IEC 62305-3:2010
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Protection against lightning - Part 3: Physical damage to structures and life hazard
Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users
12-09-2024
English, English - French, Spanish, Castilian
09-12-2010
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Lightning protection system (LPS)
5 External lightning protection system
6 Internal lightning protection system
7 Maintenance and inspection of an LPS
8 Protection measures against injury to living
beings due to touch and step voltages
Annex A (normative) - Positioning the air-termination
system
Annex B (normative) - Minimum cross-section of the
entering cable screen in order to avoid
dangerous sparking
Annex C (informative) - Evaluation of the separation
distance s
Annex D (normative) - Additional information for LPS
in the case of structures with a risk of explosion
Annex E (informative) - Guidelines for the design,
construction, maintenance and inspection
of lightning protection systems
Bibliography
IEC 62305-3:2010 provides the requirements for protection of a structure against physical damage by means of a lightning protection system (LPS), and for protection against injury to living beings due to touch and step voltages in the vicinity of an LPS (see IEC 62305-1). This second edition cancels and replaces the first edition, published in 2006, and constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition:
1) Minimum thicknesses of metal sheets or metal pipes given in Table 3 for air-termination systems are assumed as not able to prevent hot-spot problems.
2) Steel with electro-deposited copper is introduced as material suitable for LPS.
3) Some cross-sectional areas of LPS conductors were slightly modified.
4) For bonding purposes, isolating spark gaps are used for metal installations and SPD for internal systems.
5) Two methods simplified and detailed are provided for evaluation of separation distance.
6) Protection measures against injuries of living beings due to electric shock are considered also inside the structure.
7) Improved information for LPS in the case of structures with a risk of explosion are given in Annex D (normative).
This bilingual version (2012-06) corresponds to the monolingual English version, published in 2010-12.
Committee |
TC 81
|
DevelopmentNote |
Supersedes IEC 61024-1 and IEC 61024-1-2 (01/2006) A Bilingual edition has been published. (07/2012) Stability Date: 2018. (10/2012)
|
DocumentType |
Standard
|
Pages |
155
|
PublisherName |
International Electrotechnical Committee
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
Standards | Relationship |
SAC GB/T 21714-3 : 2015 | Identical |
NF EN 62305-3 : 2012 | Identical |
VDE 0185-305-3:2011-10 | Identical |
NBN EN 62305-3 : 2011 | Identical |
DIN EN 62305-3:2011-10 | Identical |
EN 62305-3:2011 | Identical |
SN EN 62305-3 : 2006 | Identical |
04/30116083 DC : DRAFT JUL 2004 | IEC 62305-5 - PROTECTION AGAINST LIGHTNING - PART 5: SERVICES |
03/305096 DC : DRAFT MAR 2003 | IEC 62305-2 - PROTECTION AGAINST LIGHTNING - PART 2: RISK MANAGEMENT |
14/30316036 DC : 0 | BS EN 61643-32 - LOW-VOLTAGE SURGE PROTECTIVE DEVICES - SURGE PROTECTIVE DEVICES FOR SPECIFIC USE INCLUDING D.C. - PART 32: SELECTION AND APPLICATION PRINCIPLES - SPDS CONNECTED TO PHOTOVOLTAIC INSTALLATIONS |
BS IEC 62855:2016 | Nuclear power plants. Electrical power systems. Electrical power systems analysis |
13/30289140 DC : 0 | BS EN 60364-9-1 ED 1.0 - LOW-VOLTAGE ELECTRICAL INSTALLATIONS - PART 9-1: INSTALLATION DESIGN AND,,SAFETY REQUIREMENTS FOR PHOTOVOLTAIC POWER SYSTEMS (PV) |
UNE-EN 61400-24:2011 | Wind turbines - Part 24: Lightning protection |
EN 60728-11:2017 | Cable networks for television signals, sound signals and interactive services - Part 11: Safety |
UNI EN 1474-1 : 2009 | INSTALLATION AND EQUIPMENT FOR LIQUEFIED NATURAL GAS - DESIGN AND TESTING OF MARINE TRANSFER SYSTEMS - PART 1: DESIGN AND TESTING OF TRANSFER ARMS |
15/30314469 DC : 0 | BS EN 62548 ED.1 - PHOTOVOLTAIC (PV) ARRAYS - DESIGN REQUIREMENTS |
BS EN 62305-4:2011 | Protection against lightning Electrical and electronic systems within structures |
S.R. HD 60364-7-705:2007 | LOW-VOLTAGE ELECTRICAL INSTALLATIONS - PART 7-705: REQUIREMENTS FOR SPECIAL INSTALLATIONS OR LOCATIONS - AGRICULTURAL AND HORTICULTURAL PREMISES |
I.S. EN 62561-4:2017 | LIGHTNING PROTECTION SYSTEM COMPONENTS (LPSC) - PART 4: REQUIREMENTS FOR CONDUCTOR FASTENERS |
BS IEC 62676-4 : 2014 | VIDEO SURVEILLANCE SYSTEMS FOR USE IN SECURITY APPLICATIONS - PART 4: APPLICATION GUIDELINES |
09/30198043 DC : 0 | BS EN 1127-1 - EXPLOSIVE ATMOSPHERES - EXPLOSION PREVENTION AND PROTECTION - PART 1: BASIC CONCEPTS AND METHODOLOGY |
BS EN 1090-5:2017 | Execution of steel structures and aluminium structures Technical requirements for cold-formed structural aluminium elements and cold-formed structures for roof, ceiling, floor and wall applications |
BS EN 61400-1 : 2005 | WIND TURBINES - PART 1: DESIGN REQUIREMENTS |
BS EN 61822:2009 | Electrical installations for lighting and beaconing of aerodromes. Constant current regulators |
CEI EN 62305-1 : 2013 | PROTECTION AGAINST LIGHTNING - PART 1: GENERAL PRINCIPLES |
BS EN 50164-1:2008 | Lightning protection components (LPC) Requirements for connection components |
BS EN 50164-5:2009 | Lightning protection components (LPC) Requirements for earth electrode inspection housings and earth electrode seals |
UNE-EN 1090-5:2017 | Execution of steel structures and aluminium structures - Part 5: Technical requirements for cold-formed structural aluminium elements and cold-formed structures for roof, ceiling, floor and wall applications |
PREN 12976-2 : DRAFT 2014 | THERMAL SOLAR SYSTEMS AND COMPONENTS - FACTORY MADE SYSTEMS - PART 2: TEST METHODS |
CSA C61400-3 : 2011 : R2016 | WIND TURBINES - PART 3: DESIGN REQUIREMENTS FOR OFFSHORE WIND TURBINES |
09/30197921 DC : 0 | BS EN 62561-4 ED1 - REQUIREMENTS FOR LIGHTNING PROTECTION SYSTEM COMPONENTS (LPSC) - PART 4: REQUIREMENTS FOR FASTENERS |
I.S. EN 50174-1:2009 | INFORMATION TECHNOLOGY - CABLING INSTALLATION - PART 1: INSTALLATION SPECIFICATION AND QUALITY ASSURANCE |
EN 62561-3:2017 | Lightning Protection System Components (LPSC) - Part 3: Requirements for isolating spark gaps (ISG) |
BS EN 60728-11:2017 | Cable networks for television signals, sound signals and interactive services Safety |
I.S. EN 62676-4:2015 | VIDEO SURVEILLANCE SYSTEMS FOR USE IN SECURITY APPLICATIONS - PART 4: APPLICATION GUIDELINES |
CSA Z463 : 2013 | GUIDELINE ON MAINTENANCE OF ELECTRICAL SYSTEMS |
I.S. EN 1474-1:2008 | INSTALLATION AND EQUIPMENT FOR LIQUEFIED NATURAL GAS - DESIGN AND TESTING OF MARINE TRANSFER SYSTEMS - PART 1: DESIGN AND TESTING OF TRANSFER ARMS |
I.S. EN 50164-6:2009 | LIGHTNING PROTECTION COMPONENTS (LPC) - PART 6: REQUIREMENTS FOR LIGHTNING STRIKE COUNTERS |
IEC 62561-4:2010 | Lightning protection system components (LPSC) - Part 4: Requirements for conductor fasteners |
ISO/IEC 14763-2:2012 | Information technology Implementation and operation of customer premises cabling Part 2: Planning and installation |
UTEC 17 100-2 : 2005 | PROTECTION AGAINST LIGHTNING - PART 2: RISK MANAGEMENT |
NF EN 50164-2 : 2008 | LIGHTNING PROTECTION COMPONENTS (LPC) - PART 2: REQUIREMENTS FOR CONDUCTORS AND EARTH ELECTRODES |
I.S. HD 60364-7-705:2007 | LOW-VOLTAGE ELECTRICAL INSTALLATIONS - - PART 7-705: REQUIREMENTS FOR SPECIAL INSTALLATIONS OR LOCATIONS - AGRICULTURAL AND HORTICULTURAL PREMISES (IEC 60364-7-705:2006 (MOD)) |
I.S. EN 62561-5:2017 | LIGHTNING PROTECTION SYSTEM COMPONENTS (LPSC) - PART 5: REQUIREMENTS FOR EARTH ELECTRODE INSPECTION HOUSINGS AND EARTH ELECTRODE SEALS |
NFPA 780 : 2017 | INSTALLATION OF LIGHTNING PROTECTION SYSTEMS |
UNE-EN 1127-1:2012 | Explosive atmospheres - Explosion prevention and protection - Part 1: Basic concepts and methodology |
BS EN 50174-2 : 2009 | INFORMATION TECHNOLOGY - CABLING INSTALLATION - PART 2: INSTALLATION PLANNING AND PRACTICES INSIDE BUILDINGS |
EN 62561-2:2012 | Lightning Protection System Components (LPSC) - Part 2: Requirements for conductors and earth electrodes |
CLC/TS 61643-22:2016 | Low-voltage surge protective devices - Part 22: Surge protective devices connected to telecommunications and signalling networks - Selection and application principles |
EN 50164-4:2008 | Lightning Protection Components (LPC) - Part 4: Requirements for conductor fasteners |
EN 62305-4:2011/AC:2016 | PROTECTION AGAINST LIGHTNING - PART 4: ELECTRICAL AND ELECTRONIC SYSTEMS WITHIN STRUCTURES (IEC 62305-4:2010) |
DIN EN 1090-5:2017-07 | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 5: TECHNICAL REQUIREMENTS FOR COLD-FORMED STRUCTURAL ALUMINIUM ELEMENTS AND COLD-FORMED STRUCTURES FOR ROOF, CEILING, FLOOR AND WALL APPLICATIONS |
CLC/TS 50544:2010 | Low voltage d.c. surge protective device for traction systems - Selection and application rules for surge arresters |
EN 62253 : 2011 | PHOTOVOLTAIC PUMPING SYSTEMS - DESIGN QUALIFICATION AND PERFORMANCE MEASUREMENTS |
EN 61822:2009 | ELECTRICAL INSTALLATIONS FOR LIGHTING AND BEACONING OF AERODROMES - CONSTANT CURRENT REGULATORS |
EN 61400-3:2009 | Wind turbines - Part 3: Design requirements for offshore wind turbines |
DIN EN 12976-1:2017-04 | Thermal solar systems and components - Factory made systems - Part 1: General requirements |
EN 50164-1:2008 | Lightning Protection Components (LPC) - Part 1: Requirements for connection components |
HD 60364-5-54:2011/A11:2017 | LOW-VOLTAGE ELECTRICAL INSTALLATIONS - PART 5-54: SELECTION AND ERECTION OF ELECTRICAL EQUIPMENT - EARTHING ARRANGEMENTS AND PROTECTIVE CONDUCTORS |
EN 62561-5:2017 | Lightning protection system components (LPSC) - Part 5: Requirements for earth electrode inspection housings and earth electrode seals |
I.S. EN 50164-5:2009 | LIGHTNING PROTECTION COMPONENTS (LPC) - PART 5: REQUIREMENTS FOR EARTH ELECTRODE INSPECTION HOUSINGS AND EARTH ELECTRODE SEALS |
DIN EN 1474-1:2009-03 | INSTALLATION AND EQUIPMENT FOR LIQUEFIED NATURAL GAS - DESIGN AND TESTING OF MARINE TRANSFER SYSTEMS - PART 1: DESIGN AND TESTING OF TRANSFER ARMS |
BS EN 61400-3:2009 | Wind turbines Design requirements for offshore wind turbines |
17/30361394 DC : 0 | BS EN 50174-1 - INFORMATION TECHNOLOGY - CABLING INSTALLATION - PART 1: INSTALLATION SPECIFICATION AND QUALITY ASSURANCE |
15/30326957 DC : 0 | BS EN 62561-4 ED. 2 - LIGHTNING PROTECTION SYSTEM COMPONENTS (LPSC) - PART 4: REQUIREMENTS FOR CONDUCTOR FASTENERS |
BS EN 50164-7:2008 | Lightning protection components (LPC) Requirements for earthing enhancing compounds |
PD CLC/TS 61643-22:2016 | Low-voltage surge protective devices Surge protective devices connected to telecommunications and signalling networks. Selection and application principles |
DD CEN/TS 12977-5:2010 | Thermal solar systems and components. Custom built systems Performance test methods for control equipment |
15/30324832 DC | BS EN 62305-4. Protection against lightning. Part 4. Electrical and electronic systems within structures |
IEC 62305-4:2010 | Protection against lightning - Part 4: Electrical and electronic systems within structures |
09/30206286 DC : DRAFT JUNE 2009 | BS EN 62561-6 ED1 - REQUIREMENTS FOR LIGHTNING PROTECTION SYSTEM COMPONENTS (LPSC) - PART 6: REQUIREMENTS FOR LIGHTNING STRIKE COUNTERS |
EN 62676-4:2015 | Video surveillance systems for use in security applications - Part 4: Application guidelines |
07/30166781 DC : 0 | BS EN 50164-2 AMD 2 - LIGHTNING PROTECTION COMPONENTS (LPC) - PART 2: REQUIREMENTS FOR CONDUCTORS AND EARTH ELECTRODES |
09/30206282 DC : DRAFT JUNE 2009 | BS EN 62561-5 ED1 - REQUIREMENTS FOR LIGHTNING PROTECTION SYSTEM COMPONENTS (LPSC) - PART 5: REQUIREMENTS FOR EARTH ELECTRODE INSPECTION HOUSINGS AND EARTH ELECTRODE SEALS |
BS EN 62561-4:2017 | Lightning protection system components (LPSC) Requirements for conductor fasteners |
NF EN 50164-6 : 2009 | LIGHTNING PROTECTION COMPONENTS (LPC) - PART 6: REQUIREMENTS FOR LIGHTNING STRIKE COUNTERS |
12/30270980 DC : 0 | BS EN 1127-2 - EXPLOSIVE ATMOSPHERES - EXPLOSION PREVENTION AND PROTECTION - PART 2: BASIC CONCEPTS AND METHODOLOGY FOR MINING |
PD CLC/TR 50450:2006 | Resistibility requirements for equipment having (a) telecommunication port(s) |
I.S. EN 60728-11:2017 | CABLE NETWORKS FOR TELEVISION SIGNALS, SOUND SIGNALS AND INTERACTIVE SERVICES - PART 11: SAFETY |
CEI EN 62561-2 : 2013 | LIGHTNING PROTECTION SYSTEM COMPONENTS (LPSC) - PART 2: REQUIREMENTS FOR CONDUCTORS AND EARTH ELECTRODES |
08/30180781 DC : DRAFT APR 2008 | BS EN 50164-6 - LIGHTNING PROTECTION COMPONENTS (LPC) - PART 6: REQUIREMENTS FOR LIGHTNING STRIKE COUNTERS |
DIN EN 12977-5:2016-08 (Draft) | THERMAL SOLAR SYSTEMS AND COMPONENTS - CUSTOM BUILT SYSTEMS - PART 5: PERFORMANCE TEST METHODS FOR CONTROL EQUIPMENT |
S.R. CLC/TS 50544:2010 | LOW VOLTAGE D.C. SURGE PROTECTIVE DEVICE FOR TRACTION SYSTEMS - SELECTION AND APPLICATION RULES FOR SURGE ARRESTERS |
EN 50174-2 : 2009 AMD 2 2014 | INFORMATION TECHNOLOGY - CABLING INSTALLATION - PART 2: INSTALLATION PLANNING AND PRACTICES INSIDE BUILDINGS |
IEC 62561-5:2011 | Lightning protection system components (LPSC) - Part 5: Requirements for earth electrode inspection housings and earth electrode seals |
CLC/TS 50539-22:2010 | Low-voltage surge protective devices - Surge protective devices for specific application including d.c. - Part 22: Selection and application principles - Wind turbine applications |
I.S. EN 50174-2:2009 | INFORMATION TECHNOLOGY - CABLING INSTALLATION - PART 2: INSTALLATION PLANNING AND PRACTICES INSIDE BUILDINGS |
I.S. CLC/TR 50450:2006 | RESISTIBILITY REQUIREMENTS FOR EQUIPMENT HAVING (A) TELECOMMUNICATION PORT(S) |
I.S. EN 50164-3:2006 | LIGHTNING PROTECTION COMPONENTS (LPC) - PART 3: REQUIREMENTS FOR ISOLATING SPARK GAPS |
I.S. EN 50164-2:2008 | LIGHTNING PROTECTION COMPONENTS (LPC) - PART 2: REQUIREMENTS FOR CONDUCTORS AND EARTH ELECTRODES |
S.R. HD 60364-7-712:2016 | LOW-VOLTAGE ELECTRICAL INSTALLATIONS - PART 7-712: REQUIREMENTS FOR SPECIAL INSTALLATIONS OR LOCATIONS - PHOTOVOLTAIC (PV) SYSTEMS |
BS EN 50174-1 : 2009 | INFORMATION TECHNOLOGY - CABLING INSTALLATION - PART 1: INSTALLATION SPECIFICATION AND QUALITY ASSURANCE |
IEC TS 62561-8:2018 | Lightning protection system components (LPSC) - Part 8: Requirements for components for isolated LPS |
BS EN 1127-1:2011 | Explosive atmospheres. Explosion prevention and protection Basic concepts and methodology |
CEI EN 62305-4 : 2013 | PROTECTION CONTRE LA FOUDRE - PARTIE 4: RESEAUX DE PUISSANCE ET DE COMMUNICATION DANS LES STRUCTURES |
EN 50310:2016 | Telecommunications bonding networks for buildings and other structures |
IEC 61643-22:2015 | Low-voltage surge protective devices - Part 22: Surge protective devices connected to telecommunications and signalling networks - Selection and application principles |
IEC 60364-7-705:2006 | Low-voltage electrical installations - Part 7-705: Requirements for special installations or locations - Agricultural and horticultural premises |
UNE-HD 60364-4-444:2013 | Low-voltage electrical installations -- Part 4-444: Protection for safety - Protection against voltage disturbances and electromagnetic disturbances |
UNE-EN 50310:2016 | Telecommunications bonding networks for buildings and other structures |
17/30354643 DC : 0 | BS EN 62933-2-1 - ELECTRIC ENERGY STORAGE (ESS) SYSTEMS - PART 2-1: UNIT PARAMETERS AND TESTING METHODS - GENERAL SPECIFICATION |
BS EN 62253:2011 | Photovoltaic pumping systems. Design qualification and performance measurements |
DIN EN 1127-1:2011-10 | EXPLOSIVE ATMOSPHERES - EXPLOSION PREVENTION AND PROTECTION - PART 1: BASIC CONCEPTS AND METHODOLOGY |
EN 61400-1:2005/A1:2010 | WIND TURBINES - PART 1: DESIGN REQUIREMENTS |
I.S. EN 12976-1:2017 | THERMAL SOLAR SYSTEMS AND COMPONENTS - FACTORY MADE SYSTEMS - PART 1: GENERAL REQUIREMENTS |
EN 60079-14:2014/AC:2016 | EXPLOSIVE ATMOSPHERES - PART 14: ELECTRICAL INSTALLATIONS DESIGN, SELECTION AND ERECTION (IEC 60079-14:2013/COR1:2016) |
VDI 2166 Blatt 2:2015-10 | Planning of electrical installations in buildings - Advice for electric mobility |
VDI 3564 Blatt 1:2017-05 | Fire protection - Recommendations for high-bay warehouses |
VDI 2263 Blatt 6:2017-08 | Dust fires and dust explosions - Hazards - assessment - protective measures - Dust fires and explosion protection in dust extracting installations |
VDI 6002 Blatt 1:2014-03 | Solar heating for potable water - Basic principles - System technology and application in residential buildings |
VDI 2262 Blatt 1:2013-06 | Workplace air - Reduction of exposure to air pollutants - Legal principles, terms and definitions, basic organisational measures for industrial safety and environmental protection |
PD CLC/TS 50539-12:2013 | Low-voltage surge protective devices. Surge protective devices for specific application including d.c. Selection and application principles. SPDs connected to photovoltaic installations |
08/30180770 DC : DRAFT APR 2008 | BS EN 50164-3 AMD 1 - LIGHTNING PROTECTION COMPONENTS (LPC) - PART 3: REQUIREMENTS FOR ISOLATING SPARK GAPS |
11/30246431 DC : 0 | BS EN 62548 - DESIGN REQUIREMENTS FOR PHOTOVOLTAIC (PV) ARRAYS |
BS EN 50164-3 : 2006 | LIGHTNING PROTECTION COMPONENTS (LPC) - PART 3: REQUIREMENTS FOR ISOLATING SPARK GAPS |
DD CLC/TS 50544:2010 | Low voltage d.c. surge protective device for traction systems. Selection and application rules for surge arresters |
09/30198231 DC : 0 | BS EN 62561-7 ED1 - REQUIREMENTS FOR LIGHTNING PROTECTION SYSTEM COMPONENTS (LPSC) - PART 7: REQUIREMENTS FOR EARTHING ENHANCING COMPOUNDS |
BS EN 50164-6:2009 | Lightning protection components (LPC) Requirements for lightning strike counters |
11/30247849 DC : 0 | BS EN 12977-5 - THERMAL SOLAR SYSTEMS AND COMPONENTS - CUSTOM BUILT SYSTEMS - PART 5: PERFORMANCE TEST METHODS FOR CONTROL EQUIPMENT |
15/30326949 DC : 0 | BS EN 62561-2 ED. 2 - LIGHTNING PROTECTION SYSTEM COMPONENTS (LPSC) - PART 2: REQUIREMENTS FOR CONDUCTORS AND EARTH ELECTRODES |
BS EN 50164-4:2008 | Lightning protection components (LPC) Requirements for conductor fasteners |
BS EN 62305-1:2011 | Protection against lightning General principles |
CEI EN 61400-3 : 2009 | WIND TURBINES - PART 3: DESIGN REQUIREMENTS FOR OFFSHORE WIND TURBINES |
NF EN 50164-4 : 2008 | LIGHTNING PROTECTION COMPONENTS (LPC) - PART 4: REQUIREMENTS FOR CONDUCTOR FASTENERS |
07/30174359 DC : DRAFT NOV 2007 | BS EN 62561-2 - LIGHTNING PROTECTION SYSTEM COMPONENTS (LPSC) - PART 2: REQUIREMENTS FOR CONDUCTORS AND EARTH ELECTRODES |
UNE-EN 62305-1:2011 | Protection against lightning -- Part 1: General principles |
UNE-EN ISO 16904:2016 | Petroleum and natural gas industries - Design and testing of LNG marine transfer arms for conventional onshore terminals (ISO 16904:2016) |
07/30152812 DC : DRAFT AUG 2007 | BS EN 50174-2 - INFORMATION TECHNOLOGY - CABLING INSTALLATION - PART 2: INSTALLATION PLANNING AND PRACTICES INSIDE BUILDINGS |
08/30191345 DC : 0 | BS EN 60728-11 ED.3 - CABLE NETWORKS FOR TELEVISION SIGNALS, SOUND SIGNALS AND INTERACTIVE SERVICES - PART 11: SAFETY |
CEI CLC/TS 50544 : 2011 | LOW VOLTAGE D.C. SURGE PROTECTIVE DEVICE FOR TRACTION SYSTEMS - SELECTION AND APPLICATION RULES FOR SURGE ARRESTERS |
UNE-EN 62561-2:2012 | Lightning Protection System Components (LPSC) - Part 2: Requirements for conductors and earth electrodes |
HD 60364-7-705:2007/A12:2017 | LOW-VOLTAGE ELECTRICAL INSTALLATIONS - PART 7-705: REQUIREMENTS FOR SPECIAL INSTALLATIONS OR LOCATIONS - AGRICULTURAL AND HORTICULTURAL PREMISES |
NF EN 1474-1 : 2009 | INSTALLATION AND EQUIPMENT FOR LIQUEFIED NATURAL GAS - DESIGN AND TESTING OF MARINE TRANSFER SYSTEMS - PART 1: DESIGN AND TESTING OF TRANSFER ARMS |
I.S. EN 62561-2:2012 | LIGHTNING PROTECTION SYSTEM COMPONENTS (LPSC) - PART 2: REQUIREMENTS FOR CONDUCTORS AND EARTH ELECTRODES (IEC 62561-2:2012 (MOD)) |
IEC TS 62257-7-1:2010 | Recommendations for small renewable energy and hybrid systems for rural electrification - Part 7-1: Generators - Photovoltaic generators |
EN IEC 62933-2-1:2018 | Electrical energy storage (EES) systems - Part 2-1: Unit parameters and testing methods - General specification |
S.R. CEN TS 12977-5:2010 | THERMAL SOLAR SYSTEMS AND COMPONENTS - CUSTOM BUILT SYSTEMS - PART 5: PERFORMANCE TEST METHODS FOR CONTROL EQUIPMENT |
CSA C61400-1 : 2014 | WIND TURBINES - PART 1: DESIGN REQUIREMENTS |
I.S. EN IEC 62933-2-1:2018 | ELECTRICAL ENERGY STORAGE (EES) SYSTEMS - PART 2-1: UNIT PARAMETERS AND TESTING METHODS - GENERAL SPECIFICATION |
I.S. EN 50164-4:2008 | LIGHTNING PROTECTION COMPONENTS (LPC) - PART 4: REQUIREMENTS FOR CONDUCTOR FASTENERS |
I.S. EN 62305-2:2012 | PROTECTION AGAINST LIGHTNING - PART 2: RISK MANAGEMENT (IEC 62305-2:2010 (MOD)) |
EN 62561-4:2017 | Lightning protection system components (LPSC) - Part 4: Requirements for conductor fasteners |
ISO/TS 20100:2008 | Gaseous hydrogen Fuelling stations |
I.S. EN 62305-4:2011 | PROTECTION AGAINST LIGHTNING - PART 4: ELECTRICAL AND ELECTRONIC SYSTEMS WITHIN STRUCTURES |
I.S. EN 1090-5:2017 | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 5: TECHNICAL REQUIREMENTS FOR COLD-FORMED STRUCTURAL ALUMINIUM ELEMENTS AND COLD-FORMED STRUCTURES FOR ROOF, CEILING, FLOOR AND WALL APPLICATIONS |
S.R. CLC/TS 61643-22:2016 | LOW-VOLTAGE SURGE PROTECTIVE DEVICES - PART 22: SURGE PROTECTIVE DEVICES CONNECTED TO TELECOMMUNICATIONS AND SIGNALLING NETWORKS - SELECTION AND APPLICATION PRINCIPLES |
UNI EN 12977-5 : 2012 | THERMAL SOLAR SYSTEMS AND COMPONENTS - CUSTOM BUILT SYSTEMS - PART 5: PERFORMANCE TEST METHODS FOR CONTROL EQUIPMENT |
EN IEC 62561-2:2018 | Lightning protection system components (LPSC) - Part 2: Requirements for conductors and earth electrodes |
I.S. EN 50164-1:2008 | LIGHTNING PROTECTION COMPONENTS (LPC) - PART 1: REQUIREMENTS FOR CONNECTION COMPONENTS |
BS EN 12976-2:2017 | Thermal solar systems and components. Factory made systems Test methods |
CLC/TR 50450:2006 | Resistibility requirements for equipment having (a) telecommunication port(s) |
I.S. EN 50310:2016 | TELECOMMUNICATIONS BONDING NETWORKS FOR BUILDINGS AND OTHER STRUCTURES |
S.R. CLC/TS 61643-12:2009 | LOW-VOLTAGE SURGE PROTECTIVE DEVICES - PART 12: SURGE PROTECTIVE DEVICES CONNECTED TO LOW-VOLTAGE POWER DISTRIBUTION SYSTEMS - SELECTION AND APPLICATION PRINCIPLES |
BS EN 1127-1:2019 | Explosive atmospheres. Explosion prevention and protection Basic concepts and methodology |
I.S. EN 12976-2:2017 | THERMAL SOLAR SYSTEMS AND COMPONENTS - FACTORY MADE SYSTEMS - PART 2: TEST METHODS |
EN 12976-2:2017 | Thermal solar systems and components - Factory made systems - Part 2: Test methods |
UNE-EN 60728-11:2012 | Cable networks for television signals, sound signals and interactive services - Part 11: Safety |
IEC 62933-2-1:2017 | Electrical energy storage (EES) systems - Part 2-1: Unit parameters and testing methods - General specification |
I.S. EN 1127-1:2011 | EXPLOSIVE ATMOSPHERES - EXPLOSION PREVENTION AND PROTECTION - PART 1: BASIC CONCEPTS AND METHODOLOGY |
IEC 62676-4:2014 | Video surveillance systems for use in security applications - Part 4: Application guidelines |
IEC TR 60479-4:2011 | Effects of current on human beings and livestock - Part 4: Effects of lightning strokes |
IEC 62561-2:2018 | Lightning protection system components (LPSC) - Part 2: Requirements for conductors and earth electrodes |
EEMUA 186 : 2016 | A PRACTITIONER'S HANDBOOK FOR POTENTIALLY EXPLOSIVE ATMOSPHERES |
DIN EN 12976-1:2014-07 (Draft) | THERMAL SOLAR SYSTEMS AND COMPONENTS - FACTORY MADE SYSTEMS - PART 1: GENERAL REQUIREMENTS |
UNE-HD 60364-7-712:2017 | Low-voltage electrical installations - Part 7-712: Requirements for special installations or locations - Photovoltaic (PV) systems |
UNE-EN 60079-14:2016 | Explosive atmospheres - Part 14: Electrical installations design, selection and erection |
DD CLC/TS 61643-12:2009 | Low-voltage surge protective devices Surge protective devices connected to low-voltage power distribution systems. Selection and application principles |
ISO 16904:2016 | Petroleum and natural gas industries Design and testing of LNG marine transfer arms for conventional onshore terminals |
BS EN 60079-14:2014 | Explosive atmospheres Electrical installations design, selection and erection |
UNE-EN 62305-4:2011 | Protection against lightning -- Part 4: Electrical and electronic systems within structures |
EN 12976-1:2017 | Thermal solar systems and components - Factory made systems - Part 1: General requirements |
EN 1474-1:2008 | Installation and equipment for liquefied natural gas - Design and testing of marine transfer systems - Part 1: Design and testing of transfer arms |
EN 50164-3 : 2006 AMD 1 2009 | LIGHTNING PROTECTION COMPONENTS (LPC) - PART 3: REQUIREMENTS FOR ISOLATING SPARK GAPS |
03/305095 DC : DRAFT MAR 2003 | IEC 62305-4 - PROTECTION AGAINST LIGHTNING - PART 4: ELECTRICAL AND ELECTRONIC SYSTEMS WITHIN STRUCTURES |
BS EN 62676-4:2015 | Video surveillance systems for use in security applications Application guidelines |
CEI EN 61400-24 : 2011 | WIND TURBINES - PART 24: LIGHTNING PROTECTION |
CLC/TS 50539-12:2013 | Low-voltage surge protective devices - Surge protective devices for specific application including d.c. - Part 12: Selection and application principles - SPDs connected to photovoltaic installations |
NF EN 62305-4 : 2012 | PROTECTION AGAINST LIGHTNING - PART 4: ELECTRICAL AND ELECTRONIC SYSTEMS WITHIN STRUCTURES |
IEC 60728-11:2016 | Cable networks for television signals, sound signals and interactive services - Part 11: Safety |
BS EN 50164-2:2008 | Lightning protection components (LPC) Requirements for conductors and earth electrodes |
13/30294291 DC : 0 | BS EN 62561-8 - LIGHTNING PROTECTION SYSTEM COMPONENTS (LPSC) - PART 8: REQUIREMENTS FOR COMPONENTS FOR ISOLATED LPS |
07/30174370 DC : DRAFT NOV 2007 | BS EN 62561-3 - LIGHTNING PROTECTION SYSTEM COMPONENTS (LPSC) - PART 3: REQUIREMENTS FOR ISOLATING SPARK GAPS |
08/30191891 DC : DRAFT OCT 2008 | BS EN 61936-1 - POWER INSTALLATIONS EXCEEDING 1 KV A.C. - PART 1: COMMON RULES |
I.S. EN 61400-1:2005 | WIND TURBINES - PART 1: DESIGN REQUIREMENTS |
CEI EN 62305-2 : 2013 | PROTECTION AGAINST LIGHTNING - PART 2: RISK MANAGEMENT |
BS EN 1474-1:2008 | Installation and equipment for liquefied natural gas. Design and testing of marine transfer systems Design and testing of transfer arms |
13/30278077 DC : 0 | BS EN ISO 16904 - PETROLEUM AND NATURAL GAS INDUSTRIES - DESIGN AND TESTING OF LNG MARINE TRANSFER ARMS FOR CONVENTIONAL ONSHORE TERMINALS |
15/30324821 DC | BS EN 62305-2. Protection against lightning. Part 2. Risk management |
CEI CLC/TS 50539-12 : 2011 | LOW-VOLTAGE SURGE PROTECTIVE DEVICES - SURGE PROTECTIVE DEVICES FOR SPECIFIC APPLICATION INCLUDING D.C. - PART 12: SELECTION AND APPLICATION PRINCIPLES - SPDS CONNECTED TO PHOTOVOLTAIC INSTALLATIONS |
07/30174629 DC : DRAFT DEC 2007 | BS EN 62305-1 - PROTECTION AGAINST LIGHTNING - PART 1: GENERAL PRINCIPLES |
07/30174633 DC : DRAFT DEC 2007 | BS EN 62305-2 - PROTECTION AGAINST LIGHTNING - PART 2: RISK MANAGEMENT |
07/30174637 DC : DRAFT DEC 2007 | BS EN 62305-4 - PROTECTION AGAINST LIGHTNING - PART 4: ELECTRICAL AND ELECTRONIC SYSTEMS WITHIN STRUCTURES |
UNI EN 1127-1 : 2011 | EXPLOSIVE ATMOSPHERES - EXPLOSION PREVENTION AND PROTECTION - PART 1: BASIC CONCEPTS AND METHODOLOGY |
PREN 50174-1 : DRAFT 2017 | INFORMATION TECHNOLOGY - CABLING INSTALLATION - PART 1: INSTALLATION SPECIFICATION AND QUALITY ASSURANCE |
UNE-EN 61822:2011 | Electrical installations for lighting and beaconing of aerodromes - Constant current regulators |
I.S. EN 61400-24:2010 | WIND TURBINES - PART 24: LIGHTNING PROTECTION |
I.S. EN IEC 62688:2018 | CONCENTRATOR PHOTOVOLTAIC (CPV) MODULES AND ASSEMBLIES - SAFETY QUALIFICATION |
S.R. HD 60364-5-54:2011 | LOW-VOLTAGE ELECTRICAL INSTALLATIONS - PART 5-54: SELECTION AND ERECTION OF ELECTRICAL EQUIPMENT - EARTHING ARRANGEMENTS AND PROTECTIVE CONDUCTORS |
I.S. EN 50164-7:2008 | LIGHTNING PROTECTION COMPONENTS (LPC) - PART 7: REQUIREMENTS FOR EARTHING ENHANCING COMPOUNDS |
BS EN 12977-5:2012 | Thermal solar systems and components. Custom built systems Performance test methods for control equipment |
NF EN 50164-5 : 2009 | LIGHTNING PROTECTION COMPONENTS (LPC) - PART 5: REQUIREMENTS FOR EARTH ELECTRODE INSPECTION HOUSINGS AND EARTH ELECTRODE SEALS |
IEC TS 62257-5:2015 | Recommendations for renewable energy and hybrid systems for rural electrification - Part 5: Protection against electrical hazards |
I.S. HD 60364-4-444:2010 | LOW-VOLTAGE ELECTRICAL INSTALLATIONS - PART 4-444: PROTECTION FOR SAFETY - PROTECTION AGAINST VOLTAGE DISTURBANCES AND ELECTROMAGNETIC DISTURBANCES |
I.S. EN 61822:2009 | ELECTRICAL INSTALLATIONS FOR LIGHTING AND BEACONING OF AERODROMES - CONSTANT CURRENT REGULATORS |
IEC 60364-4-44:2007+AMD1:2015+AMD2:2018 CSV | Low-voltage electrical installations - Part 4-44: Protection for safety - Protection against voltage disturbances and electromagnetic disturbances |
IEC 60913:2013 | Railway applications - Fixed installations - Electric traction overhead contact lines |
IEC 62855:2016 | Nuclear power plants - Electrical power systems - Electrical power systems analysis |
IEC 60364-5-54:2011 | Low-voltage electrical installations - Part 5-54: Selection and erection of electrical equipment - Earthing arrangements and protective conductors |
EN 50174-1:2009/A2:2014 | INFORMATION TECHNOLOGY - CABLING INSTALLATION - PART 1: INSTALLATION SPECIFICATION AND QUALITY ASSURANCE |
BS EN 12976-1:2017 | Thermal solar systems and components. Factory made systems General requirements |
PD IEC/TS 62548:2013 | Photovoltaic (PV) arrays. Design requirements |
12/30266531 DC : 0 | BS EN TS 62257-1 - RECOMMENDATIONS FOR SMALL RENEWABLE ENERGY AND HYBRID SYSTEMS FOR RURAL ELECTRIFICATION - PART 1: GENERAL INTRODUCTION TO RURAL ELECTRIFICATION |
UNE-CLC/TS 61643-12:2012 | Low-voltage surge protective devices -- Part 12: Surge protective devices connected to low-voltage power distribution systems - Selection and application principles |
UNE-EN 62253:2012 | Photovoltaic pumping systems - Design qualification and performance measurements |
05/30138005 DC : DRAFT AUG 2005 | IEC 60079-14 ED 4 - ELECTRICAL APPARATUS FOR EXPLOSIVE GAS ATMOSPHERES - PART 14: ELECTRICAL INSTALLATIONS IN HAZARDOUS AREAS (OTHER THAN MINES) |
17/30361391 DC : 0 | BS EN 50174-2 - INFORMATION TECHNOLOGY - CABLING INSTALLATION - PART 2: INSTALLATION PLANNING AND PRACTICES INSIDE BUILDINGS |
IEC 62253:2011 | Photovoltaic pumping systems - Design qualification and performance measurements |
IEC 61400-1:2005+AMD1:2010 CSV | Wind turbines - Part 1: Design requirements |
IEC 61400-3:2009 | Wind turbines - Part 3: Design requirements for offshore wind turbines |
BS EN 50310:2016 | Telecommunications bonding networks for buildings and other structures |
BS IEC 62548:2016 | Photovoltaic (PV) arrays. Design requirements |
EN ISO 16904:2016 | Petroleum and natural gas industries - Design and testing of LNG marine transfer arms for conventional onshore terminals (ISO 16904:2016) |
UNE-EN 61400-1:2006 | Wind turbines - Part 1: Design requirements |
PD 6686:2006 | Guidance on directives, regulations and standards related to prevention of fire and explosion in the process industries |
I.S. EN IEC 62561-2:2018 | LIGHTNING PROTECTION SYSTEM COMPONENTS (LPSC) - PART 2: REQUIREMENTS FOR CONDUCTORS AND EARTH ELECTRODES |
PD ISO/TS 18683:2015 | Guidelines for systems and installations for supply of LNG as fuel to ships |
15/30326953 DC : 0 | BS EN 62561-3 ED. 2 - LIGHTNING PROTECTION SYSTEM COMPONENTS (LPSC) - PART 3: REQUIREMENTS FOR ISOLATING SPARK GAPS (ISG) |
BS EN ISO 16904:2016 | Petroleum and natural gas industries. Design and testing of LNG marine transfer arms for conventional onshore terminals |
BS EN 62561-2:2012 | Lightning Protection System Components (LPSC) Requirements for conductors and earth electrodes |
CEI CLC/TR 50450 : 2006 | RESISTIBILITY REQUIREMENTS FOR EQUIPMENT HAVING (A) TELECOMMUNICATION PORT(S) |
DD CLC/TS 50539-22:2010 | Low-voltage surge protective devices. Surge protective devices for specific application including d.c. Selection and application principles. Wind turbine applications |
07/30174355 DC : DRAFT NOV 2007 | BS EN 62561-1 - LIGHTNING PROTECTION SYSTEM COMPONENTS (LPSC) - PART 1: REQUIREMENTS FOR CONNECTION COMPONENTS |
BS EN 62561-3:2017 | Lightning protection system components (LPSC) Requirements for isolating spark gaps (ISG) |
15/30324817 DC | BS EN 62305-1. Protection against lightning. Part 1. General principles |
14/30298612 DC : 0 | BS EN 12976-2 - THERMAL SOLAR SYSTEMS AND COMPONENTS - FACTORY MADE SYSTEMS - PART 2: TEST METHODS |
S.R. CLC/TS 50539-12:2013 | LOW-VOLTAGE SURGE PROTECTIVE DEVICES - SURGE PROTECTIVE DEVICES FOR SPECIFIC APPLICATION INCLUDING D.C. - PART 12: SELECTION AND APPLICATION PRINCIPLES - SPDS CONNECTED TO PHOTOVOLTAIC INSTALLATIONS |
DD CLC/TS 50539-12:2010 | Low-voltage surge protective devices. Surge protective devices for specific application including d.c. Selection and application principles. SPDs connected to photovoltaic installations |
PD IEC/TR 60479-4:2011 | Effects of current on human beings and livestock Effects of lightning strokes |
IEC 61643-12:2008 | Low-voltage surge protective devices - Part 12: Surge protective devices connected to low-voltage power distribution systems - Selection and application principles |
BS EN 62305-2:2012 | Protection against lightning Risk management |
IEC 61643-32:2017 | Low-voltage surge protective devices - Part 32: Surge protective devices connected to the d.c. side of photovoltaic installations - Selection and application principles |
UNE-EN 62561-4:2011 | Lightning protection system components (LPSC) - Part 4: Requirements for conductor fasteners |
UNE-EN 62561-3:2017 | Lightning Protection System Components (LPSC) - Part 3: Requirements for isolating spark gaps (ISG) |
BS EN 62561-5:2017 | Lightning protection system components (LPSC) Requirements for earth electrode inspection housings and earth electrode seals |
NF EN 50164-7 : 2008 | LIGHTNING PROTECTION COMPONENTS (LPC) - PART 7: REQUIREMENTS FOR EARTHING ENHANCING COMPOUNDS |
I.S. EN 60079-14:2014 | EXPLOSIVE ATMOSPHERES - PART 14: ELECTRICAL INSTALLATIONS DESIGN, SELECTION AND ERECTION |
09/30190333 DC : 0 | BS EN 61400-24 - WIND TURBINES - PART 24: LIGHTNING PROTECTION |
BS EN 61400-24:2010 | Wind turbines Lightning protection |
CSA C61400-3 : 2011 | WIND TURBINES - PART 3: DESIGN REQUIREMENTS FOR OFFSHORE WIND TURBINES |
I.S. EN ISO 16904:2016 | PETROLEUM AND NATURAL GAS INDUSTRIES - DESIGN AND TESTING OF LNG MARINE TRANSFER ARMS FOR CONVENTIONAL ONSHORE TERMINALS (ISO 16904:2016) |
S.R. CLC/TS 50539-22:2010 | LOW-VOLTAGE SURGE PROTECTIVE DEVICES - SURGE PROTECTIVE DEVICES FOR SPECIFIC APPLICATION INCLUDING D.C. - PART 22: SELECTION AND APPLICATION PRINCIPLES - WIND TURBINE APPLICATIONS |
CEI EN 60728-11 : 2014 | CABLE NETWORKS FOR TELEVISION SIGNALS, SOUND SIGNALS AND INTERACTIVE SERVICES - PART 11: SAFETY |
IEC 62561-3:2017 | Lightning protection system components (LPSC) - Part 3: Requirements for isolating spark gaps (ISG) |
CEI CLC/TS 50539-22 : 2012 | LOW-VOLTAGE SURGE PROTECTIVE DEVICES - SURGE PROTECTIVE DEVICES FOR SPECIFIC APPLICATION INCLUDING D.C. - PART 22: SELECTION AND APPLICATION PRINCIPLES - WIND TURBINE APPLICATIONS |
I.S. EN 62253:2011 | PHOTOVOLTAIC PUMPING SYSTEMS - DESIGN QUALIFICATION AND PERFORMANCE MEASUREMENTS |
S.R. HD 60364-4-443:2016 | LOW-VOLTAGE ELECTRICAL INSTALLATIONS - PART 4-44: PROTECTION FOR SAFETY - PROTECTION AGAINST VOLTAGE DISTURBANCES AND ELECTROMAGNETIC DISTURBANCES - CLAUSE 443: PROTECTION AGAINST TRANSIENT OVERVOLTAGES OF ATMOSPHERIC ORIGIN OR DUE TO SWITCHING |
I.S. EN 62305-1:2011 | PROTECTION AGAINST LIGHTNING - PART 1: GENERAL PRINCIPLES |
I.S. HD 60364-5-54:2011 | LOW-VOLTAGE ELECTRICAL INSTALLATIONS - PART 5-54: SELECTION AND ERECTION OF ELECTRICAL EQUIPMENT - EARTHING ARRANGEMENTS AND PROTECTIVE CONDUCTORS |
PREN 1127-2 : DRAFT 2012 | EXPLOSIVE ATMOSPHERES - EXPLOSION PREVENTION AND PROTECTION - PART 2: BASIC CONCEPTS AND METHODOLOGY FOR MINING |
IEC 62305-2:2010 | Protection against lightning - Part 2: Risk management |
I.S. EN 62561-3:2017 | LIGHTNING PROTECTION SYSTEM COMPONENTS (LPSC) - PART 3: REQUIREMENTS FOR ISOLATING SPARK GAPS (ISG) |
EN IEC 62688:2018 | Concentrator photovoltaic (CPV) modules and assemblies - Safety qualification |
NF EN 50164-1 : 2008 | LIGHTNING PROTECTION COMPONENTS (LPC) - PART 1: REQUIREMENTS FOR CONNECTION COMPONENTS |
NF EN 61400-3 : 2009 | WIND TURBINES - PART 3: DESIGN REQUIREMENTS FOR OFFSHORE WIND TURBINES |
I.S. EN 61400-3:2009 | WIND TURBINES - PART 3: DESIGN REQUIREMENTS FOR OFFSHORE WIND TURBINES |
ISO/TS 18683:2015 | Guidelines for systems and installations for supply of LNG as fuel to ships |
IEC 62305-1:2010 | Protection against lightning - Part 1: General principles |
IEC 61822:2009 | Electrical installations for lighting and beaconing of aerodromes - Constant current regulators |
IEC TS 62600-2:2016 | Marine energy - Wave, tidal and other water current converters - Part 2: Design requirements for marine energy systems |
12/30269297 DC : 0 | BS EN 60079-14/ED 5 - EXPLOSIVE ATMOSPHERES - PART 14: ELECTRICAL INSTALLATIONS DESIGN, SELECTION AND ERECTION |
IEC 61400-24:2010 | Wind turbines - Part 24: Lightning protection |
12/30251569 DC | BS IEC 62128-1. Railway applications. Fixed installations. Electrical safety, earthing and the return circuit. Part 1. Protective provisions against electric shock |
DD ISO/TS 20100:2008 | Gaseous hydrogen. Fuelling stations |
09/30205182 DC : 0 | BS EN 50310 - APPLICATION OF EQUIPOTENTIAL BONDING AND EARTHING IN BUILDINGS WITH INFORMATION TECHNOLOGY EQUIPMENT |
PD IEC/TS 62257-5:2015 | Recommendations for renewable energy and hybrid systems for rural electrification Protection against electrical hazards |
EN 1090-5:2017 | Execution of steel structures and aluminium structures - Part 5: Technical requirements for cold-formed structural aluminium elements and cold-formed structures for roof, ceiling, floor and wall applications |
HD 60364-4-443:2016 | Low-voltage electrical installations - Part 4-44: Protection for safety - Protection against voltage disturbances and electromagnetic disturbances - Clause 443: Protection against transient overvoltages of atmospheric origin or due to switching |
EN 62305-4:2011/AC:2016-11 | Protection against lightning - Part 4: Electrical and electronic systems within structures |
EN 62305-2:2012 | Protection against lightning - Part 2: Risk management |
EN 50164-2:2008 | Lightning Protection Components (LPC) - Part 2: Requirements for conductors and earth electrodes |
DIN EN 12977-5:2012-06 | THERMAL SOLAR SYSTEMS AND COMPONENTS - CUSTOM BUILT SYSTEMS - PART 5: PERFORMANCE TEST METHODS FOR CONTROL EQUIPMENT |
HD 60364-7-712:2016 | Low-voltage electrical installations - Part 7-712: Requirements for special installations or locations - Photovoltaic (PV) systems |
EN 1127-1:2011 | Explosive atmospheres - Explosion prevention and protection - Part 1: Basic concepts and methodology |
CEN/TS 12977-5:2010 | Thermal solar systems and components - Custom built systems - Part 5: Performance test methods for control equipment |
EN 50164-5:2009 | Lightning Protection Components (LPC) - Part 5: Requirements for earth electrode inspection housings and earth electrode seals |
HD 60364-4-444:2010/AC:2012 | LOW-VOLTAGE ELECTRICAL INSTALLATIONS - PART 4-444: PROTECTION FOR SAFETY - PROTECTION AGAINST VOLTAGE DISTURBANCES AND ELECTROMAGNETIC DISTURBANCES |
EN 61400-24:2010 | Wind turbines - Part 24: Lightning protection |
EN 50164-7:2008 | Lightning Protection Components (LPC) - Part 7: Requirements for earthing enhancing compounds |
CLC/TS 61643-12:2009 | LOW-VOLTAGE SURGE PROTECTIVE DEVICES - PART 12: SURGE PROTECTIVE DEVICES CONNECTED TO LOW-VOLTAGE POWER DISTRIBUTION SYSTEMS - SELECTION AND APPLICATION PRINCIPLES |
EN 50164-6:2009 | Lightning Protection Components (LPC) - Part 6: Requirements for lightning strike counters |
HD 60364-4-442:2012 | Low-voltage electrical installations - Part 4-442: Protection for safety - Protection of low-voltage installations against temporary overvoltages due to earth faults in the high-voltage system and due to faults in the low voltage system |
CSA IEC 61400-24 : 2012 : R2017 | WIND TURBINES - PART 24: LIGHTNING PROTECTION |
UNE-HD 60364-5-54:2015 | Low-voltage electrical installations - Part 5-54: Selection and erection of electrical equipment - Earthing arrangements and protective conductors |
CSA IEC 61400-24:2012 | WIND TURBINES - PART 24: LIGHTNING PROTECTION |
IEC 60728-11:2016 | Cable networks for television signals, sound signals and interactive services - Part 11: Safety |
NFPA 780 : 2017 | INSTALLATION OF LIGHTNING PROTECTION SYSTEMS |
IEC 61400-24:2010 | Wind turbines - Part 24: Lightning protection |
IEC 60079-10-1:2015 | Explosive atmospheres - Part 10-1: Classification of areas - Explosive gas atmospheres |
IEC TR 61000-5-2:1997 | Electromagnetic compatibility (EMC) - Part 5: Installation and mitigation guidelines - Section 2: Earthing and cabling |
IEC 61643-21:2000+AMD1:2008+AMD2:2012 CSV | Low voltage surge protective devices - Part 21: Surge protective devices connected to telecommunications and signalling networks - Performance requirements and testing methods |
IEC 62561-1:2017 | Lightning protection system components (LPSC) - Part 1: Requirements for connection components |
IEC 60050-426:2008 | International Electrotechnical Vocabulary (IEV) - Part 426: Equipment for explosive atmospheres |
IEC 62561-3:2017 | Lightning protection system components (LPSC) - Part 3: Requirements for isolating spark gaps (ISG) |
IEC 62305-1:2010 | Protection against lightning - Part 1: General principles |
IEC 61643-1:2005 | Low-voltage surge protective devices - Part 1: Surge protective devices connected to low-voltage power distribution systems - Requirements and tests |
IEC 60079-14:2013 | Explosive atmospheres - Part 14: Electrical installations design, selection and erection |
ISO 3864-1:2011 | Graphical symbols Safety colours and safety signs Part 1: Design principles for safety signs and safety markings |
IEC 60050-826:2004 | International Electrotechnical Vocabulary (IEV) - Part 826: Electrical installations |
IEC 62305-4:2010 | Protection against lightning - Part 4: Electrical and electronic systems within structures |
IEC 61557-4:2007 | Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 4: Resistance of earth connection and equipotential bonding |
IEC 62305-2:2010 | Protection against lightning - Part 2: Risk management |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.