• Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

10309-7

Current

Current

The latest, up-to-date edition.

Safe Work Method Statement - Concrete Slab (Waffle Pod Raft System) SWMS 10309-7

Available format(s)

Word

Language(s)

English

Published date

01-09-2020

This Safe Work Method Statement (SWMS) covers hazards and controls, associated with handling, delivery and placement of wet concrete being placed into a waffle pod raft system. This SWMS covers High-Risk Construction Work (HRCW) controls related to:
Mobile plant movement
Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
Work in an area that may have a contaminated or flammable atmosphere
Additional controls are included for Electrical Equipment, Slips, Trips & Falls, Hazardous Substances, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

DocumentType
Standard
Pages
14
ProductNote
Concrete Slab (Waffle Pod Raft System) SWMS - written by SafetyCulture Pty Ltd

It is a Word DOC, not a PDF so you can add logos, change colours and add or delete information as needed. It contains commonly encountered safety aspects and is not a blank template.

You should add your company details, ABN and include your site specific details or risks to make it specific to the job at hand. You can then print it for incorporation into your overall OHS system, as well for inductions, toolbox talks or tender applications.

Note you will require MS Word to use this template.
PublisherName
SafetyCulture Pty Ltd
Status
Current
SupersededBy

Job Steps Covered in Concrete Slab (Waffle Pod Raft System) SWMS:
(includes potential hazards and control measures)
Provide Training on the Health Effects Associated with Respirable Crystalline Silica Dust
Working Outdoors
Arrival On-site & Assess On-site Conditions
Work Area Set-up
Environment
Housekeeping
Manual Tasks
Delivering Materials, Subgrade Preparation, Concrete Delivery
Working with Powered & Non-powered Tools
Setting-out/Profiling Building Lines
Subgrade Preparation
Waffle Pod Placement
Setting Steel & Formwork
Placing Concrete & Finish
Fuelling Small Engines On-site
On Completion
Emergency Response

Version 7

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.