Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

NBN EN 61803 : 1999 AMD 1 2011

Current

Current

The latest, up-to-date edition.

BEPALING VAN HET VERMOGENVERLIES IN HOOGSPANNINGSGELIJKSTROOM-OMZETSTATIONS

Published date

12-01-2013

Sorry this product is not available in your region.

1 Scope
2 Normative references
3 Definitions and symbols
    3.1 Definitions
    3.2 Letter symbols
4 General
    4.1 Introduction
    4.2 Ambient conditions
          4.2.1 Outdoor standard reference temperature
          4.2.2 Coolant standard reference temperature
          4.2.3 Standard reference air pressure
    4.3 Operating parameters
5 Determination of equipment losses
    5.1 Thyristor valve losses
          5.1.1 Thyristor conduction loss per valve
          5.1.2 Thyristor spreading loss per valve
          5.1.3 Other conduction losses per valve
          5.1.4 DC voltage-dependent loss per valve
          5.1.5 Damping loss per valve (resistor-dependent
                  term)
          5.1.6 Damping loss per valve (change of capacitor
                  energy term)
          5.1.7 Turn-off losses per valve
          5.1.8 Reactor loss per valve
          5.1.9 Total valve losses
          5.1.10 Temperature effects
          5.1.11 No-load operation loss per valve
    5.2 Converter transformer losses
          5.2.1 General
          5.2.2 No-load operation losses
          5.2.3 Operating losses
          5.2.4 Auxiliary power losses
    5.3 AC filter losses
          5.3.1 General
          5.3.2 AC filter capacitor losses
          5.3.3 AC filter reactor losses
          5.3.4 AC filter resistor losses
          5.3.5 Total a.c. filter losses
    5.4 Shunt capacitor bank losses
    5.5 Shunt reactor losses
    5.6 DC smoothing reactor losses
    5.7 DC filter losses
          5.7.1 General
          5.7.2 DC filter capacitor losses
          5.7.3 DC filter reactor losses
          5.7.4 DC filter resistor losses
          5.7.5 Total d.c. filter losses
    5.8 Auxiliaries and station service losses
    5.9 Radio interference/PLC filter losses
    5.10 Other equipment losses
Annex A (normative) Calculation of harmonic currents and
voltages
      A.1 Harmonic currents in converter transformers
      A.2 Harmonic currents in a.c. filters
      A.3 Harmonic voltages on the d.c. side
      A.4 DC side harmonic currents in the smoothing reactor
Annex B (informative) Typical station losses
Annex C (informative) Bibliography
Annex ZA (normative) Normative references to international
publications with their corresponding European publications

Applicable to all line-commutated high-voltage direct current (HVDC) converter stations for the use of power exchange in utility systems. Presumes the use of 12-pulse thyristor converters, but can, also be used for 6-pulse thyristor converters (to be used with due care). Gives a set of procedures for the determination of the total losses of an HVDC converter station. These procedures covers all parts, and addresses no-load operation and operating losses together with their methods of calculation which use, when possible, measured parameters.

DocumentType
Standard
PublisherName
Belgian Standards
Status
Current

Standards Relationship
DIN EN 61803:2011-09 Identical
I.S. EN 61803:1999 Identical
BS EN 61803 : 1999 Identical
EN 61803:1999/A2:2016 Identical
NF EN 61803 : 2000 AMD 2 2017 Identical
SN EN 61803 : 1999 + A1 + A2 Identical

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more