EN 50518-1:2013
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
MONITORING AND ALARM RECEIVING CENTRE - PART 1: LOCATION AND CONSTRUCTION REQUIREMENTS
27-01-2022
12-01-2013
Foreword
Introduction
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Site selection
5 Construction
6 Alarm systems of ARC
7 Electrical power supplies
Annex A (informative) - Recommendation lock code
requirements
Annex B (informative) - Typical ARC layout
Bibliography
Defines the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by one or more intruder and hold-up alarm systems takes place as an integrated part of the total safety and security process.
Committee |
TC 79
|
DevelopmentNote |
To be read in conjunction with EN 50518-2 and EN 50518-3. (11/2013)
|
DocumentType |
Standard
|
PublisherName |
European Committee for Standards - Electrical
|
Status |
Superseded
|
SupersededBy |
Standards | Relationship |
NF EN 50518-1 : 2014 | Identical |
NBN EN 50518-1 : 2014 | Identical |
NEN EN 50518-1 : 2013 | Identical |
I.S. EN 50518-1:2013 | Identical |
PN EN 50518-1 : 2014 | Identical |
SN EN 50518-1:2013 | Identical |
UNI CEI EN 50518-1 : 2014 | Identical |
DIN EN 50518-1 : 2014 | Identical |
VDE 0830-5-6-1 : 2014 | Identical |
UNE-EN 50518-1:2014 | Identical |
BS EN 50518-1:2013 | Identical |
CEI UNI EN 50518-1 : 2015 | Identical |
08/30183528 DC : 0 | BS EN 50518-2 - ALARM SYSTEMS - MONITORING AND ALARM RECEIVING CENTER - PART 2: TECHNICAL REQUIREMENTS |
CEI UNI EN 50518-2 : 2015 | MONITORING AND ALARM RECEIVING CENTRE - PART 2: TECHNICAL REQUIREMENTS |
I.S. EN 50134-7:2017 | ALARM SYSTEMS - SOCIAL ALARM SYSTEMS - PART 7: APPLICATION GUIDELINES |
BS EN 50134-7:2017 | Alarm systems. Social alarm systems Application guidelines |
EN 50134-7:2017 | Alarm systems - Social alarm systems - Part 7: Application guidelines |
EN 50518-2:2013 | MONITORING AND ALARM RECEIVING CENTRE - PART 2: TECHNICAL REQUIREMENTS |
EN 50518-3:2013 | MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION |
PREN 50518-2 : DRAFT 2008 | MONITORING AND ALARM RECEIVING CENTRE - PART 2: REQUIREMENTS FOR TECHNICAL FACILITIES |
PREN 50518-3 : DRAFT 2009 | MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION |
I.S. EN 50518-2:2013 | MONITORING AND ALARM RECEIVING CENTRE - PART 2: TECHNICAL REQUIREMENTS |
UNI CEI EN 50518-3 : 2014 | MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION |
09/30183531 DC : 0 | BS EN 50518-3 - MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION |
UNE-EN 50518-2:2014 | Monitoring and alarm receiving centre - Part 2: Technical requirements |
UNE-EN 50134-7:2017 | Alarm systems - Social alarm systems - Part 7: Application guidelines |
BS EN 50518-2:2013 | Monitoring and alarm receiving centre Technical requirements |
15/30325557 DC : 0 | BS EN 50134-7 - ALARM SYSTEMS - SOCIAL ALARM SYSTEMS - PART 7: APPLICATION GUIDELINES |
PREN 50134-7 : DRAFT 2015 | ALARM SYSTEMS - SOCIAL ALARM SYSTEMS - PART 7: APPLICATION GUIDELINES |
UNE-EN 50518-3:2013 | Monitoring and alarm receiving centre - Part 3: Procedures and requirements for operation |
UNI CEI EN 50518-2 : 2014 | MONITORING AND ALARM RECEIVING CENTRE - PART 2: TECHNICAL REQUIREMENTS |
BS EN 50518-3:2013 | Monitoring and alarm receiving centre Procedures and requirements for operation |
CEI UNI EN 50518-3 : 2015 | MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION |
I.S. EN 50518-3:2013 | MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION |
EN 1906:2012 | Building hardware - Lever handles and knob furniture - Requirements and test methods |
EN 62040-1:2008/A1:2013 | UNINTERRUPTIBLE POWER SYSTEMS (UPS) - PART 1: GENERAL AND SAFETY REQUIREMENTS FOR UPS (IEC 62040-1:2008/A1:2013) |
CLC/TS 50131-7:2010 | Alarm systems - Intrusion and hold-up systems - Part 7: Application guidelines |
EN 50136-1:2012 | Alarm systems - Alarm transmission systems and equipment - Part 1: General requirements for alarm transmission systems |
EN 1627:2011 | Pedestrian doorsets, windows, curtain walling, grilles and shutters - Burglar resistance - Requirements and classification |
EN 1303:2015 | Building hardware - Cylinders for locks - Requirements and test methods |
EN 61000-4-2:2009 | Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity test |
EN 13501-2:2016 | Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services |
IEC 62040-1:2017 EXV | UNINTERRUPTIBLE POWER SYSTEMS (UPS) - PART 1: SAFETY REQUIREMENTS |
EN 50518-3:2013 | MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION |
EN 12209:2016 | Building hardware - Mechanically operated locks and locking plates - Requirements and test methods |
EN 50518-2:2013 | MONITORING AND ALARM RECEIVING CENTRE - PART 2: TECHNICAL REQUIREMENTS |
EN 1063:1999 | Glass in building - Security glazing - Testing and classification of resistance against bullet attack |
IEC 61000-4-2:2008 | Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity test |
EN 50272-2:2001 | Safety requirements for secondary batteries and battery installations - Part 2: Stationary batteries |
CEN/TR 14383-8:2009 | Prevention of crime - Urban planning and building design - Part 8: Protection of buildings and sites against criminal attacks with vehicles |
EN 50131-1:2006/A2:2017 | ALARM SYSTEMS - INTRUSION AND HOLD-UP SYSTEMS - PART 1: SYSTEM REQUIREMENTS |
EN 356:1999 | Glass in building - Security glazing - Testing and classification of resistance against manual attack |
EN 1522:1998 | Windows, doors, shutters and blinds - Bullet resistance - Requirements and classification |
EN 50131-4:2009 | Alarm systems - Intrusion and hold-up systems - Part 4: Warning devices |
EN 14846:2008 | Building hardware - Locks and latches - Electromechanically operated locks and striking plates - Requirements and test methods |
EN 13779:2007 | Ventilation for non-residential buildings - Performance requirements for ventilation and room-conditioning systems |
EN 50132-7:2012 | Alarm systems - CCTV surveillance systems for use in security applications - Part 7: Application guidelines |
EN 179:2008 | Building hardware - Emergency exit devices operated by a lever handle or push pad, for use on escape routes - Requirements and test methods |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.