• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

API 2L : 1996 : R2006

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

RECOMMENDED PRACTICE FOR PLANNING, DESIGNING, AND CONSTRUCTING HELIPORTS FOR FIXED OFFSHORE PLATFORMS

Available format(s)

Hardcopy , PDF

Superseded date

19-02-2021

Superseded by

API 2L : 1996 : R2012

Language(s)

English

Published date

01-01-2012

£74.48
Excluding VAT

1 SCOPE
2 REFERENCES
  2.1 Standards
  2.2 Other References
3 DEFINITIONS
4 PLANNING
  4.1 General
  4.2 Helicopter Selection
  4.3 Operational Considerations
       4.3.1 Function
       4.3.2 Location
              4.3.2.1 Approach Departure Zone
              4.3.2.2 Obstruction Free Zone
       4.3.3 Size
       4.3.4 Orientation
       4.3.5 Access and Egress
       4.3.6 Fire Protection
       4.3.7 Air Turbulence
       4.3.8 Heliport Equipment
       4.3.9 Material Handling
       4.3.10 Drainage
       4.3.11 Maintenance
       4.3.12 Environmental Consideration
5 DESIGN PROCEDURES FOR OFFSHORE HELIPORTS
  5.1 General
  5.2 Design Load
       5.2.1 Dead Weight
       5.2.2 Live Load
       5.2.3 Wind Load
       5.2.4 Helicopter Landing Load Considerations
              5.2.4.1 General
              5.2.4.2 Contact Area
              5.2.4.3 Load Distribution
              5.2.4.4 Design Landing Load
  5.3 Design Load Conditions
  5.4 Installation
  5.5 Material
  5.6 Flight Deck Surface
  5.7 Access and Egress Route
  5.8 Safety Net and Self
  5.9 Tiedown Points
  5.10 Lighting
  5.11 Heliport Markings
       5.11.1 General
       5.11.2 Limitation Markings
       5.11.3 Obstruction Marking
       5.11.4 Closed Heliport
  5.12 Drawings, Specifications and Construction
6 SAFETY CONSIDERATIONS
  6.1 Fueling Stations
  6.2 Wind Direction Indicator
  6.3 Fire Protection Equipment
7 APPLICABLE REGULATIONS

Acts as a guide for planning, designing, and constructing heliports for fixed offshore platforms. It includes operational consideration guidelines, design load criteria, heliport size, marking recommendations, and other heliport design recommendations.

DocumentType
Standard
Pages
24
ProductNote
Reconfirmed 2006
PublisherName
American Petroleum Institute
Status
Superseded
SupersededBy
Supersedes

CFR 33(PTS125-199) : JUL 2017 NAVIGATION AND NAVIGABLE WATERS
API 2A : 1986 RECOMMENDED PRACTICE FOR PLANNING, DESIGNING AND CONSTRUCTING FIXED OFFSHORE PLATFORMS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.