API 65-2:2010
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
ISOLATING POTENTIAL FLOW ZONES DURING WELL CONSTRUCTION
English
01-12-2010
20-02-2021
1 Scope
2 Normative References
3 Definitions, and Abbreviated Terms
4 Barriers
5 Cementing Practices and Factors Affecting Cementing
Success
6 Casing Shoe Testing
7 Post-cement Job Analysis and Evaluation
Annex A (informative) - Background and Technology
Annex B (informative) - Well Planning and Drilling Plan
Considerations
Annex C (informative) - Drilling the Well
Annex D (normative) - Process Summary: Isolating Potential
Flow Zones During Well Construction
Bibliography
Provides practices for isolating potential flow zones, an integral element in maintaining well integrity. Focuses on the prevention of flow through or past barriers that are installed during well construction.
| DocumentType |
Standard
|
| Pages |
96
|
| ProductNote |
Reconfirmed 2010
|
| PublisherName |
American Petroleum Institute
|
| Status |
Superseded
|
| SupersededBy |