NF EN 62337 : OCT 2014
Current
The latest, up-to-date edition.
COMMISSIONING OF ELECTRICAL, INSTRUMENTATION AND CONTROL SYSTEMS IN THE PROCESS INDUSTRY - SPECIFIC PHASES AND MILESTONES
12-01-2013
INTRODUCTION
1 Scope
2 Terms and definitions
3 General preparations before acceptance of plant
4 Completion of erection
4.1 Mechanical checks and tests
4.2 Procedure
5 Precommissioning (mechanical completion)
5.1 General
5.2 Procedure
6 Commissioning
6.1 General
6.2 Procedure
7 Performance test and acceptance of plant
7.1 General
7.2 Conditions for commencement of performance test
7.3 Execution of performance test
7.4 Evaluation and report of performance test
Annex A (informative) List of documents to be used for
the precommissioning and commissioning phase
Annex B (informative) Description of precommissioning
activities
Annex C (informative) Mechanical completion certificate
Annex D (informative) Description of commissioning activities
Annex E (informative) Acceptance of plant certificate
Annex F (informative) Project-specific items
Specifies specific phases and milestones in the commissioning of electrical, instrumentation and control systems in the process industry.
DevelopmentNote |
Indice de classement: C46-072. PR NF EN 62337 February 2006. (02/2006) PR NF EN 62337 October 2010. (10/2010)
|
DocumentType |
Standard
|
PublisherName |
Association Francaise de Normalisation
|
Status |
Current
|
Standards | Relationship |
BS EN 62337:2012 | Identical |
NBN EN 62337 : 2012 | Identical |
DIN EN 62337 : 2013 | Identical |
EN 62337:2012 | Identical |
IEC 62337:2012 | Identical |
I.S. EN 62337:2012 | Identical |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.