I.S. EN 15167-2:2007

Current

Current

The latest, up-to-date edition.

GROUND GRANULATED BLAST FURNACE SLAG FOR USE IN CONCRETE, MORTAR AND GROUT - PART 2: CONFORMITY EVALUATION

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

01-01-2007

Preview

For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.

Only cited Standards give presumption of conformance to New Approach Directives/Regulations.

$107.62
Including GST where applicable

Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Tasks for the manufacturer
  4.1 Factory production control
      4.1.1 Concept
      4.1.2 Works' quality manual
      4.1.3 Management systems
      4.1.4 System of documentation
  4.2 Internal quality control
      4.2.1 Process control
      4.2.2 Measuring and testing
      4.2.3 Handling, storage, packaging and delivery
  4.3 Autocontrol testing of samples
      4.3.1 Sampling and testing
      4.3.2 Corrective action
      4.3.3 Measuring and test equipment for autocontrol
            testing
      4.3.4 Quality records
5 Tasks for the certification body
  5.1 General
  5.2 Surveillance, assessment and acceptance of the
      production control
      5.2.1 Inspection tasks
      5.2.2 Frequency of inspections
      5.2.3 Reports
  5.3 Evaluation of the results of autocontrol testing
      of samples
      5.3.1 Evaluation tasks
      5.3.2 Number and timing of evaluations
      5.3.3 Control period
      5.3.4 Evaluation of test results
      5.3.5 Reports
  5.4 Audit testing of samples taken at the factory/depot
      and initial type testing
      5.4.1 Sampling
      5.4.2 Number of samples
      5.4.3 Properties and test methods
      5.4.4 Testing
      5.4.5 Evaluation of test results
      5.4.6 Reports
      5.4.7 Proficiency testing
  5.5 Initial inspection of the factory and the production
      control
      5.5.1 Inspection of a new factory
      5.5.2 Inspection of an existing factory
      5.5.3 Criteria for the assessment of the production
            equipment
      5.5.4 Criteria for the assessment of laboratories
      5.5.5 Reports
  5.6 Evaluation of test results during the initial period
      5.6.1 Initial period
      5.6.2 Evaluation of test results
      5.6.3 Reports
6 Actions in the event of non-conformity
  6.1 Actions to be taken by the manufacturer
  6.2 Actions to be taken by the certification body
      6.2.1 Following surveillance, assessment and acceptance
            of the production control and evaluation of the
            results of autocontrol testing
      6.2.2 Following evaluation of the results of the audit
            testing of samples taken at the factory/depot
7 Procedure for third party certification of conformity
8 Certificates of conformity and conformity mark
9 Requirements for dispatching centres
  9.1 General requirements
  9.2 Tasks for the intermediary
      9.2.1 Measures to maintain the ground granulated
            blastfurnace slag quality
      9.2.2 Confirmation autocontrol testing of samples
            taken at the dispatching centre
  9.3 Tasks for the third party
      9.3.1 Surveillance, assessment and acceptance of the
            measures to maintain the ground granulated
            blastfurnace slag quality and of the confirmation
            autocontrol
      9.3.2 Audit testing of samples taken at the dispatching
            centre
      9.3.3 Decisions to be taken
Annex A (normative) - Evaluation of the representativeness and
                      the accuracy of the 28 day activity index
                      test results
        A.1 General
        A.2 Sets of results considered
        A.3 Evaluation procedure
            A.3.1 Introduction
            A.3.2 Symbols
            A.3.3 Evaluation of whether set A and set B belong
                  to the same population (sampling error check)
            A.3.4 Comparison between set B and set C in order to
                  check the accuracy of the autocontrol testing
                  (testing error check)
Bibliography

Describes the scheme for the evaluation of conformity of ground granulated blastfurnace slag according to EN 15167-1.

DocumentType
Standard
Pages
28
PublisherName
National Standards Authority of Ireland
Status
Current

EN 196-7:2007 Methods of testing cement - Part 7: Methods of taking and preparing samples of cement
ISO 2854:1976 Statistical interpretation of data — Techniques of estimation and tests relating to means and variances
EN 45011:1998 General requirements for bodies operating product certification systems (ISO/IEC Guide 65:1996)
EN 196-1:2016 Methods of testing cement - Part 1: Determination of strength
EN ISO 9001:2015 Quality management systems - Requirements (ISO 9001:2015)
EN 45020:2006 Standardization and related activities - General vocabulary (ISO/IEC Guide 2:2004)
ISO 9001:2015 Quality management systems — Requirements
EN 15167-1:2006 Ground granulated blast furnace slag for use in concrete, mortar and grout - Part 1: Definitions, specifications and conformity criteria
ISO 9000:2015 Quality management systems — Fundamentals and vocabulary
ISO/IEC Guide 2:2004 Standardization and related activities — General vocabulary
ISO/IEC Guide 65:1996 General requirements for bodies operating product certification systems
EN ISO 9000:2015 Quality management systems - Fundamentals and vocabulary (ISO 9000:2015)

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.