Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

IEC 62439-3:2016

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR)

Available format(s)

Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users

Language(s)

English - French

Published date

31-03-2016

Superseded date

15-12-2021

Superseded by

IEC 62439-3:2021

$848.03
Including GST where applicable

IEC 62439-3:2016 is applicable to high-availability automation networks based on the Ethernet technology. This part of IEC 62439 specifies two redundancy protocols designed to provide seamless recovery in case of single failure of an inter-bridge link or bridge in the network, which are based on the same scheme: parallel transmission of duplicated information. This third edition cancels and replaces the second edition published in 2012. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition:
- technical corrections and extension of specifications;
- consideration of IEC 61588 clock synchronization with end-to-end delay measurement alongside the existing peer-to-peer delay measurement in PRP.

Committee
TC 65/SC 65C
DevelopmentNote
Supersedes IEC 62439. (02/2010) To be read in conjunction with IEC 62439-1. (07/2012) Stability Date: 2020. (04/2016)
DocumentType
Standard
Pages
354
PublisherName
International Electrotechnical Committee
Status
Superseded
SupersededBy
Supersedes

BS EN 62439-5:2010 Industrial communication networks. High availability automation networks Beacon redundancy protocol (BRP)
PD IEC/PAS 61850-9-3:2015 Communication networks and systems for power utility automation Precision time protocol profile for power utility automation
17/30358185 DC : 0 BS EN 61850-8-1+A1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3
BS EN 62439-1 : 2010 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 1: GENERAL CONCEPTS AND CALCULATION METHODS
CEI EN 61850-9-2 : 2012 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3
BS EN 61850-8-1:2011 Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
IEEE C37.241-2017 IEEE Guide for Application of Optical Instrument Transformers for Protective Relaying
CEI EN 61850-8-1 : 2012 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3
I.S. EN 61850-9-2:2011 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3 (IEC 61850-9-2:2011 (EQV))
IEC 61400-25-4:2016 RLV Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
EN 61400-25-4:2017 Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
EN 61850-10:2013 Communication networks and systems for power utility automation - Part 10: Conformance testing
EN 61162-460:2015 Maritime navigation and radiocommunication equipment and systems - Digital interfaces - Part 460: Multiple talkers and multiple listeners - Ethernet interconnection - Safety and security
EN 62439-6:2010 Industrial communication networks - High availability automation networks - Part 6: Distributed Redundancy Protocol (DRP)
I.S. EN 62439-6:2010 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 6: DISTRIBUTED REDUNDANCY PROTOCOL (DRP)
15/30327752 DC : 0 BS EN 4660-003 - AEROSPACE SERIES - MODULAR AND OPEN AVIONICS ARCHITECTURES - PART 003: COMMUNICATIONS AND NETWORK
09/30145360 DC : 0 BS EN 61850-9-2 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM)- SAMPLED VALUES OVER ISO/IEC 8802-3
BS EN 62439-6:2010 Industrial communication networks. High availability automation networks Distributed redundancy protocol (DRP)
BS EN 61400-25-4:2008 Wind turbines Communications for monitoring and control of wind power plants. Mapping to communication profile
CEI EN 61850-10 : 2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING
14/30297254 DC : 0 BS EN 62439-X - INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS
BS EN 61850-9-2:2011 Communication networks and systems for power utility automation Specific communication service mapping (SCSM). Sampled values over ISO/IEC 8802-3
IEC TR 61850-90-5:2012 Communication networks and systems for power utility automation - Part 90-5: Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118
IEC 62439-4:2010 Industrial communication networks - High availability automation networks - Part 4: Cross-network Redundancy Protocol (CRP)
I.S. EN 62439-5:2010 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 5: BEACON REDUNDANCY PROTOCOL (BRP)
EN 62439-1:2010/A2:2017 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 1: GENERAL CONCEPTS AND CALCULATION METHODS (IEC 62439-1:2010/A2:2016)
16/30346333 DC : 0 BS EN 61162-460 - MARITIME NAVIGATION AND RADIOCOMMUNICATION EQUIPMENT AND SYSTEMS -DIGITAL INTERFACES - PART 460: MULTIPLE TALKERS AND MULTIPLE LISTENERS - ETHERNET INTERCONNECTION - SAFETY AND SECURITY
CEI EN 61400-25-4 : 2009 WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE
BS EN 61850-10:2013 Communication networks and systems for power utility automation Conformance testing
PD IEC/TR 61850-90-4:2013 Communication networks and systems for power utility automation Network engineering guidelines
I.S. EN 61162-460:2015 MARITIME NAVIGATION AND RADIOCOMMUNICATION EQUIPMENT AND SYSTEMS - DIGITAL INTERFACES - PART 460: MULTIPLE TALKERS AND MULTIPLE LISTENERS - ETHERNET INTERCONNECTION - SAFETY AND SECURITY
I.S. EN IEC 62439-5:2018 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 5: BEACON REDUNDANCY PROTOCOL (BRP)
EN IEC 62439-5:2018 Industrial communication networks - High availability automation networks - Part 5: Beacon Redundancy Protocol (BRP)
IEC 62439-1:2010+AMD1:2012+AMD2:2016 CSV Industrial communication networks - High availability automation networks - Part 1: General concepts and calculation methods
EN 61850-9-2:2011 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3
BS EN 62439-4 : 2010 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 4: CROSS-NETWORK REDUNDANCY PROTOCOL (CRP)
PD IEC/TR 61850-90-12:2015 Communication networks and systems for power utility automation Wide area network engineering guidelines
BS EN 61162-460:2015 Maritime navigation and radiocommunication equipment and systems. Digital interfaces Multiple talkers and multiple listeners. Ethernet interconnection. Safety and security
PD IEC/TR 61850-90-5:2012 Communication networks and systems for power utility automation Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118
16/30344496 DC : 0 BS EN 61850-9-2+A1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 9-2: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - SAMPLED VALUES OVER ISO/IEC 8802-3
CEI EN 62439-2 : 2011 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 2: MEDIA REDUNDANCY PROTOCOL (MRP)
I.S. EN 62439-1:2010 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 1: GENERAL CONCEPTS AND CALCULATION METHODS
I.S. EN 61850-8-1:2011 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 8-1: SPECIFIC COMMUNICATION SERVICE MAPPING (SCSM) - MAPPINGS TO MMS (ISO 9506-1 AND ISO 9506-2) AND TO ISO/IEC 8802-3
IEC 62439-5:2016 Industrial communication networks - High availability automation networks - Part 5: Beacon Redundancy Protocol (BRP)
IEC 61850-9-2:2011 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3
I.S. EN 61850-9-2:2011/A1:2020 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 (IEC 61850-9-2:2011/A1:2020)<br>
IEC 61400-25-4:2016 Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
IEC 62439-6:2010 Industrial communication networks - High availability automation networks - Part 6: Distributed Redundancy Protocol (DRP)
EN 61850-8-1:2011 Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
I.S. EN 61400-25-4:2017 WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE
CEI EN 62439-5 : 2011 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 5: BEACON REDUNDANCY PROTOCOL (BRP)
IEEE 2030.100-2017 IEEE Recommended Practice for Implementing an IEC 61850-Based Substation Communications, Protection, Monitoring, and Control System
I.S. EN 62439-4:2010 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 4: CROSS-NETWORK REDUNDANCY PROTOCOL (CRP) (IEC 62439-4:2010 (EQV))
I.S. EN 61850-10:2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING (IEC 61850-10:2012 (EQV))
EN 62439-4:2010/A1:2012 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 4: CROSS-NETWORK REDUNDANCY PROTOCOL (CRP) (IEC 62439-4:2010/A1:2012)
IEC 61850-8-1:2011 Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
IEC 61850-10:2012 Communication networks and systems for power utility automation - Part 10: Conformance testing

ISO/IEC 9646-7:1995 Information technology — Open Systems Interconnection — Conformance testing methodology and framework — Part 7: Implementation Conformance Statements
IEEE 802.1Q-2014 IEEE Standard for Local and metropolitan area networks--Bridges and Bridged Networks
IEEE 802.1D-2004 IEEE Standard for Local and metropolitan area networks: Media Access Control (MAC) Bridges
IEC 61850-8-1:2011 Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
IEC 61850-9-2:2011 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3
IEC 61588:2009 Precision clock synchronization protocol for networked measurement and control systems
IEC 62439-1:2010+AMD1:2012+AMD2:2016 CSV Industrial communication networks - High availability automation networks - Part 1: General concepts and calculation methods
IEC 62439-6:2010 Industrial communication networks - High availability automation networks - Part 6: Distributed Redundancy Protocol (DRP)
ISO/IEC 8802-2:1998 Information technology — Telecommunications and information exchange between systems — Local and metropolitan area networks — Specific requirements — Part 2: Logical link control
IEC 62439-2:2016 Industrial communication networks - High availability automation networks - Part 2: Media Redundancy Protocol (MRP)
ISO/IEC/IEEE 8802-3:2017 Information technology — Telecommunications and information exchange between systems — Local and metropolitan area networks — Specific requirements — Part 3: Standard for Ethernet
IEC 62439-7:2011 Industrial communication networks - High availability automation networks - Part 7: Ring-based Redundancy Protocol (RRP)

Access your standards online with a subscription

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

$848.03
Including GST where applicable