I.S. EN 60076-19:2015
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
POWER TRANSFORMERS - PART 19: RULES FOR THE DETERMINATION OF UNCERTAINTIES IN THE MEASUREMENT OF THE LOSSES ON POWER TRANSFORMERS AND REACTORS
Hardcopy , PDF
02-07-2023
English
01-01-2015
For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.
Only cited Standards give presumption of conformance to New Approach Directives/Regulations.
National Foreword
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Symbols
5 Power measurement, systematic deviation and uncertainty
6 Procedures for no-load loss measurement
7 Procedures for load loss measurement
8 Three-phase calculations
9 Reporting
10 Estimate of corrections and uncertainty contributions
Annex A (informative) - Example of load loss uncertainty
evaluation for a large power transformer
Annex B (Informative) - Example of load loss uncertainty
evaluation for a distribution transformer
Bibliography
Describes the procedures that should be applied to evaluate the uncertainty affecting the measurements of no-load and load losses during the routine tests on power transformers.
DevelopmentNote |
For CENELEC adoptions of IEC publications, please check www.iec.ch to be sure that you have any corrigenda that may apply. (01/2017)
|
DocumentType |
Standard
|
Pages |
102
|
PublisherName |
National Standards Authority of Ireland
|
Status |
Superseded
|
SupersededBy |
Standards | Relationship |
EN 60076-19:2015 | Identical |
ISO/IEC 17025:2005 | General requirements for the competence of testing and calibration laboratories |
IEC 61869-3:2011 | Instrument transformers - Part 3: Additional requirements for inductive voltage transformers |
IEC 61869-2:2012 | Instrument transformers - Part 2: Additional requirements for current transformers |
EN 61869-3 : 2011 | INSTRUMENT TRANSFORMERS - PART 3: ADDITIONAL REQUIREMENTS FOR INDUCTIVE VOLTAGE TRANSFORMERS (IEC 61869-3:2011) |
EN 61869-2 : 2012 | INSTRUMENT TRANSFORMERS - PART 2: ADDITIONAL REQUIREMENTS FOR CURRENT TRANSFORMERS |
IEC 61869-1:2007 | Instrument transformers - Part 1: General requirements |
EN 61869-1:2009 | Instrument transformers - Part 1: General requirements |
IEC 60076-1:2011 | Power transformers - Part 1: General |
CLC/TR 50462:2008 | Rules for the determination of uncertainties in the measurement of the losses on power transformers and reactors |
EN 60076-1:2011 | POWER TRANSFORMERS - PART 1: GENERAL (IEC 60076-1:2011) |
IEC 60076-2:2011 | Power transformers - Part 2: Temperature rise for liquid-immersed transformers |
EN 60076-2:2011 | Power transformers - Part 2: Temperature rise for liquid-immersed transformers |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.