RSSB GE/GN8623 : ISSUE 1
Current
The latest, up-to-date edition.
GUIDANCE ON THE CHANGE PROCESS FOR PROJECTS AFFECTING COMPATIBILITY BETWEEN ELECTRIC TRAINS AND ELECTRIFICATION SYSTEMS
17-09-2013
Part 1 - Introduction
Part 2 - Guidance on the change process for projects affecting compatibility between electric trains and electrification systems
Appendix A - Text of the standard GE/RT8023
Appendix B - Extract of miscellaneous instructions for notch 3 working
Appendix C - A sample route capability chart
References
Provides guidance for the change process associated with projects that affect operation between electric trains and an electrification system.
| DocumentType |
Standard
|
| PublisherName |
Rail Safety and Standards Board Limited
|
| Status |
Current
|
| EN 50367 : 2012 AMD 1 2016 | RAILWAY APPLICATIONS - CURRENT COLLECTION SYSTEMS - TECHNICAL CRITERIA FOR THE INTERACTION BETWEEN PANTOGRAPH AND OVERHEAD LINE (TO ACHIEVE FREE ACCESS) |
| RSSB GE/RT8016 : ISSUE 1 | VERIFICATION OF ELECTRIFICATION SYSTEMS AND INTERACTIONS WITH OTHER SYSTEMS |
| RSSB GE/RT8023 : ISSUE 1 | COMPATIBILITY BETWEEN ELECTRIC TRAINS AND ELECTRIFICATION SYSTEMS |
| RSSB GE/RT8015 : ISSUE 1 AMD 1 2013 | ELECTROMAGNETIC COMPATIBILITY BETWEEN RAILWAY INFRASTRUCTURE AND TRAINS |
| EN 50119 : 2009 AMD 1 2013 | RAILWAY APPLICATIONS - FIXED INSTALLATIONS - ELECTRIC TRACTION OVERHEAD CONTACT LINES |
| EN 50163 : 2004 COR 2013 | RAILWAY APPLICATIONS - SUPPLY VOLTAGES OF TRACTION SYSTEMS |
| EN 50388 : 2012 COR 2013 | RAILWAY APPLICATIONS - POWER SUPPLY AND ROLLING STOCK - TECHNICAL CRITERIA FOR THE COORDINATION BETWEEN POWER SUPPLY (SUBSTATION) AND ROLLING STOCK TO ACHIEVE INTEROPERABILITY |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.