AISC 204 : 2008
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
AISC CERTIFICATION PROGRAM FOR BRIDGE AND HIGHWAY METAL COMPONENT MANUFACTURERS
25-04-2013
04-01-2025
1. Purpose
2. Scope
3. References
4. Definitions
5. Management Responsibility
6. Contract and Project Specification
Review and Communication
7. Design and Detailing
8. Document and Data Control
9. Control of Quality Records
10. Purchasing
11. Material Identification and Traceability
12. Manufacturing Process Control
13. Inspection and Testing
14. Inspection, Measuring and Test Equipment
15. Control of Nonconformances
16. Corrective Action
17. Handling, Storage and Delivery of
Product and Materials
18. Training
19. Internal Audit
Supplemental Requirements (reference element 2. Scope)
Defines certification requirements for facilities that manufacture and supply specific components composed primarily of metal to bridge and highway construction projects.
| DocumentType |
Standard
|
| PublisherName |
American Institute of Steel Construction
|
| Status |
Withdrawn
|