I.S. EN 62053-21:2003
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
ELECTRICITY METERING EQUIPMENT (A.C.) - PARTICULAR REQUIREMENTS - PART 21: STATIC METERS FOR ACTIVE ENERGY (CLASSES 1 AND 2)
Hardcopy , PDF
24-05-2021
I.S. EN IEC 62053-21:2021/A11:2021
I.S. EN IEC 62053-21:2021
English
01-01-2003
For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.
Only cited Standards give presumption of conformance to New Approach Directives/Regulations.
National Foreword
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Standard electrical values
5 Mechanical requirements
6 Climatic conditions
7 Electrical requirements
8 Accuracy requirements
Annex A (normative) - Test circuit diagram for d.c.,
even harmonics, odd harmonics and sub-harmonics
Annex B (normative) - Electromagnet for testing the
influence of externally produced magnetic fields
Bibliography
Annex ZA (normative) Normative references to ational
publications with their corresponding European
publications
Applies only to newly manufactured static watt-hour meters of accuracy classes 1 and 2, for the measurement of alternating current electrical active energy in 50 Hz or 60 Hz networks and it applies to their type tests only.
DevelopmentNote |
Supersedes I.S. EN 61036. (03/2006) For CENELEC adoptions of IEC publications, please check www.iec.ch to be sure that you have any corrigenda that may apply. (01/2017)
|
DocumentType |
Standard
|
Pages |
74
|
PublisherName |
National Standards Authority of Ireland
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
Standards | Relationship |
BS EN 62053-21 : 2003 | Identical |
UNE-EN 62053-21:2003 | Identical |
NBN EN 62053-21 : 2003 | Identical |
EN 62053-21:2003 | Identical |
NF EN 62053-21 : 2003 AMD 1 2017 | Identical |
DIN EN 62053-21 : 2017 | Identical |
EN 62053-21:2003/A1:2017/AC:2018-05 | Identical |
IEC 62053-23:2003+AMD1:2016 CSV | Electricity metering equipment (a.c.) - Particular requirements -Part 23: Static meters for reactive energy (classes 2 and 3) |
IEC 62052-11:2003+AMD1:2016 CSV | Electricity metering equipment (a.c.) - General requirements, tests and test conditions - Part 11: Metering equipment |
IEC 62052-31:2015 | Electricity metering equipment (AC) - General requirements, tests and test conditions - Part 31: Product safety requirements and tests |
IEC 62053-61:1998 | Electricity metering equipment (a.c.) - Particular requirements - Part 61: Power consumption and voltage requirements |
IEC 62058-31:2008 | Electricity metering equipment (AC) - Acceptance inspection - Part 31: Particular requirements for static meters for active energy (classes 0,2 S, 0,5 S, 1 and 2) |
EN 61358:1996 | Acceptance inspection for direct connected alternating current static watt-hour meters for active energy (classes 1 and 2) |
EN 62052-31:2016 | Electricity metering equipment (AC) - General requirements, tests and test conditions - Part 31: Product safety requirements and tests |
EN 62053-61:1998 | Electricity metering equipment (a.c.) - Particular requirements - Part 61: Power consumption and voltage requirements |
IEC 62058-11:2008 | Electricity metering equipment (AC) - Acceptance inspection - Part 11: General acceptance inspection methods |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.