Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

PREN 1434-1 : DRAFT 2014

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

HEAT METERS - PART 1: GENERAL REQUIREMENTS

Superseded date

01-11-2015

Superseded by

EN 1434-1:2015

Published date

18-02-2014

Sorry this product is not available in your region.

Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Types of instruments
5 Rated operating conditions
6 Technical characteristics
7 Specified working range
8 Heat transmission formula
9 Metrological characteristics (Maximum
   Permissible Error, MPE)
10 Environmental classification
11 Heat meter specification
12 Information to be delivered with the meter
   or sub-assemblies
Annex A (normative) - Heat coefficient equations
Annex B (normative) - Flow conditioner package
Annex C (informative) - Fast response meters
Annex ZA (informative) - Relationship between this
         European Standard and the Essential
         Requirements of EU Directive 2004/22/EC, MID
Bibliography

Describes the general requirements and applies to heat meters.

Committee
TC 176
DocumentType
Draft
PublisherName
Comite Europeen de Normalisation
Status
Superseded
SupersededBy

Standards Relationship
14/30291765 DC : 0 Identical
05/30127263 DC : DRAFT JAN 2005 Identical

14/30291768 DC : 0 BS EN 1434-4 - HEAT METERS - PART 4: PATTERN APPROVAL TESTS
14/30291756 DC : 0 BS EN 1434-2 - HEAT METERS - PART 2: CONSTRUCTIONAL REQUIREMENTS
14/30291762 DC : 0 BS EN 1434-6 - HEAT METERS - PART 6: INSTALLATION, COMMISSIONING, OPERATIONAL MONITORING AND MAINTENANCE
14/30291759 DC : 0 BS EN 1434-5 - HEAT METERS - PART 5: INITIAL VERIFICATION TESTS
PREN 1434-4 : DRAFT 2014 HEAT METERS - PART 4: PATTERN APPROVAL TESTS
PREN 1434-2 : DRAFT 2014 HEAT METERS - PART 2: CONSTRUCTIONAL REQUIREMENTS
PREN 1434-6 : DRAFT 2014 HEAT METERS - PART 6: INSTALLATION, COMMISSIONING, OPERATIONAL MONITORING AND MAINTENANCE
PREN 1434-5 : DRAFT 2014 HEAT METERS - PART 5: INITIAL VERIFICATION TESTS

EN 13757-5:2015 Communication systems for meters - Part 5: Wireless M-Bus relaying
EN 13757-4:2013 Communication systems for meters and remote reading of meters - Part 4: Wireless meter readout (Radio meter reading for operation in SRD bands)
EN 60751:2008 INDUSTRIAL PLATINUM RESISTANCE THERMOMETERS AND PLATINUM TEMPERATURE SENSORS
PREN 1434-4 : DRAFT 2014 HEAT METERS - PART 4: PATTERN APPROVAL TESTS
2012/19/EU : 2012 COR 1 2015 DIRECTIVE 2012/19/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL OF 4 JULY 2012 ON WASTE ELECTRICAL AND ELECTRONIC EQUIPMENT (WEEE) (RECAST)
CEN/CLC/ETSI/TR 50572 : 2011 FUNCTIONAL REFERENCE ARCHITECTURE FOR COMMUNICATIONS IN SMART METERING SYSTEMS
EN 61010-1:2010 Safety requirements for electrical equipment for measurement, control, and laboratory use - Part 1: General requirements
PREN 1434-2 : DRAFT 2014 HEAT METERS - PART 2: CONSTRUCTIONAL REQUIREMENTS
EN 13757-1:2014 Communication systems for meters - Part 1: Data exchange

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more