BS 6079-1:2000
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Project management Guide to project management
Hardcopy , PDF
28-05-2002
English
15-01-2000
Committees responsible
1 General
Introduction
1.1 Scope
1.2 References
1.3 Definitions
2 The corporate aspects of project management
2.1 General
2.2 Nature of projects
2.3 The work to be done
2.4 The project life cycle
2.5 The benefits of project management
3 Project and company organizational structures
3.1 General
3.2 The hierarchical functional organization
3.3 The matrix organization
3.4 The project organization
3.5 Criteria for reorganization
4 The project management process
4.1 General
4.2 The project management process: introduction
4.3 The project management process: planning
4.4 The project management process: control
4.5 The project plan
4.6 Processes supporting the project management
process
4.7 Project personnel development
5 Project lifecycle
5.1 General
5.2 Types of project
5.3 Project phasing
5.4 Project phase sequence
5.5 Description of phase content
Annex A (informative) Project management methodology:
cost/schedule control system criteria
(C/SCSC)
Figure 1 - Arrangement of project phases, stages and
milestones
Figure 2 - Authority relationships in organization structures
Figure 3 - Project management process flow
Figure 4 - Model work breakdown structure
Figure 5 - Model bar chart
Figure 6 - Typical cumulative cost pattern
Figure 7 - Format of cash flow forecast
Figure 8 - Earned value chart
Figure 9 - Project management life cycle
Figure 10 - Periodic estimate of project cost and finishing
date
Table 1 - Model project plan
Table 2 - Example of discounted cash flow
Table 3 - List of typical project phases
List of references
Gives guidance on execution and planning of projects and the application of project management techniques. Relevant to projects in the public sector and many industries, abroad and at home. Procedures and principles are outlined in all sizes of organization, although they may not cover all aspects of every conceivable type and size of project. Note, that by definition, projects will have differing emphases and priorities.
Committee |
MS/2
|
DevelopmentNote |
Supersedes and renumbers BS 6079(1996) (12/1999) Also available as a part of BS KIT 3, BS KIT 13 and BS KIT 19. Supersedes 94/408410 DC, 94/408411 DC, 94/408412 DC, and 97/403015 DC (03/2002)
|
DocumentType |
Standard
|
Pages |
58
|
PublisherName |
British Standards Institution
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
BS 7373-2:2001 | Product specifications Guide to identifying criteria for a product specification and to declaring product conformity |
BS HB 10181(2001) : 2001 | TRANSITION TO ISO 9001:2000 - GUIDANCE ON ISO 9001:2000, QUALITY MANAGEMENT SYSTEMS - REQUIREMENTS |
BS 6079-2:2000 | Project management Vocabulary |
BS 7000-5:2001 | Design management systems Design management systems. Guide to managing obsolescence |
PREN 9200 : 200P1 | AEROSPACE SERIES - PROGRAMME MANAGEMENT - GUIDELINES FOR PROJECT MANAGEMENT SPECIFICATION |
BS EN 9200:2004 | Programme management. Guidelines for project management specification |
EN 9200:2004 | Aerospace series - Programme management - Guidelines for project management specification |
BS 3811:1993 | Glossary of terms used in terotechnology |
BS 4335:1987 | Glossary of terms used in project network techniques |
BS 7000-10:1995 | Design management systems Glossary of terms used in design management |
BS EN ISO 8402:1995 | Quality management and quality assurance. Vocabulary |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.