IEC 62382:2012
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Control systems in the process industry - Electrical and instrumentation loop check
Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users
14-08-2024
English - French
08-11-2012
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
4 Order of loop check and cold commissioning
in the project schedule
5 Loop check content
6 Loop check procedure
7 Documents and test sheets
8 Quality assurance
9 Safety aspects
Annex A (informative) - Test report for analogue input loop
Annex B (informative) - Test report for binary input loop
Annex C (informative) - Test report for analogue output loop
Annex D (informative) - Test report for binary output loop
Annex E (informative) - Test report for motors and variable
frequency drives
IEC 62382:2012 describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). This second edition cancels and replaces the first edition published in 2006 and constitutes a technical revision. The main changes with respect to the previous edition are: The definition of the documents mentioned in the standards is in accordance with IEC 62708: Documents for Electrical and Instrumentation Projects in the Process Industry. Subclause 6.3 has been revised.
Committee |
TC 65/SC 65E
|
DevelopmentNote |
Supersedes IEC PAS 62382. (11/2006) Stability date: 2021. (09/2017)
|
DocumentType |
Standard
|
Pages |
42
|
PublisherName |
International Electrotechnical Committee
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
Standards | Relationship |
NF EN 62382 : 2014 | Identical |
NEN EN IEC 62382 : 2013 | Identical |
PN EN 62382 : 2013 | Identical |
DIN EN 62382 : 2014 | Identical |
VDE 0810-82 : 2014 | Identical |
BS EN 62382:2013 | Identical |
CEI EN 62382 : 2013 | Identical |
EN 62382:2013 | Identical |
UNE-EN 62382:2013 | Identical |
PNE-FprEN 62382 | Identical |
13/30287730 DC : 0 | BS EN 62828 ED 1.0 - REFERENCE CONDITIONS AND PROCEDURES FOR INDUSTRIAL MEASUREMENT TRANSMITTERS - PART 1: GENERAL PROCEDURES FOR ALL TYPES OF TRANSMITTERS |
IEC 62828-1:2017 | Reference conditions and procedures for testing industrial and process measurement transmitters - Part 1: General procedures for all types of transmitters |
CEI 65-186 : 2010 | GUIDELINE ON THE APPLICATION OF THE STANDARD SERIES CEI EN 61511 FUNCTIONAL SAFETY - SAFETY INSTRUMENTED SYSTEMS FOR THE PROCESS INDUSTRY SECTOR |
IEC 62708:2015 | Documents kinds for electrical and instrumentation projects in the process industry |
IEC 62337:2012 | Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones |
IEC 62424:2016 | Representation of process control engineering - Requests in P&I diagrams and data exchange between P&ID tools and PCE-CAE tools |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.