• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

DEFSTAN 02-304(PT5)/2(2002) : 2002

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

SHAFTING SYSTEMS AND PROPULSORS - PART 5: REQUIREMENTS FOR HANDLING, MAINTENANCE AND REPAIR OF PROPELLERS FOR HM SURFACE SHIPS

Superseded date

09-09-2016

Published date

12-01-2013

Sorry this product is not available in your region.

TITLE PAGE
SCOPE
FOREWORD
Sponsorship
Conditions of Release
Categories of Defence Standard
Related Documents
Health and Safety
Additional Information
CONTENTS
SECTION 1. PERFORMANCE SPECIFICATION
            1.1 Propeller Care
            Figure 1.1 Vertical Stowage of Controllable
                        Pitch Propeller Blades
                        and Lifting Arrangements
            Figure 1.2 Lifting Fixed Pitch Propeller by Wires
            1.2 Inspection Requirements
            1.3 Restoration of Propellers
            1.4 Welding of Propellers
            Figure 1.3 Basic Principles for Local Heating
            Figure 1.4 Temperature Gradient
            Figure 1.5 Butt Weld Edge Preparation
            Figure 1.6 Butt Welds in Thinner Sections
            Figure 1.7 Template for Back Gouging
            Figure 1.8 Cover Plate Weld Preparation - Backed
                        Butt Weld
            Figure 1.9 Excavation for Surface Repairs
            Figure 1.10 Excavation and Depth Gauge
            Figure 1.11 Weld Deposition Sequence
            Figure 1.12 Bead Overlap
            Figure 1.13 Full Penetration Welding Sequence
            Figure 1.14 Run-On and Run-Off Tabs
            Figure 1.15 Crack Excavation Weld Centre
            Figure 1.16 Suggested Tip Cramping Method
            Figure 1.17 Principle of Sequencing Assembly Welds
            Figure 1.18 Staggered Back Step Technique
            Figure 1.19 Tip Restoration - Preparation
                        and Weld Overlay
            1.5 Welding Repair Limitations
            Figure 1.20 Severity Zones - Fixed Pitch
                        Propeller Blade
            Figure 1.21 Severity Zones - Controllable
                        Pitch Propeller Blade
            1.6 Acceptance Standards for Repaired Areas
SECTION 2. NATIONAL/INTERNATIONAL REGULATIONS
SECTION 3. MILITARY STANDARDS/REQUIREMENTS
            3.1 Propeller Care
            3.2 Inspection Requirements
            3.3 Restoration of Propellers
            3.4 Welding of Propellers
            3.5 Welding Repair Limitations
            3.6 Acceptance Standards for Repaired Areas
                (See also Performance Specification)
            3.7 Quality Records
            3.8 Lubrication
SECTION 4. DESIGN REQUIREMENTS GUIDANCE
            4.1 Propeller Care
            4.2 Inspection Requirements
            4.3 Restoration of Propellers
            4.4 Welding of Propellers
SECTION 5. CORPORATE KNOWLEDGE AND EXPERIENCE
            5.1 Air-Emission Cover Plate
            Figure 5.1 Air Emission Channel Cover Plate
            Figure 5.2 Welding Air-Emission Cover Plate
            Figure 5.3 Removing and Refitting Cover Plate Section
            Figure 5.4 Welding Sequence of Replacement Section
ANNEX A. RELATED DOCUMENTS
ANNEX B. ABBREVIATIONS AND DEFINITIONS
ANNEX C. PROCUREMENT CHECK LIST
ANNEX D. PROPELLER HISTORY SHEETS
ALPHABETICAL INDEX

Defines the requirements for the handling, maintenance, and repair of Fixed Pitch Propellers (FPP) and Controllable Pitch Propellers (CPP) fitted to HM Surface Ships.

DevelopmentNote
Supersedes DEFSTAN 02-304(PT5)/1(2000) (01/2003) This standard is obsolescent because it is no longer required for procurement of new equipment but is retained for maintenance purposes in support of existing in-service equipment. (05/2016)
DocumentType
Standard
PublisherName
UK Ministry of Defence Standards
Status
Superseded
SupersededBy
Supersedes

DEFSTAN 02-136/2(2004) : 2004 DESIGN, TESTING AND ACCEPTANCE REQUIREMENTS FOR WATERTIGHT INTEGRITY OF SUBMARINES CATEGORY 1
DEFSTAN 02-863/2(2010) : 2010 REQUIREMENTS FOR THE CLASSIFICATION, DIMENSIONS, TOLERANCES, WELD REPAIR AND GENERAL STANDARDS OF ACCEPTANCE FOR COPPER AND NICKEL ALLOY CASTINGS

DEFSTAN 02-773/1(2000) : 2000 MINIMUM ACCEPTANCE STANDARDS FOR WELDS IN HM SURFACE SHIPS AND SUBMARINES
DEFSTAN 02-729(PT1)/1(2000) : 2000 REQUIREMENTS FOR NON-DESTRUCTIVE EXAMINATION METHODS - PART 1: RADIOGRAPHIC
DEFSTAN 02-746/1(2000) : 2000 APPROVAL AND CONTROL OF HEAT TREATMENT FURNACES CATEGORY 3
DEFSTAN 05-61(PT1)/3(1998) : 1998 QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 1: DEVIATION/PRODUCTION PERMITS AND WAIVERS/CONCESSIONS - QUALITY ASSURANCE OF SUBCONTRACT WORK
DEFSTAN 02-729(PT2)/1(2000) : 2000 REQUIREMENTS FOR NON-DESTRUCTIVE EXAMINATION METHODS - PART 2: MAGNETIC PARTICLE
DEFSTAN 02-729(PT4)/1(2000) : 2000 REQUIREMENTS FOR NON-DESTRUCTIVE EXAMINATION METHODS - PART 4: LIQUID PENETRATION
DEFSTAN 02-304(PT3)/2(2002) : 2002 SHAFTING SYSTEMS AND PROPULSORS - PART 3: MANUFACTURING AND DETAIL DESIGN REQUIREMENTS FOR PROPULSORS
DEFSTAN 02-729(PT5)/1(2000) : 2000 REQUIREMENTS FOR NON-DESTRUCTIVE EXAMINATION METHODS - PART 5: ULTRASONIC
DEFSTAN 01-5/13(2002) : 2002 FUELS, LUBRICANTS AND ASSOCIATED PRODUCTS
DEFSTAN 02-747(PT2)/1(2000) : 2000 REQUIREMENTS FOR NICKEL ALUMINIUM BRONZE CASTINGS AND INGOTS - PART 2: NICKEL ALUMINIUM BRONZE NAVAL ALLOY INGOTS AND SAND CASTINGS WITH WELDING PERMITTED TO THE WETTED SURFACE
DEFSTAN 81-41(PT1)/5(2003) : 2003 PACKAGING OF DEFENCE MATERIAL - PART 1: INTRODUCTION TO DEFENCE PACKAGING REQUIREMENTS
DEFSTAN 02-729(PT3)/1(2000) : 2000 REQUIREMENTS FOR NON-DESTRUCTIVE EXAMINATION METHODS - PART 3: EDDY CURRENT

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.