BS EN 62337:2012

Current

Current

The latest, up-to-date edition.

Commissioning of electrical, instrumentation and control systems in the process industry. Specific phases and milestones

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

30-06-2013

£232.00
Excluding VAT

INTRODUCTION
1 Scope
2 Normative references
3 Terms and definition
4 General preparations before acceptance of plant
5 Completion of erection
6 Precommissioning (mechanical completion)
7 Commissioning
8 Performance test and acceptance of plant
Annex A (informative) - List of documents to be used for
        the precommissioning and commissioning phase
Annex B (informative) - Description of precommissioning
        activities
Annex C (informative) - Mechanical completion certificate
Annex D (informative) - Description of commissioning
        activities
Annex E (informative) - Acceptance of plant certificate
Annex F (informative) - Project-specific items
Bibliography
Annex ZA (normative) - Normative references to international
         publications with their corresponding European
         publications

Specifies specific phases and milestones in the commissioning of electrical, instrumentation and control systems in the process industry.

Committee
GEL/65/3
DevelopmentNote
Supersedes 05/30140361 DC. (05/2007)
DocumentType
Standard
Pages
40
PublisherName
British Standards Institution
Status
Current
Supersedes

This International Standard defines specific phases and milestones (see Figure 1) in the commissioning of electrical, instrumentation and control systems in the process industry. By way of example, it describes activities following the “c ompletion-of-erection” milestone o f the project and prior to the “a cceptance-of-the-plant” phase by the owner. Such activities need to be adapted for each t ype of process/plant concerned.

NOTE This standard assumes that the “acceptance -of-the-plant” milestone will occur after the performance test. If there is a reduced scope, this document should be adapted accordingly.

NOTE Construction and precommissioning activities could be overlapping.

For application in the pharmaceutical or other highly specialized industries, additional guidelines (for example, Good Automated Manufacturing Practice (GAMP)), definitions and stipulations should apply in accordance with existing standards, for example, for GMP Compliance 21 CFR (FDA) and the Standard Operating Procedure of the European Medicines Agency (SOP/INSP/2003).

Standards Relationship
DIN EN 62337 : 2013 Identical
IEC 62337:2012 Identical
I.S. EN 62337:2012 Identical
NBN EN 62337 : 2012 Identical
NF EN 62337 : OCT 2014 Identical
EN 62337:2012 Identical
IEC 62337:2012/COR1:2012 Identical

IEC 61355-1:2008 Classification and designation of documents for plants, systems and equipment - Part 1: Rules and classification tables
IEC 62708:2015 Documents kinds for electrical and instrumentation projects in the process industry
EN ISO 10628-2:2012 Diagrams for the chemical and petrochemical industry - Part 2: Graphical symbols (ISO 10628-2:2012)
EN 62424:2016 Representation of process control engineering - Requests in P&I diagrams and data exchange between P&ID tools and PCE-CAE tools
EN 62079:2001 Preparation of instructions - Structuring, content and presentation
IEC 62079:2001 Preparation of instructions - Structuring, content and presentation
IEC 62424:2016 Representation of process control engineering - Requests in P&I diagrams and data exchange between P&ID tools and PCE-CAE tools
ISA 7.0.01 : 1996 QUALITY STANDARD FOR INSTRUMENT AIR

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.