• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

EN 9239:2016

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

Aerospace series - Programme Management - Guide for the risk management

Withdrawn date

30-11-2016

Published date

18-05-2016

Sorry this product is not available in your region.

1 Scope
2 Normative references
3 Terms and definitions
4 Framework of Risk Management in the programme
5 Risk Management process
6 Risk Management tools
7 Awareness and Training
8 Documentation
9 Opportunity management concept
Annex A (informative) - List type per category
Annex B (informative) - Example of risk sheet
Annex C (informative) - Example of qualitative and
        quantitative assessments
Annex D (informative) - Example of 3 colour code criticality
        and acceptability matrix: general risk mapping
Annex E (informative) - Example of Risks Portfolio
Annex F (informative) - Risk assessment report
Annex G (informative) - Maturity of programme risk
        management: assessment criteria
Bibliography

This document enables to answer specific needs in the field of Aeronautics although it does not present any sectorial characteristic and may therefore apply to the needs of other areas.However, the specificity of some areas can lead to the use of existing sectorial standards such as EN ISO 17666 Space systems - Risk management (ISO 17666:2003).This document:-proposes the main steps for setting up Risk Management framework within programme Management. This guideline may serve as a basis for writing a Risk Management specification;-describes a process for controlling programme risks within the defined boundaries that are considered as tolerable. This standard process can be used as a methodological guide for writing the programme Risk Management Plan;-recognises the need for knowledge management related to Risk Management, in order to capitalize and to share lessons learnt with other programmes, as well as the maturity assessment of the Risk Management;-identifies useful documents for Risk Management;-proposes an example of a typical checklist of risks related to a programme;in addition:-addresses opportunities. An opportunity is an uncertain event with positive consequences on the programme.

Committee
ASD-STAN
DevelopmentNote
Supersedes PREN 9239. (05/2016)
DocumentType
Standard
PublisherName
Comite Europeen de Normalisation
Status
Withdrawn
Supersedes

Standards Relationship
SN EN 9239 : 2016 Identical
UNE-EN 9239:2016 Identical
I.S. EN 9239:2016 Identical
NF EN 9239 : 2016 Identical
UNI EN 9239 : 2016 Identical
NS EN 9239 : 2016 Identical
DIN EN 9239:2016-09 Identical
NBN EN 9239 : 2016 Identical
BS EN 9239:2016 Identical
NEN EN 9239 : 2016 Identical
PN EN 9239 : 2016 Identical
DS EN 9239 : 2016 Identical

PREN 9278 : DRAFT 2017 AEROSPACE SERIES - GENERAL PRINCIPLES OF OBSOLESCENCE MANAGEMENT OF CHEMICALS, MATERIALS AND PROCESSES

ISO 31000:2009 Risk management Principles and guidelines
FD X50 117 : 2003 FD PROJECT MANAGEMENT - RISK MANAGEMENT - MANAGEMENT OF THE RISKS OF A PROJECT
EN 16601-80:2014 Space project management - Part 80: Risk management
EN 9200:2004 Aerospace series - Programme management - Guidelines for project management specification
EN ISO 17666:2003 Space systems - Risk management (ISO 17666:2003)
FD X50 252 : 2006 FD RISK MANAGEMENT - GUIDELINES FOR RISK ESTIMATION
ISO 17666:2016 Space systems — Risk management
ISO Guide 73:2009 Risk management — Vocabulary

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.