Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

NBN EN 14679 : 2005 COR 2006

Current

Current

The latest, up-to-date edition.

EXECUTION OF SPECIAL GEOTECHNICAL WORKS - DEEP MIXING

Published date

12-01-2013

Sorry this product is not available in your region.

1 Scope
2 Normative references
3 Terms and definitions
4 Information needed for the execution of the work
   4.1 General
   4.2 Particular requirements
5 Geotechnical investigation
   5.1 General
   5.2 Specific information
6 Materials and products
   6.1 General
   6.2 Special considerations
7 Considerations related to design
   7.1 General
   7.2 Additional design considerations
   7.3 Selection of the binder and the additives
   7.4 Laboratory and in-situ mixing and treatment tests
   7.5 Design statement
8 Execution
   8.1 Method statement
   8.2 Preparation of the site
   8.3 Field trials
   8.4 Execution tolerances
        8.4.1 General
   8.5 Quality control and quality assurance
   8.6 Deep mixing
        8.6.1 General
        8.6.2 Dry mixing
        8.6.3 Wet mixing
   8.7 Installation of structural reinforcement
9 Supervision, testing and monitoring
   9.1 General
   9.2 Supervision
   9.3 Testing
   9.4 Monitoring
   9.5 Performance of the treated soil
   9.6 Other aspects
10 Records
   10.1 Records during construction
   10.2 Records at the completion of the work
11 Special requirements
   11.1 General
   11.2 Safety
   11.3 Environmental protection
   11.4 Impact on adjacent structures
Annex A (informative) Practical aspects of deep mixing
   A.1 Introduction
   A.2 Fields of application
   A.3 Execution
        A.3.1 General
        A.3.2 Dry mixing
        A.3.3 Wet mixing
        A.3.4 Patterns of installation
        A.3.5 Hybrid methods
   A.4 Construction considerations
Annex B (informative) Aspects of design
   B.1 General
        B.1.1 Scope
        B.1.2 Application
   B.2 Design principles
   B.3 Execution process of deep mixing
   B.4 Choice of binder
   B.5 Testing
        B.5.1 General
        B.5.2 Laboratory testing
        B.5.3 Field testing
   B.6 Correlation of various properties of treated soil
        B.6.1 Field strength and laboratory strength
        B.6.2 Correlation between mechanical characteristics and
              unconfined compressive strength
   B.7 Aspects of design
        B.7.1 Stability
        B.7.2 Settlement
        B.7.3 Confinement
Annex C (informative) Degree of obligation of the provision
Bibliography

Defines general principles for the execution, testing, supervision and monitoring of deep mixing works carried out by two different methods: dry mixing and wet mixing.

DocumentType
Standard
PublisherName
Belgian Standards
Status
Current

Standards Relationship
DIN EN 14679:2005-07 Identical
BS EN 14679:2005 Identical
UNI EN 14679 : 2005 Identical

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.