Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Description of the principles of operation for smoke and heat
control systems
4.1 Smoke and heat control systems which rely on the principle
of the creation of a smoke layer
4.1.1 Smoke layers exhausted by natural vents
4.1.2 Layers of smoke exhausted by powered vents
4.2 Smoke free areas by differential pressure systems
4.3 Air renewal of the room with fresh air by dilution of smoke
5 Description of the combination of products for construction
of SHEVS
5.1 General
5.2 General requirements
5.3 Requirements for smoke layer systems with natural
ventilators
5.4 Requirements for smoke layer systems with powered
ventilators
5.4.1 Requirements for power supplies for powered smoke
and heat exhaust ventilation systems
5.4.2 Requirements for powered smoke and heat exhaust
systems
5.5 Requirements for smoke free area systems by differential
pressure
5.6 Requirements for smoke control by air renewal of the
room with fresh air by dilution of smoke
6 Air Inlet
6.1 General requirements
6.2 Fire behaviour requirements
6.2.1 Performance parameters under fire conditions
6.2.2 Reaction to fire
6.2.3 Resistance to fire
6.3 Geometric areas for natural air inlets
7 Tubes, cables and accessories
7.1 General requirements
7.2 Fire behaviour requirements
7.2.1 Performance parameters under fire conditions
7.2.2 Reaction to fire of cables and tubes
7.2.3 Resistance to fire of cables and tubes
7.3.2 Requirements for electrical supplies
7.3.3 Isolators and switches on power lines
7.3.4 Enclosures for electrical components
7.3.5 Extra low voltage operated components
7.3.6 Sizing of electrical cables and related equipment
7.4 Requirements for pneumatic supplies
7.4.1 Requirements for pneumatic supplies using
compressors
7.4.2 Requirements for pneumatic lines
7.4.3 Mechanical cables
8 Requirements for installation
8.1 General requirements for installation
8.2 Requirements for installation of a SHEVS
8.3 Requirements for installation of power supplies
8.4 Requirements for installation of controls
8.5 Access to components
8.6 Requirements for installation of powered SHEVS
8.7 Requirements for installation of air inlets
8.8 General requirements for installation of smoke barriers
8.8.1 Fastenings and adjacent surfaces
8.8.2 Maximum gaps
8.8.3 Response time
8.9 Functional test
9 Handing-over and commissioning
9.1 Requirements for commissioning of the system
9.2 Requirements for acceptance report of the system
9.3 Technical information report
9.4 Specific requirements for powered smoke ventilation
systems
10 Routine checking
11 Maintenance
11.1 General
11.2 Scope of maintenance
11.3 Functional test
11.4 Maintenance operations
11.5 Availability
Annex A (normative) Pneumatic system leakage testing
Annex B (normative) Air flow measurements
B.1 Air flow requirements in powered ventilation systems
B.2 Measurement of air flow for ducted systems
B.2.1 Selection of measurement method
B.2.2 Selection of cross section
B.2.3 Measurement of air flow
Annex C (informative) Drawings of example systems
Annex D (informative) Detailed engineering plan
D.1 Detailed engineering plan for smoke flow and pressure
control within the premises
D.1.1 General
D.1.2 Requirements for SHEVS intended to form a
smoke layer
D.1.3 Requirements for natural smoke and heat exhaust
ventilation systems
D.1.4 Requirements for powered smoke exhaust systems
D.1.5 Functioning and requirements for differential
pressure systems
D.1.6 Requirements for differential pressure systems
D.2 Requirements for assembly, commissioning, inspection,
testing and maintenance of natural smoke exhaust systems
Annex E (informative) Requirements specific to powered smoke
exhaust systems (powered fans, dampers, ducts etc) -
Mounting and testing
E.1 Requirements for mounting and commissioning
E.1.1 General
E.1.2 Mounting of powered smoke and heat exhaust
systems
E.1.3 Mounting of the operating devices
E.1.4 Mounting of control devices and circuits
E.1.5 Mounting of components of powered smoke
exhaust systems
E.2 Requirements for acceptance and testing
E.2.1 General
E.2.2 Acceptance and testing of powered smoke and
heat exhaust system
E.3 Requirements for routine checking
E.4 Requirements for maintenance
E.4.1 General
E.4.2 Scope of maintenance
E.4.3 Functional test
E.4.4 Maintenance operations
E.4.5 Availability
Bibliography
Describes the ability of the system to meet the required performances of the SHEVS as specified by the design of the system.
DevelopmentNote |
Supersedes I.S. CEN/TR 12101-4. (03/2009)
|
DocumentType |
Standard
|
Pages |
53
|
PublisherName |
National Standards Authority of Ireland
|
Status |
Current
|
Supersedes |
Standards | Relationship |
CEN/TR 12101-4:2009 | Identical |
ISO 2408:2017 | Steel wire ropes — Requirements |
ISO 5168:2005 | Measurement of fluid flow — Procedures for the evaluation of uncertainties |
EN 12101-2:2017 | Smoke and heat control systems - Part 2: Natural smoke and heat exhaust ventilators |
EN 12101-3:2015 | Smoke and heat control systems - Part 3: Specification for powered smoke and heat control ventilators (Fans) |
EN 13501-4:2016 | Fire classification of construction products and building elements - Part 4: Classification using data from fire resistance tests on components of smoke control systems |
EN 13501-2:2016 | Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services |
ISO 5801:2017 | Fans — Performance testing using standardized airways |
EN 1366-9:2008 | Fire resistance tests for service installations - Part 9: Single compartment smoke extraction ducts |
EN ISO 5167-1:2003 | Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 1: General principles and requirements (ISO 5167-1:2003) |
IEC 60529:1989+AMD1:1999+AMD2:2013 CSV | Degrees of protection provided by enclosures (IP Code) |
ISO 5167-1:2003 | Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full Part 1: General principles and requirements |
EN 1366-8:2004 | Fire resistance tests for service installations - Part 8: Smoke extraction ducts |
EN 13501-3:2005+A1:2009 | Fire classification of construction products and building elements - Part 3: Classification using data from fire resistance tests on products and elements used in building service installations: fire resisting ducts and fire dampers |
ISO 7194:2008 | Measurement of fluid flow in closed conduits — Velocity-area methods of flow measurement in swirling or asymmetric flow conditions in circular ducts by means of current-meters or Pitot static tubes |
ISO 5221:1984 | Air distribution and air diffusion Rules to methods of measuring air flow rate in an air handling duct |
EN 60529:1991/AC:2016-12 | DEGREES OF PROTECTION PROVIDED BY ENCLOSURES (IP CODE) (IEC 60529 EDITION 2.2 CORRIGENDUM 2:2015) |
ISO 3966:2008 | Measurement of fluid flow in closed conduits Velocity area method using Pitot static tubes |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.