PD CLC/TS 61400-26-2:2017
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
View Superseded by
Wind turbines Production-based availability for wind turbines
Hardcopy , PDF
15-11-2019
English
26-10-2017
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Information model
Annex A (informative) - Possible methods for the
determination of potential energy production
Annex B (informative) - Production-based
availability indicators - examples
Annex C (informative) - Capacity factor and other
performance indicators
Annex D (informative) - Verification scenarios - examples
Annex E (informative) - Considerations of competing
assignment of lost production
Bibliography
Annex ZA (normative) - Normative references to
international publications with their
corresponding European publications
Defines a framework from which production-based performance indicators of a WTGS (wind turbine generator system) can be derived.
Committee |
PEL/88
|
DevelopmentNote |
2017 Edition incorporates corrigendum to BS PD IEC TS 61400-26-2. Renumbers and supersedes BS PD IEC TS 61400-26-2. (11/2017)
|
DocumentType |
Standard
|
Pages |
53
|
PublisherName |
British Standards Institution
|
Status |
Withdrawn
|
SupersededBy | |
Supersedes |
This part of IEC 61400 provides a framework from which production-based performance indicators of a WTGS (wind turbine generator system) can be derived. It unambiguously describes how data is categorised and provides examples of how the data can be used to derive performance indicators.
The approach of this part of IEC 61400 is to expand the time allocation model, introduced in IEC TS 61400-26-1, with two additional layers for recording of the actual energy production and potential energy production associated with the concurrent time allocation.
It is not the intention of this Technical Specification to define how production-based availability shall be calculated. Nor is it the intention to form the basis for power curve performance measurements, which is the objective of IEC 61400-12.
This document also includes informative annexes with:
examples of determination of lost production,
examples of algorithms for production-based indicators,
examples of other performance indicators,
examples of application scenarios.
Standards | Relationship |
CLC/TS 61400-26-2:2017 | Identical |
IEC TS 61400-26-2:2014 | Identical |
IEC 61400-12-1:2017 | Wind energy generation systems - Part 12-1: Power performance measurements of electricity producing wind turbines |
IEEE 762-2006 | IEEE Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity |
ISO 3977-9:1999 | Gas turbines — Procurement — Part 9: Reliability, availability, maintainability and safety |
IEC TS 61400-26-1:2011 | Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems |
IEC 61400-25-4:2016 | Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile |
IEC 61400-25-1:2017 | Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models |
IEC 61400-25-6:2016 | Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring |
CLC/TS 61400-26-1:2017 | Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems |
IEC 61400-25-3:2015 | Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models |
IEC 61400-25-2:2015 | Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models |
IEC 61400-1:2005+AMD1:2010 CSV | Wind turbines - Part 1: Design requirements |
IEC 61400-25-5:2017 | Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.