Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

PREN 1279-6 : DRAFT 2015

Current

Current

The latest, up-to-date edition.

GLASS IN BUILDING - INSULATING GLASS UNITS - PART 6: FACTORY PRODUCTION CONTROL AND PERIODIC TESTS

Published date

29-06-2015

Sorry this product is not available in your region.

Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Factory production control requirements
Annex A (normative) - Inspection and testing
        tables of insulating glass units
Annex B (normative) - Periodic testing and inspection
Annex C (informative) - Adhesion test for leaded light
        strip
Annex D (informative) - Sealant, adhesion measurements
Annex E (informative) - Sealants, hardness measurements
Annex F (informative) - Two component sealants: check
        on the thoroughness of mixing
Annex G (informative) - Tightness check of hollow
        spacer closed by welding on the back
Annex H (informative) - Desiccant, water adsorption
        capacity check
Annex I (informative) - Desiccant Matrix Adhesion
        test in open u-channels
Annex J (informative) - Adhesion test for insulating
        glass units with pre-extruded flexible spacer
        incorporating desiccant
Annex K (informative) - Reference method for
        dew point temperature measurement
Bibliography

Specifies the routine factory production control, the periodic testing and inspection and test methods to verify that an insulating glass unit (IGU) conforms to the system description.

Committee
TC 129
DocumentType
Draft
PublisherName
Comite Europeen de Normalisation
Status
Current

Standards Relationship
15/30319706 DC : 0 Identical
15/30319706 DC : DRAFT JUNE 2015 Identical

PREN 1279-2 : DRAFT 2015 GLASS IN BUILDING - INSULATING GLASS UNITS - PART 2: LONG TERM TEST METHOD AND REQUIREMENTS FOR MOISTURE PENETRATION
15/30319715 DC : 0 BS EN 1279-5 - GLASS IN BUILDING - INSULATING GLASS UNITS - PART 5: EVALUATION OF CONFORMITY
PREN 1279-4 : DRAFT 2015 GLASS IN BUILDING - INSULATING GLASS UNITS - PART 4: METHODS OF TEST FOR THE PHYSICAL ATTRIBUTES OF EDGE SEAL COMPONENTS AND INSERTS
15/30319712 DC : 0 BS EN 1279-4 - GLASS IN BUILDING - INSULATING GLASS UNITS - PART 4: METHODS OF TEST FOR THE PHYSICAL ATTRIBUTES OF EDGE SEAL COMPONENTS AND INSERTS
15/30319721 DC : 0 BS EN 1279-2 - GLASS IN BUILDING - INSULATING GLASS UNITS - PART 2: LONG TERM TEST METHOD AND REQUIREMENTS FOR MOISTURE PENETRATION
PREN 1279-5 : DRAFT 2015 GLASS IN BUILDING - INSULATING GLASS UNITS - PART 5: EVALUATION OF CONFORMITY
03/100996 DC : DRAFT MAR 2003 PREN 13022-1 - GLASS IN BUILDING - STRUCTURAL SEALANT GLAZING - GLASS PRODUCTS FOR STRUCTURAL SEALANT GLAZING SYSTEMS - SUPPORTED AND UNSUPPORTED MONOLITHIC AND MULTIPLE GLAZING
01/105395 DC : DRAFT JULY 2001 PREN 1279-5 - GLASS IN BUILDING - INSULATING GLASS UNITS - PART 5: EVALUATION OF CONFORMITY

MIL-I-25135 Revision E:1984 INSPECTION MATERIALS, PENETRANTS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more