
RSSB GM/RT2452 : ISSUE 1
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

ACCEPTANCE OF TRAMS AND LIGHT RAIL OR METRO VEHICLES FOR SHARED RUNNING ON RAILTRACK CONTROLLED INFRASTRUCTURE
18-09-2013
03-12-2016
Part A
Issue Record
Responsibilities
Compliance
Health and Safety Responsibilities
Supply
Part B
1 Purpose
2 Scope
3 Definitions
4 Introduction
5 Mandatory Requirements
Appendix A - Sections of Railway Group Standards for which Compliance is Not Mandatory in the Case of LVs
References
Specifies the particular requirements which apply to acceptance of LVs under the process defined in GO/RT3270 “Route Acceptance of Rail Vehicles”.
DocumentType |
Standard
|
PublisherName |
Rail Safety and Standards Board Limited
|
Status |
Withdrawn
|
RSSB GE/GN8502 : ISSUE 1 | OPERATION OF TRAMS AND LIGHT RAIL OR METRO VEHICLES OVER RAILTRACK CONTROLLED INFRASTRUCTURE |
RSSB GM/RT2100 : ISSUE 5 | REQUIREMENTS FOR RAIL VEHICLE STRUCTURES |
RSSB GM/RT2162 : ISSUE 3 AMD 1 2011 | TRAINCREW ACCESS TO AND EGRESS FROM RAILWAY VEHICLES |
RSSB GE/GN8502 : ISSUE 1 | OPERATION OF TRAMS AND LIGHT RAIL OR METRO VEHICLES OVER RAILTRACK CONTROLLED INFRASTRUCTURE |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.
Logging out.