RSSB GE/RT8071 : ISSUE 2
Current
The latest, up-to-date edition.
PROCEED-ON-SIGHT AUTHORITIES
17-09-2013
Part 1 - Purpose and Introduction
Part 2 - Requirements for Control Facilities for use during Lineside Signalling Failures
Part 3 - Application of this document
Definitions
References
Specifies the requirements for the degraded mode signalling facility, known as a Proceed-on-Sight Authority (PoSA).
| DocumentType |
Standard
|
| PublisherName |
Rail Safety and Standards Board Limited
|
| Status |
Current
|
| RSSB GK/RT0060 : ISSUE 4 AMD 1 2003 | INTERLOCKING PRINCIPLES |
| RSSB GK/GN0655 : ISSUE 1 AMD 1 2014 | GUIDANCE ON BLOCK SYSTEM INTERFACE REQUIREMENTS |
| RSSB GE/GN8571 : ISSUE 2 | GUIDANCE ON PROCEED-ON-SIGHT AUTHORITIES |
| RSSB GE/GN8571 : ISSUE 2 | GUIDANCE ON PROCEED-ON-SIGHT AUTHORITIES |
| RSSB GK/GN0802 : ISSUE 1 | GLOSSARY OF SIGNALLING TERMS |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.