOR WATER SUPPLY, AND FOR DRAINAGE AND SEWERAGE UNDER PRESSURE - POLYETHYLENE (PE) - PART 1: GENERAL |
ONORM ONR CEN/TS 14541 : 2013 | PLASTICS PIPES AND FITTINGS - CHARACTERISTICS FOR UTILISATION OF NON-VIRGIN PVC-U, PP AND PE MATERIALS (CEN/TS 14541:2013) |
ONORM EN 12201-2 : 2013 | PLASTICS PIPING SYSTEMS FOR WATER SUPPLY, AND FOR DRAINAGE AND SEWERAGE UNDER PRESSURE - POLYETHYLENE (PE) - PART 2: PIPES |
ONORM EN 253 : 2015 | DISTRICT HEATING PIPES - PREINSULATED BONDED PIPE SYSTEMS FOR DIRECTLY BURIED HOT WATER NETWORKS - PIPE ASSEMBLY OF STEEL SERVICE PIPE, POLYURETHANE THERMAL INSULATION AND OUTER CASING OF POLYETHYLENE |
ONORM EN 13476-2 : 2015 | PLASTICS PIPING SYSTEMS FOR NON-PRESSURE UNDERGROUND DRAINAGE AND SEWERAGE - STRUCTURED-WALL PIPING SYSTEMS OF UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U), POLYPROPYLENE (PP) AND POLYETHYLENE (PE) - PART 2: SPECIFICATIONS FOR PIPES AND FITTINGS WITH SMOOTH INTERNAL AND EXTERNAL SURFACE AND THE SYSTEM, TYPE A (AMENDMENT) |
ONORM EN 14758-1 : 2012 | PLASTICS PIPING SYSTEMS FOR NON-PRESSURE UNDERGROUND DRAINAGE AND SEWERAGE - POLYPROPYLENE WITH MINERAL MODIFIERS (PP-MD) - PART 1: SPECIFICATIONS FOR PIPES, FITTINGS AND THE SYSTEM |
ONORM EN 1555-3 : 2013 | PLASTICS PIPING SYSTEMS FOR THE SUPPLY OF GASEOUS FUELS - POLYETHYLENE (PE) - PART 3: FITTINGS |
ONORM EN 14427 : 2014 | LPG EQUIPMENT AND ACCESSORIES - TRANSPORTABLE REFILLABLE FULLY WRAPPED COMPOSITE CYLINDERS FOR LPG - DESIGN AND CONSTRUCTION |
ONORM B 5101 : 2013 | SEPARATOR SYSTEMS FOR LIGHT LIQUIDS (E.G. OIL AND PETROL) - SUPPLEMENTARY REQUIREMENTS TO ONORM EN 858-1 AND -2 |
ONORM EN 13476-3 : 2015 | PLASTICS PIPING SYSTEMS FOR NON-PRESSURE UNDERGROUND DRAINAGE AND SEWERAGE - STRUCTURED-WALL PIPING SYSTEMS OF UNPLASTICIZED POLY(VINYL CHLORIDE) (PVC-U), POLYPROPYLENE (PP) AND POLYETHYLENE (PE) - PART 3: SPECIFICATIONS FOR PIPES AND FITTINGS WITH SMOOTH INTERNAL AND PROFILED EXTERNAL SURFACE AND THE SYSTEM, TYPE B (AMENDMENT) |
ONORM EN 1555-1 : 2015 | PLASTICS PIPING SYSTEMS FOR THE SUPPLY OF GASEOUS FUELS - POLYETHYLENE (PE) - PART 1: GENERAL |
ISO 6507-1:2005 | Metallic materials Vickers hardness test Part 1: Test method |
ISO 4287:1997 | Geometrical Product Specifications (GPS) — Surface texture: Profile method — Terms, definitions and surface texture parameters |
ISO 1133-2:2011 | Plastics Determination of the melt mass-flow rate (MFR) and melt volume-flow rate (MVR) of thermoplastics Part 2: Method for materials sensitive to time-temperature history and/or moisture |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.