Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

NS EN 12101-10 : 2005 AC 2007

Current

Current

The latest, up-to-date edition.

SMOKE AND HEAT CONTROL SYSTEMS - PART 10: POWER SUPPLIES

Published date

12-01-2013

Sorry this product is not available in your region.

Foreword
Introduction
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
   3.1 Terms and definitions
   3.2 Abbreviations
4 General requirements (electrical)
   4.1 General
   4.2 Batteries
   4.3 Generator sets
5 General requirements (pneumatic)
   5.1 General
   5.2 Power sources
6 Functions
   6.1 Power supply from the primary power source (electrical)
   6.2 Power supply from the secondary power source (battery)
   6.3 Power supply from the secondary power source (generators)
   6.4 Recognition and indication of faults (electrical)
   6.5 Power supply from compressed gases
7 Materials, design and manufacture
   7.1 Mechanical design
   7.2 Electrical design
8 Classification
9 Documentation
   9.1 User's documentation
   9.2 Design documentation
10 Marking
   10.1 General
   10.2 Gas bottles
11 General test requirements
   11.1 Standard atmospheric conditions for testing
   11.2 Mounting and orientation
   11.3 Electrical connection
   11.4 Selection of tests
12 Tests
   12.1 Electrical functional test
   12.2 Pneumatic functional test
   12.3 Test of the charger and the secondary power source
   12.4 Cold (operational)
   12.5 Damp heat, steady state (operational)
   12.6 Impact (operational)
   12.7 Vibration, sinusoidal (operational)
   12.8 Damp heat, steady state (endurance)
   12.9 Vibration, sinusoidal (endurance)
   12.10 Dry heat (operational)
   12.11 SO[2] corrosion
   12.12 Salt spray testing
   12.13 Protection against water
   12.14 Protection against solid foreign objects
   12.15 EMC immunity tests (operational)
13 Evaluation of conformity
   13.1 General
   13.2 Initial type testing
   13.3 Factory production control (FPC)
Annex A (informative) Summary of functions
Annex ZA (informative) Clauses of this European Standard addressing
         the provisions of the EU Construction Products Directive
      ZA.1 Scope and relevant characteristics
      ZA.2 Procedure for attestation of conformity of power supply
           equipment
           ZA.2.1 System of attestation of conformity
           ZA.2.2 EC Certificate and Declaration of conformity
      ZA.3 CE marking and labelling

Describes requirements and gives test methods for primary and secondary electrical and pneumatic power supply equipment, designed for use in smoke and heat control systems in buildings. It also provides for the evaluation of conformity of such equipment to the requirements of this European Standard.

DocumentType
Standard
PublisherName
Norwegian Standards (Norges Standardiseringsforbund)
Status
Current

Standards Relationship
DIN EN 12101-10:2006-01 Identical
UNI EN 12101-10 : 2007 Identical
BS EN 12101-10:2005 Identical
UNE-EN 12101-10:2007 Identical

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more