• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert
Celebrate World Standards Day. Save 10% with code WSD2026 until 31 Oct. Save now

API 65-2:2010

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

ISOLATING POTENTIAL FLOW ZONES DURING WELL CONSTRUCTION

Available format(s)

PDF

Language(s)

English

Published date

01-12-2010

Superseded date

20-02-2021

£123.83
Excluding VAT
Summarise this standard

1 Scope
2 Normative References
3 Definitions, and Abbreviated Terms
4 Barriers
5 Cementing Practices and Factors Affecting Cementing
  Success
6 Casing Shoe Testing
7 Post-cement Job Analysis and Evaluation
Annex A (informative) - Background and Technology
Annex B (informative) - Well Planning and Drilling Plan
        Considerations
Annex C (informative) - Drilling the Well
Annex D (normative) - Process Summary: Isolating Potential
        Flow Zones During Well Construction
Bibliography

Provides practices for isolating potential flow zones, an integral element in maintaining well integrity. Focuses on the prevention of flow through or past barriers that are installed during well construction.

DocumentType
Standard
Pages
96
ProductNote
Reconfirmed 2010
PublisherName
American Petroleum Institute
Status
Superseded
SupersededBy

⚠

A newer version of this standard is available.

View Current Edition
£123.83
Excluding VAT