FOREWORD
1 Scope and object
2 Normative references
3 Definitions
4 Process of functional analysis and assignment
4.1 General description
4.1.1 Functional analysis
4.1.2 Assignment of functions
4.2 Basic technical team for FA and A
5 Functional analysis
5.1 General
5.2 Identification of functions
5.3 Identification of basic information and
processing requirements
5.3.1 Individual function analysis
5.3.2 Identification of time requirements
and representative events
6 Assignment of functions
6.1 General
6.2 Control function analysis
6.2.1 Identifying functional units
6.2.2 Characterising the control functions
6.2.3 Identifying control function
characteristic measurements
6.3 Development of assignment criteria
6.3.1 Characteristic measurement and man-
machine capabilit and guides
6.3.2 National law, national and
international legal rules
6.3.3 Utility and vendors' rules and policies
6.3.3 Utility and vendors' rules and policies
6.4 Assignment process
Annex A (informative) Examples of decomposition of goals and
subgoals
Annex B (informative) Beginning of PWR (pressurized water
reactor) functional analysis
Bibliography
Figure 1 - Illustrated FA and A activities given in IEC 60964
Table 1 - Humans and machines in the functional domain and in
the physical domain
Table 2 - Assignment of functions to humans and machines -
Basic structure
Specifies functional analysis and assignment procedures for the design of the control-room system for nuclear power plants and gives rules for developing criteria for the assignment of functions. Supplements IEC 60964. Is applicable to the design of new control-rooms or to backfits to existing control-rooms.
DevelopmentNote |
Stability Date: 2020. (09/2017)
|
DocumentType |
Standard
|
Pages |
39
|
PublisherName |
International Electrotechnical Committee
|
Status |
Current
|
Standards | Relationship |
DIN IEC 61839 : 2002 | Identical |
NF EN 61839 : 2014 | Identical |
NBN EN 61839 : 2014 | Identical |
NEN IEC 61839 : 2001 | Identical |
NEN EN IEC 61839 : 2014 | Identical |
PN EN 61839 : 2014 | Identical |
VDE 0491-5 : 2015 | Identical |
DIN EN 61839 : 2015 | Identical |
UNE-EN 61839:2014 | Identical |
BS EN 61839:2014 | Identical |
BS IEC 61839 : 2000 | Identical |
CEI EN 61839 : 1ED 2015 | Identical |
EN 61839:2014 | Identical |
SN EN 61839:2014 | Identical |
PNE-prEN 61839 | Identical |
BS EN 61226:2010 | Nuclear power plants. Instrumentation and control important to safety. Classification of instrumentation and control functions |
07/30135879 DC : 0 | |
BS IEC 60965 : 2009 | NUCLEAR POWER PLANTS - CONTROL ROOMS - SUPPLEMENTARY CONTROL POINTS FOR REACTOR SHUTDOWN WITHOUT ACCESS TO THE MAIN CONTROL ROOM |
CEI EN 61772 : 2013 | NUCLEAR POWER PLANTS - CONTROL ROOMS - APPLICATION OF VISUAL DISPLAY UNITS (VDUS) |
IEC 62646:2016 | Nuclear power plants - Control rooms - Computer-based procedures |
I.S. EN 62241:2015 | NUCLEAR POWER PLANTS - MAIN CONTROL ROOM - ALARM FUNCTIONS AND PRESENTATION |
CEI EN 60964 : 2011 | NUCLEAR POWER PLANTS - CONTROL ROOMS - DESIGN |
IEC TR 62247:2003 | Nuclear power plants - Main control room design - A review of the application of IEC 60964 (1989) |
EN 60965:2016 | Nuclear power plants - Control rooms - Supplementary control room for reactor shutdown without access to the main control room |
IEC TR 62096:2009 | Nuclear power plants - Instrumentation and control important to safety - Guidance for the decision on modernization |
EN 61226:2010 | Nuclear power plants - Instrumentation and control important to safety - Classification of instrumentation and control functions |
15/30300369 DC : 0 | BS IEC 62646 ED 2.0 - NUCLEAR POWER PLANTS - CONTROL ROOMS - COMPUTER BASED PROCEDURES |
BS EN 62241:2015 | Nuclear power plants. Main control room. Alarm functions and presentation |
BS EN 61772:2013 | Nuclear power plants. Control rooms. Application of visual display units (VDUs) |
BS IEC 62241 : 2004 | NUCLEAR POWER PLANTS - MAIN CONTROL ROOM - ALARM FUNCTIONS AND PRESENTATION |
03/305178 DC : DRAFT MAR 2003 | |
NF EN 61772 : 2013 | NUCLEAR POWER PLANTS - CONTROL ROOMS - APPLICATION OF VISUAL DISPLAY UNITS (VDUS) |
03/311284 DC : DRAFT JULY 2003 | IEC 62241 - NUCLEAR POWER PLANTS - MAIN CONTROL ROOM - ALARM FUNCTIONS AND PRESENTATION |
I.S. EN 61772:2013 | NUCLEAR POWER PLANTS - CONTROL ROOMS - APPLICATION OF VISUAL DISPLAY UNITS (VDUS) (IEC 61772:2009 (EQV)) |
IEC 60964:2009 | Nuclear power plants - Control rooms - Design |
IEC 61772:2009 | Nuclear power plants - Control rooms - Application of visual display units (VDUs) |
I.S. EN 60965:2016 | NUCLEAR POWER PLANTS - CONTROL ROOMS - SUPPLEMENTARY CONTROL ROOM FOR REACTOR SHUTDOWN WITHOUT ACCESS TO THE MAIN CONTROL ROOM |
I.S. EN 60964:2010 | NUCLEAR POWER PLANTS - CONTROL ROOMS - DESIGN |
BS EN 60965:2016 | Nuclear power plants. Control rooms. Supplementary control room for reactor shutdown without access to the main control room |
BS IEC 61772:2009 | Nuclear power plants. Control rooms. Application of visual display units (VDUs) |
BS IEC 60964 : 2009 | NUCLEAR POWER PLANTS - CONTROL ROOMS - DESIGN |
11/30215545 DC : 0 | BS IEC 62646 - NUCLEAR POWER PLANTS - CONTROL ROOMS - COMPUTER BASED PROCEDURES |
BS IEC 61226 : 2009 | NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL IMPORTANT TO SAFETY - CLASSIFICATION OF INSTRUMENTATION AND CONTROL FUNCTIONS |
07/30135889 DC : DRAFT DEC 2007 | IEC 61772 - NUCLEAR POWER PLANTS - CONTROL ROOMS - APPLICATION OF VISUAL DISPLAY UNIT (VDU) |
BS IEC/IEEE 62646 : 2012 | NUCLEAR POWER PLANTS - CONTROL ROOMS - COMPUTER BASED PROCEDURES |
I.S. EN 61226:2010 | NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL IMPORTANT TO SAFETY - CLASSIFICATION OF INSTRUMENTATION AND CONTROL FUNCTIONS |
IEC 61226:2009 | Nuclear power plants - Instrumentation and control important to safety - Classification of instrumentation and control functions |
IEC 60965:2016 | Nuclear power plants - Control rooms - Supplementary control room for reactor shutdown without access to the main control room |
BS IEC 62646:2016 | Nuclear power plants. Control rooms. Computer-based procedures |
15/30298379 DC : 0 | BS EN 60965 ED 3.0 - NUCLEAR POWER PLANTS - CONTROL ROOMS - SUPPLEMENTARY CONTROL ROOM FOR REACTOR SHUTDOWN WITHOUT ACCESS TO THE MAIN CONTROL ROOM |
08/30166255 DC : DRAFT JUNE 2008 | |
PD IEC/TR 62096:2009 | Nuclear power plants. Instrumentation and control important to safety. Guidance for the decision on modernization |
BS EN 60964:2010 | Nuclear power plants. Control rooms. Design |
IEC 62241:2004 | Nuclear power plants - Main control room - Alarm functions and presentation |
EN 60964:2010 | Nuclear power plants - Control rooms - Design |
EN 61772:2013 | Nuclear power plants - Control rooms - Application of visual display units (VDUs) |
EN 62241:2015 | Nuclear power plants - Main control room - Alarm functions and presentation |
IEC 61771:1995 | Nuclear power plants - Main control-room - Verification and validation of design |
IEC 60964:2009 | Nuclear power plants - Control rooms - Design |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.