IEC 62382:2006
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Electrical and instrumentation loop check
Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users
31-12-2021
English
15-11-2006
describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. Is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). It does not include a detailed checkout of power distribution systems, except as they relate to the loops being checked (i.e. a motor starter or a power supply to a four-wire transmitter).
Committee |
TC 65/SC 65E
|
DocumentType |
Standard
|
Pages |
18
|
PublisherName |
International Electrotechnical Committee
|
Status |
Superseded
|
SupersededBy |
Standards | Relationship |
UNE-EN 62382:2013 | Identical |
UNE-EN 62382:2007 | Identical |
PNE-prEN 62382 | Identical |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.