FC 4-218-01F : 2015
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
FACILITIES CRITERIA - AIR FORCE CRITERIA FOR PRECISION MEASUREMENT EQUIPMENT LABORATORY DESIGN AND CONSTRUCTION
06-07-2023
29-09-2016
CHAPTER 1 - INTRODUCTION
CHAPTER 2 - FUNCTIONAL REQUIREMENTS
CHAPTER 3 - GENERAL DESIGN CRITERIA
CHAPTER 4 - SPECIFIC DESIGN CRITERIA
APPENDIX B - GLOSSARY
Gives guidelines for evaluating, planning, programming, and designing PMEL Facilities.
DocumentType |
Standard
|
PublisherName |
US Military Specs/Standards/Handbooks
|
Status |
Withdrawn
|
UFC 3-520-01 : 2015 | UNIFIED FACILITIES CRITERIA - INTERIOR ELECTRICAL SYSTEMS |
UFC 4-010-01 : 2018 | UNIFIED FACILITIES CRITERIA - DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS |
UFC 3-501-01 : 2015 | UNIFIED FACILITIES CRITERIA - ELECTRICAL ENGINEERING |
UFC 3-410-02 : Change 1 | UNIFIED FACILITIES CRITERIA - LONWORKS[R] DIRECT DIGITAL CONTROL FOR HVAC AND OTHER LOCAL BUILDING SYSTEMS |
ASHRAE 52.2 : 2017 | METHOD OF TESTING GENERAL VENTILATION AIR-CLEANING DEVICES FOR REMOVAL EFFICIENCY BY PARTICLE SIZE |
CFR 29(PTS1900-1910) : 0 | LABOR - OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR |
ANSI S1.4 : 1983 | SPECIFICATION FOR SOUND LEVEL METERS |
NFPA 101 : 2018 | LIFE SAFETY CODE |
ASHRAE 90.1 : 1999 | ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS |
NFPA 501 : 2017 | MANUFACTURED HOUSING |
UFC 3-400-02 : 2003 | UNIFIED FACILITIES CRITERIA - DESIGN: ENGINEERING WEATHER DATA |
ASHRAE HDBK FUNDAMENTALS : 2013 | ASHRAE HANDBOOK - FUNDAMENTALS |
MIL-STD-188-124 Revision B:1992 | GROUNDING BONDING AND SHIELDING FOR COMMON LONG HAUL TACTICAL COMMUNICATION SYSTEMS INCLUDING GROUND BASED COMMUNICATIONS ELECTRONICS FACILITIES & EQUIPMENTS |
NFPA 55 : 2016 | COMPRESSED GASES AND CRYOGENIC FLUIDS CODE |
UFC 1-200-01 : 20071127 | UNIFIED FACILITIES CRITERIA (UFC) DOD BUILDING CODE(GENERAL BUILDING REQUIREMENTS) |
MIL-HDBK-423 Base Document:1993 | HIGH-ALTITUDE ELECTROMAGNETIC PULSE (HEMP) PROTECTION FOR FIXED AND TRANSPORTABLE GROUND - BASED C4 1 FACILITIES - VOLUME 1 - FIXED FACILITIES |
UFC 3-420-01 : Change 10 | UNIFIED FACILITIES CRITERIA - PLUMBING SYSTEMS |
NFPA 45 : 2015 | FIRE PROTECTION FOR LABORATORIES USING CHEMICALS |
NFPA 70 : 2017 | NATIONAL ELECTRICAL CODE |
UFC 3-410-01 : Change 4 | UNIFIED FACILITIES CRITERIA - HEATING, VENTILATING, AND AIR CONDITIONING SYSTEMS |
ISA 7.0.01 : 1996 | QUALITY STANDARD FOR INSTRUMENT AIR |
MIL-STD-188-125-1 Base Document:1998 | HIGH-ALTITUDE ELECTROMAGNETIC PULSE (HEMP) PROTECTION FOR GROUND-BASED C[4]1 FACILITIES PERFORMING CRITICAL, TIME-URGENT MISSIONS PART 1 FIXED FACILITIES |
UFC 3-401-01 : Change 1 | UNIFIED FACILITIES CRITERIA - MECHANICAL ENGINEERING |
MIL-HDBK-419 Revision A:1987 | GROUNDING, BONDING, AND SHIELDING FOR ELECTRONIC EQUIPMENTS AND FACILITIES - VOLUME 1: BASIC THEORY & VOLUME 2: APPLICATIONS |
UFC 3-530-01 : Change 3 | UNIFIED FACILITIES CRITERIA - INTERIOR AND EXTERIOR LIGHTING SYSTEMS AND CONTROLS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.