Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

IEC 61869-3:2011

Current

Current

The latest, up-to-date edition.

Instrument transformers - Part 3: Additional requirements for inductive voltage transformers

Available format(s)

Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users

Language(s)

English - French, Spanish, Castilian

Published date

13-07-2011

$339.22
Including GST where applicable

FOREWORD
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
5 Ratings
6 Design and construction
7 Tests

IEC 61869-3:2011 applies to new inductive voltage transformers for use with electrical measuring instruments and electrical protective devices at frequencies from 15 Hz to 100 Hz. This standard replaces IEC 60044-2: Inductive Voltage Transformers.

This publication is to be read in conjunction with IEC 61869-1:2007.

Committee
TC 38
DevelopmentNote
Supersedes IEC 60044-2. To be read in conjunction with IEC 61869-1. (07/2011) Stability Date: 2020. (09/2017)
DocumentType
Standard
Pages
56
PublisherName
International Electrotechnical Committee
Status
Current
Supersedes

I.S. EN 50463-2:2017 RAILWAY APPLICATIONS - ENERGY MEASUREMENT ON BOARD TRAINS - PART 2: ENERGY MEASURING
PD IEC/TS 62600-200:2013 Marine energy. Wave, tidal and other water current converters Electricity producing tidal energy converters. Power performance assessment
17/30326671 DC : 0 BS ISO 27919-1 - CARBON DIOXIDE CAPTURE - PART 1: PERFORMANCE EVALUATION METHODS FOR POST-COMBUSTION CO[2] CAPTURE INTEGRATED WITH A POWER PLANT
CEI EN 61869-6 : 1ED 2017 INSTRUMENT TRANSFORMERS - PART 6: ADDITIONAL GENERAL REQUIREMENTS FOR LOW-POWER INSTRUMENT TRANSFORMERS
EN IEC 61869-11:2018 Instrument transformers - Part 11: Additional requirements for low-power passive voltage transformers
14/30312880 DC : 0 BS EN 61869-15 ED 1.0 - INSTRUMENT TRANSFORMERS - PART 15: SPECIFIC REQUIREMENTS FOR DC VOLTAGE TRANSFORMERS
BS EN 50463-2:2017 Railway applications. Energy measurement on board trains Energy measuring
EN 61400-12-1:2017 Wind energy generation systems - Part 12-1: Power performance measurement of electricity producing wind turbines
CEI EN 50152-3-3 : 2001 RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PARTICULAR REQUIREMENTS FOR A.C. SWITCHGEAR - PART 3-3: MEASUREMENT, CONTROL AND PROTECTION DEVICES FOR SPECIFIC USE IN A.C. TRACTION SYSTEMS - VOLTAGE TRANSFORMERS
I.S. EN 61869-6:2016 INSTRUMENT TRANSFORMERS - PART 6: ADDITIONAL GENERAL REQUIREMENTS FOR LOW-POWER INSTRUMENT TRANSFORMERS
I.S. EN 50152-3-3:2016 RAILWAY APPLICATIONS - FIXED INSTALLATIONS - PARTICULAR REQUIREMENTS FOR A.C. SWITCHGEAR - PART 3-3: MEASUREMENT, CONTROL AND PROTECTION DEVICES FOR SPECIFIC USE IN A.C. TRACTION SYSTEMS - VOLTAGE TRANSFORMERS
13/30238229 DC : 0 BS EN 62052-31 - ELECTRICITY METERING EQUIPMENT (AC) - GENERAL REQUIREMENTS, TEST AND TEST CONDITIONS - PART 31: PRODUCT SAFETY REQUIREMENTS
EN 62052-31:2016 Electricity metering equipment (AC) - General requirements, tests and test conditions - Part 31: Product safety requirements and tests
EN 61869-4:2014/AC:2014 INSTRUMENT TRANSFORMERS - PART 4: ADDITIONAL REQUIREMENTS FOR COMBINED TRANSFORMERS (IEC 61869-4:2013)
EN 50152-3-3:2016 Railway applications - Fixed installations - Particular requirements for a.c. switchgear - Part 3-3: Measurement, control and protection devices for specific use in a.c. traction systems - Voltage transformers
EN 61869-6:2016 Instrument transformers - Part 6: Additional general requirements for low-power instrument transformers
UNE-IEC/TR 61869-102:2018 IN Instrument transformers - Part 102: Ferroresonance oscillations in substations with inductive voltage transformers
PD IEC/TS 62600-100:2012 Marine energy. Wave, tidal and other water current converters Electricity producing wave energy converters. Power performance assessment
BS EN 61869-4:2014 Instrument transformers Additional requirements for combined transformers
BS PD IEC TS 60076-19 : 2013 POWER TRANSFORMERS - PART 19: RULES FOR THE DETERMINATION OF UNCERTAINTIES IN THE MEASUREMENT OF THE LOSSES ON POWER TRANSFORMERS AND REACTORS
CEI EN 61869-4 : 2014 INSTRUMENT TRANSFORMERS - PART 4: ADDITIONAL REQUIREMENTS FOR COMBINED TRANSFORMERS
IEC TS 62600-100:2012 Marine energy - Wave, tidal and other water current converters - Part 100: Electricity producing wave energy converters - Power performance assessment
I.S. EN 62689-1:2016 CURRENT AND VOLTAGE SENSORS OR DETECTORS, TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 1: GENERAL PRINCIPLES AND REQUIREMENTS
S.R. CLC/TS 50549-2:2015 REQUIREMENTS FOR GENERATING PLANTS TO BE CONNECTED IN PARALLEL WITH DISTRIBUTION NETWORKS - PART 2: CONNECTION TO A MV DISTRIBUTION NETWORK
NF EN 61400-12-1:2017 WIND ENERGY GENERATION SYSTEMS - PART 12-1: POWER PERFORMANCE MEASUREMENTS OF ELECTRICITY PRODUCING WIND TURBINES
IEC TS 62600-200:2013 Marine energy - Wave, tidal and other water current converters - Part 200: Electricity producing tidal energy converters - Power performance assessment
IEC 62689-1:2016 Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 1: General principles and requirements
14/30284930 DC : 0 BS EN 62689-2 ED 1.0 - CURRENT AND VOLTAGE SENSORS OR DETECTORS TO BE USED FOR FAULT PASSAGE INDICATION PURPOSES - PART 2: GENERAL PRINCIPLES AND REQUIREMENTS
BS IEC 61892-3:2012 Mobile and fixed offshore units. Electrical installations Equipment
IEC 61869-11:2017 Instrument transformers - Part 11: Additional requirements for low power passive voltage transformers
BS EN IEC 61400-12-2:2013 Wind turbines Power performance of electricity-producing wind turbines based on nacelle anemometry
16/30347823 DC : 0 BS EN 61869-11 ED 1.0 - INSTRUMENT TRANSFORMERS - PART 11: ADDITIONAL REQUIREMENTS FOR LOW-POWER PASSIVE VOLTAGE TRANSFORMERS
I.S. EN IEC 61869-11:2018 INSTRUMENT TRANSFORMERS - PART 11: ADDITIONAL REQUIREMENTS FOR LOW-POWER PASSIVE VOLTAGE TRANSFORMERS
BS EN 60143-2:2013 Series capacitors for power systems Protective equipment for series capacitor banks
BS EN 50152-3-3:2016 Railway applications. Fixed installations. Particular requirements for a.c. switchgear Measurement, control and protection devices for specific use in a.c. traction systems. Voltage transformers
CAN/CSA-IEC 61400-12-1:17 Wind energy generation systems — Part 12-1: Power performance measurements of electricity producing wind turbines (Adopted IEC 61400-12-1:2017, second edition, 2017-03) | Systèmes de génération d’énergie éolienne — Partie 12-1 : Mesures de performance de puissance des éoliennes de production d’électricité (norme IEC 61400-12-1:2017 adoptée, deuxième édition, 2017-03)
EN 50463-2:2017 Railway applications - Energy measurement on board trains - Part 2: Energy measuring
CEI EN 60143-2 : 2014 SERIES CAPACITORS FOR POWER SYSTEMS - PART 2: PROTECTIVE EQUIPMENT FOR SERIES CAPACITOR BANKS
I.S. EN 61400-12-2:2013 WIND TURBINES - PART 12-2: POWER PERFORMANCE OF ELECTRICITYPRODUCING WIND TURBINES BASED ON NACELLE ANEMOMETRY
I.S. EN 60076-19:2015 POWER TRANSFORMERS - PART 19: RULES FOR THE DETERMINATION OF UNCERTAINTIES IN THE MEASUREMENT OF THE LOSSES ON POWER TRANSFORMERS AND REACTORS
I.S. EN 61400-12-1:2017 WIND POWER GENERATION SYSTEMS - PART 12-1: POWER PERFORMANCE MEASUREMENT OF ELECTRICITY PRODUCING WIND TURBINES
UNE-EN 60076-19:2016 Power transformers - Part 19: Rules for the determination of uncertainties in the measurement of the losses on power transformers and reactors
CSA C61869-4 : 2014 INSTRUMENT TRANSFORMERS - PART 4: ADDITIONAL REQUIREMENTS FOR COMBINED TRANSFORMERS
IEC 61892-3:2012 Mobile and fixed offshore units - Electrical installations - Part 3: Equipment
IEC 61400-12-1:2017 Wind energy generation systems - Part 12-1: Power performance measurements of electricity producing wind turbines
IEC TR 61869-102:2014 Instrument transformers - Part 102: Ferroresonance oscillations in substations with inductive voltage transformers
EN 62689-1:2016 Current and voltage sensors or detectors, to be used for fault passage indication purposes - Part 1: General principles and requirements
UNE-EN 61869-4:2017 Instrument transformers - Part 4: Additional requirements for combined transformers
CEI EN 61400-12-2 : 2013 WIND TURBINES - PART 12-2: POWER PERFORMANCE OF ELECTRICITY PRODUCING WIND TURBINES BASED ON NACELLE ANEMOMETRY
CEI EN 61400-12-1 : 2007 WIND POWER GENERATION SYSTEMS - PART 12-1: POWER PERFORMANCE MEASUREMENT OF ELECTRICITY PRODUCING WIND TURBINES
PD IEC/TR 61869-102:2014 Instrument transformers Ferroresonance oscillations in substations with inductive voltage transformers
CLC/TS 50549-2:2015 Requirements for generating plants to be connected in parallel with distribution networks - Part 2: Connection to a MV distribution network
I.S. EN 61869-4:2014 INSTRUMENT TRANSFORMERS - PART 4: ADDITIONAL REQUIREMENTS FOR COMBINED TRANSFORMERS
IEC TR 62001-4:2016 High-voltage direct current (HVDC) systems - Guidance to the specification and design evaluation of AC filters - Part 4: Equipment
IEC TS 60076-19:2013 Power transformers - Part 19: Rules for the determination of uncertainties in the measurement of the losses on power transformers and reactors
EN 61400-12-2:2013/AC:2016-10 WIND TURBINES - PART 12-2: POWER PERFORMANCE OF ELECTRICITYPRODUCING WIND TURBINES BASED ON NACELLE ANEMOMETRY (IEC 61400-12-2:2013/COR1:2016)
IEC 62052-31:2015 Electricity metering equipment (AC) - General requirements, tests and test conditions - Part 31: Product safety requirements and tests
IEC 60143-2:2012 Series capacitors for power systems - Part 2: Protective equipment for series capacitor banks
BS EN 61869-6:2016 Instrument transformers Additional general requirements for low-power instrument transformers
15/30328086 DC BS EN 61557-12. Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. Equipment for testing, measuring or monitoring of protective measures. Part 12. Power metering and monitoring devices (PMD)
BS EN 62689-1:2016 Current and voltage sensors or detectors, to be used for fault passage indication purposes General principles and requirements
I.S. EN 60143-2:2013 SERIES CAPACITORS FOR POWER SYSTEMS - PART 2: PROTECTIVE EQUIPMENT FOR SERIES CAPACITOR BANKS (IEC 60143-2:2012 (EQV))
BS EN 60076-19:2015 Power transformers Rules for the determination of uncertainties in the measurement of the losses on power transformers and reactors
PD IEC/TR 62001-4:2016 High-voltage direct current (HVDC) systems. Guidance to the specification and design evaluation of AC filters Equipment
I.S. EN 62052-31:2016 ELECTRICITY METERING EQUIPMENT (AC) - GENERAL REQUIREMENTS, TESTS AND TEST CONDITIONS - PART 31: PRODUCT SAFETY REQUIREMENTS AND TESTS
NF EN 61869-4 : 2014 INSTRUMENT TRANSFORMERS - PART 4: ADDITIONAL REQUIREMENTS FOR COMBINED TRANSFORMERS
IEC 61869-6:2016 Instrument transformers - Part 6: Additional general requirements for low-power instrument transformers
IEC 61400-12-1:2017 RLV Wind energy generation systems - Part 12-1: Power performance measurements of electricity producing wind turbines
EN 60076-19:2015 Power transformers - Part 19: Rules for the determination of uncertainties in the measurement of the losses on power transformers and reactors
EN 60143-2:2013 Series capacitors for power systems - Part 2: Protective equipment for series capacitor banks
CEI 18-58 : 2013 MOBILE AND FIXED OFFSHORE UNITS - ELECTRICAL INSTALLATIONS - PART 3: EQUIPMENT

IEC 60038:2009 IEC standard voltages
IEC 60028:1925 International standard of resistance for copper
AS 61869.4:2021 Instrument transformers Additional requirements for combined transformers (IEC 61869-4:2013 (ED.1.0) MOD)
IEC 61869-1:2007 Instrument transformers - Part 1: General requirements
AS 61869.11:2021 Instrument transformers Additional requirements for low-power passive voltage transformers (IEC 61869-11:2017 (ED 1.0) MOD)

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.