• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

DEFSTAN 02-28/1(2005) : 2005

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

CONFIGURATION MANAGEMENT NUCLEAR SUBMARINES IN SERVICE SUPPORT

Available format(s)

Hardcopy , PDF

Superseded date

24-07-2014

Language(s)

English

Published date

01-01-2005

£12.00
Excluding VAT

1 Scope
2 Warning
3 Normative References
4 Definitions
   4.1 Datum Pack
   4.2 Fingerprint
   4.3 E List
   4.4 Upkeep Period
5 Abbreviations
CONFIGURATION MANAGEMENT AND CONTROL
6 Foreword
7 Purpose
8 Configuration Definition
9 Configuration Accounting
10 Hull, Non Nuclear Systems and Equipment's
11 Nuclear Steam Raising Plant (NSRP)
12 Tactical Weapons Systems
13 Configuration Control
14 Temporary Changes
15 Temporary Changes: Tactical Weapons Systems
16 Monitoring and Auditing
17 TWS Audits
18 Constraints
FEEDBACK OF INFORMATION AND RECORDING OF CHANGE
19 Purpose
20 Scope
21 Oasis Feedback
22 Oasis Feedback on Vanguard Class
23 Dockyard Feedback
24 Tactical Weapons Feedback
25 Feedback Validation Printout
26 Information Held on Personal Computer
27 Hard Copy
28 Damp Control and Validation
29 Upkeep Periods in Commission
30 Test Forms
31 Overview Flow Chart
32 Change Notices
33 Change Notices: Validation Contractor
34 Alterations and Additions (A & A'S)
35 Alterations and Additions: Validation Contractor
36 Equipment Modifications: Control
37 Equipment Modifications: TWS Control
38 Equipment Modifications: Validation Contractor
39 Concessions and Production Permits: General
40 Concessions and Production Permits: Accounting
41 Concessions and Production Permits: Worked Out Concessions
42 Concessions And Production Permits: Updating of the MRC
   (SM) Data
43 Concessions and Production Permits: Upkeep by Exchange
44 Defect Rectification and Design Shortcomings: S2022 (S)
45 Defect Rectification and Design Shortcomings: T3 - Request
   for Base/Contractor Assistance
46 Defect Rectification and Design Shortcomings: Erc - Event
   Record Card
47 Defect Rectification and Design Shortcomings: Planned
   Maintenance
48 Defect Rectification and Design Shortcomings: D448
49 Defect Rectification and Design Shortcomings: STOROB
   Procedures
50 Collection Of Availability, Reliability And
   Maintainability (ARM) Data
LIST OF PUBLICATIONS AND INSTRUCTIONS COVERING
CONFIGURATION CONTROL PROCEDURES
51 SCOPE
52 Sea System Publications
53 Naval Defence Standards (NDS)
54 Other Related Documents and Publications
55 Introduction
56 Master Record Database (MRDB)
57 Development of the MRC (SM)
58 Oasis
59 Parts Identification Management System (PIMS)
60 Project Upkeep
61 Introduction
62 Drawings
63 Publications
   63.1 Technical Information:
   63.2 Store and Equipment Documentation:
   63.3 System and Equipment Maintenance Policy:
   63.5 Consultative Documentation
64 Print-Outs
   64.1 Drawing Information
   64.2 Control of Change Documentation
   64.3 Consultative Documentation
65 Records
   65.1 Change Notices
   65.3 Form D448
   65.4 Registers
FORMS REQUIRED FOR CONFIGURATION CONTROL
66 Introduction
67 Form 715/715 (ME)
68 SUBIPT Form F3 (Revised 1985 Issue 5); Advance Notice
   Of Support Documentation Change
69 Form F4; A & A Guidance Information Statement for
   Ship's Staff and Dockyards
70 FORM F5A WEIGHT AND SPACE CONTROL
71 Form Sm103/D7; SSBN and SSN - Change To First Level Drawings
Annex A
   A.1 The Annex contains the Flow Charts listed below
   A.2 The following Flow Charts are for information only:

Applies to Submarine structure, systems and equipments for which SubIPT is the Design Authority. It does not apply to Strategic Weapons System.

DevelopmentNote
Supersedes SSP 46 and DPT 1010. (11/2005) This standard is obsolescent because it is no longer required for the procurement of new equipment but is retained for maintenance purposes in support of existing in-service equipment. (07/2009)
DocumentType
Miscellaneous Product
Pages
42
PublisherName
UK Ministry of Defence Standards
Status
Superseded
SupersededBy

DEFSTAN 02-250(PT0)/1(2013) : 2013 MARITIME SUPPORT MANAGEMENT - PART 0: GENERAL INFORMATION FOR TYPE A AND TYPE B SUPPORT
DEFSTAN 02-250(PT0)/2(2015) : 2015 MARITIME SUPPORT MANAGEMENT - PART 0: GENERAL INFORMATION FOR TYPE A AND TYPE B SUPPORT

DEFSTAN 05-61/1(1983) : 1983 QUALITY ASSURANCE PROCEDURAL REQUIREMENTS
DEFSTAN 02-54/1(2000) : 2000 SUPPLY OF INFORMATION TO DETERMINE, THE SHIP-FIT OF EQUIPMENT AND THE IDENTIFICATION OF PARTS AND SPARES
DEFSTAN 02-374/1(2000) : 2000 RUBBER FLEXIBLE PIPES AND BELLOWS FOR USE IN SUBMARINES CATEGORY 2
DEFSTAN 02-41/2(2000) : 2000 AMD 1 2004 REQUIREMENTS FOR CONFIGURATION MANAGEMENT OF SURFACE WARSHIPS
DEFSTAN 05-57/5(2005) : 2005 CONFIGURATION MANAGEMENT OF DEFENCE MATERIEL

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.