• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

AISC 204 : 2008

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

AISC CERTIFICATION PROGRAM FOR BRIDGE AND HIGHWAY METAL COMPONENT MANUFACTURERS

Published date

25-04-2013

Withdrawn date

04-01-2025

Sorry this product is not available in your region.

1. Purpose
2. Scope
3. References
4. Definitions
5. Management Responsibility
6. Contract and Project Specification
    Review and Communication
7. Design and Detailing
8. Document and Data Control
9. Control of Quality Records
10. Purchasing
11. Material Identification and Traceability
12. Manufacturing Process Control
13. Inspection and Testing
14. Inspection, Measuring and Test Equipment
15. Control of Nonconformances
16. Corrective Action
17. Handling, Storage and Delivery of
    Product and Materials
18. Training
19. Internal Audit
Supplemental Requirements (reference element 2. Scope)

Defines certification requirements for facilities that manufacture and supply specific components composed primarily of metal to bridge and highway construction projects.

DocumentType
Standard
PublisherName
American Institute of Steel Construction
Status
Withdrawn

Sorry this product is not available in your region.