RSSB GI/RT7006 : ISSUE 1
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
PREVENTION AND MITIGATION OF OVERRUNS - RISK ASSESSMENT
17-09-2013
01-12-2014
Part A
Issue Record
Technical Content
Responsibilities
Compliance
Health and Safety Responsibilities
Supply
Part B
1 Purpose
2 Scope
3 Definitions
4 Assessment of Overrun Risk during Track Layout and Signalling Design
5 Operational Use of Infrastructure
6 Review of Overrun Risk at Existing Layouts
7 General Requirements for Overrun Risk Assessments and Reviews
References
Specifies the requirements for risk assessment of the design and operational use of track and signalling, so as to control the risks associated with trains exceeding the end of their movement authority.
| DocumentType |
Standard
|
| PublisherName |
Rail Safety and Standards Board Limited
|
| Status |
Superseded
|
| RSSB GC/RT5033 : ISSUE 2 | TERMINAL TRACKS – REQUIREMENTS FOR BUFFER STOPS, ARRESTING DEVICES AND END IMPACT WALLS |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.