IEC 62264-3:2016
Current
The latest, up-to-date edition.
Enterprise-control system integration - Part 3: Activity models of manufacturing operations management
Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users
English - French
16-12-2016
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Structuring concepts
5 Structuring models
6 Production operations management
7 Maintenance operations management
8 Quality operations management
9 Inventory operations management
10 Completeness, compliance and conformance
Annex A (informative) - Technical and responsibility
boundaries
Annex B (informative) - Scheduling hierarchy
Annex C (informative) - Frequently asked questions
Annex D (informative) - Advanced planning and
scheduling concepts for manufacturing
operations management
Bibliography
L’IEC 62264-3:2016 définit des modèles de gestion des opérations de fabrication permettant l’intégration des systèmes de commande d’entreprise. Les activités définies dans le présent document sont cohérentes avec les définitions des modèles d’objets données dans l’IEC 62264-1. Les activités modélisées agissent entre les fonctions de planification et de logistique d’entreprises, définies comme étant des fonctions de Niveau 4, et les fonctions de contrôle de processus, définies comme étant des fonctions de Niveau 2 de l’IEC 62264-1. IEC 62264-3:2016 defines activity models of manufacturing operations management that enable enterprise system to control system integration. The activities defined in this document are consistent with the object models definitions given in IEC 62264-1. The modelled activities operate between business planning and logistics functions, defined as the Level 4 functions and the process control functions, defined as the Level 2 functions of IEC 62264-1. Cette édition constitue une révision technique. Cette édition inclut les modifications techniques majeures suivantes par rapport à l'édition précédente:
a) 4.1 Gestion des opérations de fabrication déplacé dans la Partie 1 et, par conséquent, supprimé de la Partie 3;
b) 4.2 Hiérarchie fonctionnelle déplacé dans la Partie 1 et, par conséquent, supprimé de la Partie 3;
c) 4.4 Critère pour la définition des activités au-dessous du niveau 4 déplacé dans la Partie 1 et, par conséquent, supprimé de la Partie 3;
d) 4.5 Catégories d’informations de production déplacé dans la Partie 1 et, par conséquent, supprimé de la Partie 3;
e) 4.6 Informations sur les opérations de production déplacé dans la Partie 1 et, par conséquent, supprimé de la Partie 3;
f) 5.3 Modèle développé de hiérarchie d’équipement déplacé dans la Partie 1 et, par conséquent, supprimé de la Partie 3;
g) 5.4 Modèle développé de hiérarchie de décision supprimé de la Partie 3. La section correspondante a été supprimée de la Partie 1 et remplacée par une référence à l’ISO 15704;
h) Annexe A (informative) Autres activités d’entreprise affectant les opérations de fabrication déplacée dans la Partie 1 et, par conséquent, supprimée de la Partie 3;
i) Annexe D (informative) Normes associées déplacée dans la Partie 1 et, par conséquent, supprimée de la Partie 3;
j) Annexe F (informative) Application du modèle hiérarchique de décision à la gestion des opérations de fabrication supprimée de la Partie 3. La section correspondante a été supprimée de la Partie 1 et remplacée par une référence à l’ISO 15704;
k) Annexe G (informative) Application de l’ontologie PSLX à la gestion des opérations de fabrication supprimée de la Partie 3. Le comité a considéré que cette section était plus appropriée sous forme d’un livre blanc ou rapport technique PSLX.
Modification des désignations des données pour correspondre à celles de la Partie 4. Ces modifications de désignations ont été apportées dans toutes les figures et dans l’ensemble du texte.
Committee |
TC 65/SC 65E
|
DevelopmentNote |
Stability Date: 2019. (12/2016)
|
DocumentType |
Standard
|
Pages |
171
|
PublisherName |
International Electrotechnical Committee
|
Status |
Current
|
Supersedes |
Standards | Relationship |
NF EN 62264-3 : 2017 | Identical |
EN 62264-3:2017 | Identical |
BS EN 62264-3:2017 | Identical |
DIN EN 62264-3:2016-10 (Draft) | Identical |
SN EN 62264-3 : 2017 | Identical |
PN EN 62264-3 : 2017 | Identical |
NEN EN IEC 62264-3 : 2017 | Identical |
UNE-EN 62264-3:2017 | Identical |
PNE-FprEN 62264-3 | Identical |
GOST R IEC 62264-3 : 2012 | Identical |
BS ISO 22400-2 : 2014 | AUTOMATION SYSTEMS AND INTEGRATION - KEY PERFORMANCE INDICATORS (KPIS) FOR MANUFACTURING OPERATIONS MANAGEMENT - PART 2: DEFINITIONS AND DESCRIPTIONS |
DIN EN 62264-4:2016-10 | ENTERPRISE-CONTROL SYSTEM INTEGRATION - PART 4: OBJECT MODEL ATTRIBUTES FOR MANUFACTURING OPERATIONS MANAGEMENT INTEGRATION (IEC 62264-4:2015) |
11/30227627 DC : DRAFT APR 2011 | BS ISO 18435-2 - INDUSTRIAL AUTOMATION SYSTEMS AND INTEGRATION - DIAGNOSTICS, CAPABILITY ASSESSMENT, AND MAINTENANCE APPLICATIONS INTEGRATION - PART 2: DESCRIPTIONS AND DEFINITIONS OF APPLICATION DOMAIN MATRIX ELEMENTS |
BS ISO 15746-1:2015 | Automation systems and integration. Integration of advanced process control and optimization capabilities for manufacturing systems Framework and functional model |
I.S. EN 62264-4:2016 | ENTERPRISE-CONTROL SYSTEM INTEGRATION - PART 4: OBJECT MODEL ATTRIBUTES FOR MANUFACTURING OPERATIONS MANAGEMENT INTEGRATION |
CEI EN 62264-1 : 2014 | ENTERPRISE-CONTROL SYSTEM INTEGRATION - PART 1: MODELS AND TERMINOLOGY |
13/30265675 DC : 0 | BS ISO 22400-1 - MANUFACTURING OPERATIONS MANAGEMENT - KEY PERFORMANCE INDICATORS - PART 1: OVERVIEW, CONCEPTS AND TERMINOLOGY |
CEI EN 62264-5 : 2013 | ENTERPRISE-CONTROL SYSTEM INTEGRATION - PART 5: BUSINESS TO MANUFACTURING TRANSACTIONS |
I.S. EN 62264-5:2016 | ENTERPRISE-CONTROL SYSTEM INTEGRATION - PART 5: BUSINESS TO MANUFACTURING TRANSACTIONS |
EN 62264-1:2013 | Enterprise-control system integration - Part 1: Models and terminology |
BS EN 62656-5:2017 | Standardized product ontology register and transfer by spreadsheets Interface for activity description |
IEC 62656-5:2017 | Standardized product ontology register and transfer by spreadsheets - Part 5: Interface for activity description |
ISO 18828-2:2016 | Industrial automation systems and integration — Standardized procedures for production systems engineering — Part 2: Reference process for seamless production planning |
BS EN 62264-5:2016 | Enterprise-control system integration Business to manufacturing transactions |
14/30273251 DC : 0 | BS ISO 15746-1 - AUTOMATION SYSTEMS AND INTEGRATION - INTEGRATION OF ADVANCED PROCESS CONTROL AND OPTIMIZATION FOR MANUFARUING SYSTEMS - PART 1: FRAMEWORK AND FUNCTIONAL MODEL |
16/30282538 DC : 0 | BS ISO 20140-5 - AUTOMATION SYSTEMS AND INTEGRATION - EVALUATING ENERGY EFFICIENCY AND OTHER FACTORS OF MANUFACTURING SYSTEMS THAT INFLUENCE THE ENVIRONMENT - PART 5: ENVIRONMENTAL INFLUENCE EVALUATION DATA |
ISO 15746-1:2015 | Automation systems and integration Integration of advanced process control and optimization capabilities for manufacturing systems Part 1: Framework and functional model |
IEC TR 62837:2013 | Energy efficiency through automation systems |
VDI 5600 Blatt 3:2013-07 | Manufacturing Execution Systems (MES) - Logic interfaces for machine and plant control |
PD IEC/TS 62872:2015 | Industrial-process measurement, control and automation system interface between industrial facilities and the smart grid |
ISO 16100-5:2009 | Industrial automation systems and integration Manufacturing software capability profiling for interoperability Part 5: Methodology for profile matching using multiple capability class structures |
BS ISO 20140-5:2017 | Automation systems and integration. Evaluating energy efficiency and other factors of manufacturing systems that influence the environment Environmental performance evaluation data |
08/30178966 DC : DRAFT FEB 2008 | BS ISO 18435-1 - INDUSTRIAL AUTOMATION SYSTEMS AND INTEGRATION - DIAGNOSTICS, CAPABILITY ASSESSMENT, AND MAINTENANCE APPLICATIONS INTEGRATION - PART 1: OVERVIEW AND GENERAL REQUIREMENTS |
BS EN 62264-1:2013 | Enterprise-control system integration Models and terminology |
ISO 22400-2:2014 | Automation systems and integration — Key performance indicators (KPIs) for manufacturing operations management — Part 2: Definitions and descriptions |
EN 62656-5:2017 | Standardized product ontology register and transfer by spreadsheets - Part 5: Interface for activity description |
CEI EN 62656-5 : 1ED 2018 | STANDARDIZED PRODUCT ONTOLOGY REGISTER AND TRANSFER BY SPREADSHEETS - PART 5: INTERFACE FOR ACTIVITY DESCRIPTION |
I.S. EN 62656-5:2017 | STANDARDIZED PRODUCT ONTOLOGY REGISTER AND TRANSFER BY SPREADSHEETS - PART 5: INTERFACE FOR ACTIVITY DESCRIPTION |
ISO 20140-5:2017 | Automation systems and integration — Evaluating energy efficiency and other factors of manufacturing systems that influence the environment — Part 5: Environmental performance evaluation data |
ISO 18435-1:2009 | Industrial automation systems and integration Diagnostics, capability assessment and maintenance applications integration Part 1: Overview and general requirements |
16/30321990 DC : DRAFT APR 2016 | BS ISO 15746-2 - AUTOMATION SYSTEMS AND INTEGRATION - INTEGRATION OF ADVANCED PROCESS CONTROL AND OPTIMIZATION CAPABILITIES FOR MANUFACTURING SYSTEMS - PART 2: ACTIVITY MODELS AND INFORMATION EXCHANGE |
11/30217453 DC : 0 | BS ISO 22400-2 - AUTOMATION SYSTEMS AND INTEGRATION - KEY PERFORMANCE INDICATORS FOR MANUFACTURING OPERATIONS MANAGEMENT - PART 2: DEFINITIONS AND DESCRIPTIONS |
BS ISO 22400-1:2014 | Automation systems and integration. Key performance indicators (KPIs) for manufacturing operations management Overview, concepts and terminology |
BS ISO 15746-2:2017 | Automation systems and integration. Integration of advanced process control and optimization capabilities for manufacturing systems Activity models and information exchange |
15/30330610 DC | BS ISO 18828-2. Industrial automation systems and integration. Standardized procedure for production systems engineering. Part 2. Reference process for seamless production planning |
CAN/CSA-IEC/TS 62443-1-1:17 | Industrial communication networks — Network and system security — Part 1-1: Terminology, concepts and models (Adopted IEC technical specification 62443-1-1:2009, first edition, 2009-07) |
ISO 15746-2:2017 | Automation systems and integration — Integration of advanced process control and optimization capabilities for manufacturing systems — Part 2: Activity models and information exchange |
IEC TS 62443-1-1:2009 | Industrial communication networks - Network and system security - Part 1-1: Terminology, concepts and models |
ISO 22400-1:2014 | Automation systems and integration — Key performance indicators (KPIs) for manufacturing operations management — Part 1: Overview, concepts and terminology |
EN 62264-5:2016 | Enterprise-control system integration - Part 5: Business to manufacturing transactions |
IEC 62264-1:2013 | Enterprise-control system integration - Part 1: Models and terminology |
IEC 62264-5:2016 | Enterprise-control system integration - Part 5: Business to manufacturing transactions |
IEC 62264-4:2015 | Enterprise-control system integration - Part 4: Objects models attributes for manufacturing operations management integration |
EN 62264-4:2016 | Enterprise-control system integration - Part 4: Object model attributes for manufacturing operations management integration |
BS IEC 62264-5 : 2011 | ENTERPRISE-CONTROL SYSTEM INTEGRATION - PART 5: BUSINESS TO MANUFACTURING TRANSACTIONS |
PD IEC/TR 62837:2013 | Energy efficiency through automation systems |
BS EN 62264-4:2016 | Enterprise-control system integration Object model attributes for manufacturing operations management integration |
08/30180545 DC : DRAFT APR 2008 | BS EN 62264-5 - ENTERPRISE SYSTEM INTEGRATION - PART 5: BUSINESS TO MANUFACTURING TRANSACTIONS |
I.S. EN 62264-1:2013 | ENTERPRISE-CONTROL SYSTEM INTEGRATION - PART 1: MODELS AND TERMINOLOGY (IEC 62264-1:2013 (EQV)) |
14/30315266 DC : 0 | BS EN 62264-5 ED 2.0 - ENTERPRISE-CONTROL SYSTEM INTEGRATION - PART 5: BUSINESS TO MANUFACTURING TRANSACTIONS |
ISO 18828-4:2018 | Industrial automation systems and integration — Standardized procedures for production systems engineering — Part 4: Key performance indicators (KPIs) in production planning processes |
IEC TS 62872:2015 | Industrial-process measurement, control and automation system interface between industrial facilities and the smart grid |
ISA 95.00.04 : 2012 | ENTERPRISE-CONTROL SYSTEM INTEGRATION - PART 4: OBJECTS AND ATTRIBUTES FOR MANUFACTURING OPERATIONS MANAGEMENT INTEGRATION |
ISA 88.00.02 : 2001 | BATCH CONTROL - PART 2: DATA STRUCTURES AND GUIDELINES FOR LANGUAGES |
ISO 22400-1:2014 | Automation systems and integration — Key performance indicators (KPIs) for manufacturing operations management — Part 1: Overview, concepts and terminology |
IEC 61512-2:2001 | Batch control - Part 2: Data structures and guidelines for languages |
IEC 62264-4:2015 | Enterprise-control system integration - Part 4: Objects models attributes for manufacturing operations management integration |
IEC 62264-2:2013 | Enterprise-control system integration - Part 2: Object and attributes for enterprise-control system integration |
ISA 95.00.02 : 2001 | ENTERPRISE-CONTROL SYSTEM INTEGRATION - PART 2: OBJECT MODEL ATTRIBUTES |
IEC 61512-1:1997 | Batch control - Part 1: Models and terminology |
ISO 22400-2:2014 | Automation systems and integration — Key performance indicators (KPIs) for manufacturing operations management — Part 2: Definitions and descriptions |
IEC 62264-1:2013 | Enterprise-control system integration - Part 1: Models and terminology |
ISA 88.00.01 : 2010 | BATCH CONTROL - PART 1: MODELS AND TERMINOLOGY |
ISO 15704:2000 | Industrial automation systems — Requirements for enterprise-reference architectures and methodologies |
ISA 95.00.01 : 2000 | ENTERPRISE-CONTROL SYSTEM INTEGRATION - PART 1: MODELS AND TERMINOLOGY |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.