IEEE 1207-2011
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
IEEE Guide for the Application of Turbine Governing Systems for Hydroelectric Generating Units
24-03-2022
English
20-06-2011
1. Overview
2. Normative references
3. Definitions
4. Functions and characteristics
5. Elements of the turbine governing system
6. Equipment specifications
7. Performance specifications
8. Information to be provided by the manufacturer
9. Acceptance tests
10. Data to be furnished by the purchaser
Annex A (informative) - Bibliography
Annex B (informative) - Impact of turbine design on governing
performance
Annex C (informative) - Examples of turbine governing systems
Annex D (informative) - Experience gained from challenging
applications
Annex E (informative) - Governor simulations to demonstrate
sensitivity of governor parameters on
performance
Annex F (informative) - Tuning of turbine governing systems
Annex G (informative) - Verification of turbine governing system
performance
Annex H (informative) - Techniques for evaluating speed control
performance of turbine
This guide complements IEEE Std 125 by providing application details and the impact of plant and system features upon hydroelectric governing performance.
Committee |
Energy Development & Power Generation
|
DocumentType |
Standard
|
ISBN |
978-0-7381-6702-2
|
Pages |
131
|
PublisherName |
Institute of Electrical & Electronics Engineers
|
Status |
Withdrawn
|
Supersedes |
IEEE DRAFT 1147 : D8 2005 | GUIDE FOR THE REHABILITATION OF HYDROELECTRIC POWER PLANTS |
12/30260040 DC : 0 | BS EN 62270 - GUIDE FOR COMPUTER-BASED CONTROL FOR HYDROELECTRIC POWER PLANT AUTOMATION |
IEEE DRAFT 125 : D8.5 2006 | PREPARATION OF EQUIPMENT SPECIFICATIONS FOR SPEED-GOVERNING OF HYDRAULIC TURBINES INTENDED TO DRIVE ELECTRIC GENERATORS |
IEC 62270:2013 | Guide for computer-based control for hydroelectric power plant automation |
IEEE 1147-2005 | IEEE Guide for the Rehabilitation of Hydroelectric Power Plants |
IEEE/IEC 1249-2013 | IEC/IEEE Guide for Computer-based Control for Hydroelectric Power Plant Automation |
IEEE 1020-2023 | IEEE Guide for Control of Small (100 kVA to 5 MVA) Hydroelectric Power Plants |
IEEE 1147-2021 | IEEE Guide for the Rehabilitation of Hydroelectric Power Plants |
IEC 60255-22-1:2007 | Measuring relays and protection equipment - Part 22-1: Electrical disturbance tests - 1 MHz burst immunity tests |
IEEE 125-2007 | IEEE Recommended Practice for Preparation of Equipment Specifications for Speed-Governing of Hydraulic Turbines Intended to Drive Electric Generators |
IEC 61000-4-4:2012 RLV | Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test |
IEC 61116:1992 | Electromechanical equipment guide for small hydroelectric installations |
IEC 60308:2005 | Hydraulic turbines - Testing of control systems |
IEC 61000-4-2:2008 | Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity test |
IEC 61000-4-3:2006+AMD1:2007+AMD2:2010 CSV | Electromagnetic compatibility (EMC) - Part 4-3: Testing and measurement techniques - Radiated, radio-frequency, electromagnetic field immunity test |
IEEE C37.90.2:2004 | WITHSTAND CAPABILITY OF RELAY SYSTEMS TO RADIATED ELECTROMAGNETIC INTERFERENCE FROM TRANSCEIVERS |
IEC 60255-5:2000 | Electrical Relays - Part 5: Insulation coordination for measuring relays and protection equipment - Requirements and tests |
IEEE C37.90.1-2012 | IEEE Standard for Surge Withstand Capability (SWC) Tests for Relays and Relay Systems Associated with Electric Power Apparatus |
IEEE/IEC 1249-2013 | IEC/IEEE Guide for Computer-based Control for Hydroelectric Power Plant Automation |
IEC 61362:2012 | Guide to specification of hydraulic turbine governing systems |
IEEE 1147-2005 | IEEE Guide for the Rehabilitation of Hydroelectric Power Plants |
IEC 60255-22-4:2008 | Measuring relays and protection equipment - Part 22-4: Electrical disturbance tests - Electrical fast transient/burst immunity test |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.