EN ISO 14731:2006
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Welding coordination - Tasks and responsibilities (ISO 14731:2006)
01-10-2006
03-04-2019
Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Tasks and responsibilities
4.1 Quality-related tasks
4.2 Specification of tasks and responsibilities
5 Job description
5.1 General
5.2 Tasks
5.3 Responsibilities
6 Technical knowledge
6.1 General knowledge requirements of all welding
coordination personnel
6.2 Specific knowledge requirements of responsible
welding coordination personnel
Annex A (informative) Recommendations for technical
knowledge in welding
Annex B (normative) Essential welding-related tasks
in accordance with ISO 3834 to be
considered when appropriate
Bibliography
ISO 14731:2006 identifies the quality-related responsibilities and tasks included in the coordination of welding-related activities.In any manufacturing organization, welding coordination can be undertaken by one or a number of persons.Welding coordination requirements can be specified by a manufacturer, a contract or an application standard.
| Committee |
CEN/TC 121
|
| DevelopmentNote |
Supersedes EN 719. (11/2006)
|
| DocumentType |
Standard
|
| PublisherName |
Comite Europeen de Normalisation
|
| Status |
Superseded
|
| SupersededBy | |
| Supersedes |
| Standards | Relationship |
| ONORM EN ISO 14731 : 2007 | Identical |
| I.S. EN ISO 14731:2006 | Identical |
| NS EN ISO 14731 : 1ED 2007 | Identical |
| ISO 14731:2019 | Identical |
| BS EN ISO 14731:2019 | Identical |
| DIN EN ISO 14731:2006-12 | Identical |
| NBN EN ISO 14731 : 2007 | Identical |
| NF EN ISO 14731 : 2007 | Identical |
| PN EN ISO 14731 : 2019-05 | Identical |
| BS EN ISO 14731:2006 | Identical |
| ISO 14731:2006 | Identical |
| I.S. EN ISO 14731:2019 | Identical |
| NEN EN ISO 14731 : 2006 | Identical |
| PN EN ISO 14731 : 2008 | Identical |
| UNE-EN ISO 14731:2008 | Identical |
| BS EN 4677-001:2012 | Aerospace series. Welded and brazed assemblies for aerospace construction. Joints of metallic materials by electron beam welding Quality of welded assemblies |
| 08/30184309 DC : DRAFT SEP 2008 | BS EN 12952-5 - WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 5: WORKMANSHIP AND CONSTRUCTION OF PRESSURE PARTS OF THE BOILER |
| 09/30211880 DC : 0 | BS EN 12732 - GAS INFRASTRUCTURE - WELDING STEEL PIPEWORK - FUNCTIONAL REQUIREMENTS |
| 11/30246678 DC : 0 | BS EN 13480-4 - METALLIC INDUSTRIAL PIPING - PART 4: FABRICATION AND INSTALLATION |
| 09/30202307 DC : 0 | BS EN 12514-1 - PARTS FOR SUPPLY SYSTEMS FOR CONSUMING UNITS WITH LIQUID FUELS - PART 1: SAFETY REQUIREMENTS AND TESTS - TERMINOLOGY, GENERAL REQUIREMENTS |
| EN 12972:2015 | Tanks for transport of dangerous goods - Testing, inspection and marking of metallic tanks |
| 15/30320416 DC : 0 | BS EN 1090-2 - EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 2: TECHNICAL REQUIREMENTS FOR STEEL STRUCTURES |
| ONORM EN 1090-3 : 2008 | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 3: TECHNICAL REQUIREMENTS FOR ALUMINIUM STRUCTURES |
| DIN EN 15085-2:2008-01 | RAILWAY APPLICATIONS - WELDING OF RAILWAY VEHICLES AND COMPONENTS - PART 2: QUALITY REQUIREMENTS AND CERTIFICATION OF WELDING MANUFACTURER |
| DIN EN 12732:2014-07 | Gas infrastructure - Welding steel pipework - Functional requirements (includes Amendment A1:2014) |
| DIN EN 15085-5:2008-01 | Railway applications - Welding of railway vehicles and components - Part 5: Inspection, testing and documentation |
| DIN EN 12972:2015-04 | TANKS FOR TRANSPORT OF DANGEROUS GOODS - TESTING, INSPECTION AND MARKING OF METALLIC TANKS |
| BS EN 4678:2011 | Aerospace series. Weldments and brazements for aerospace structures. Joints of metallic materials by laser beam welding. Quality of weldments |
| 13/30280057 DC : 0 | BS EN 13782 - TEMPORARY STRUCTURE - TENTS - SAFETY |
| EN 12952-5:2011 | Water-tube boilers and auxiliary installations - Part 5: Workmanship and construction of pressure parts of the boiler |
| EN 1247:2004+A1:2010 | Foundry machinery - Safety requirements for ladles, pouring equipment, centrifugal casting machines, continuous and semi continuous casting machines |
| EN 1090-1:2009+A1:2011 | Execution of steel structures and aluminium structures - Part 1: Requirements for conformity assessment of structural components |
| DIN EN 1090-2:2011-10 | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 2: TECHNICAL REQUIREMENTS FOR STEEL STRUCTURES |
| EN 1011-1:2009 | Welding - Recommendations for welding of metallic materials - Part 1: General guidance for arc welding |
| EN 13480-4:2017 | Metallic industrial piping - Part 4: Fabrication and installation |
| EN 13110:2012+A1:2017 | LPG equipment and accessories - Transportable refillable welded aluminium cylinders for liquefied petroleum gas (LPG) - Design and construction |
| I.S. EN 15085-5:2007 | RAILWAY APPLICATIONS - WELDING OF RAILWAY VEHICLES AND COMPONENTS - PART 5: INSPECTION, TESTING AND DOCUMENTATION |
| I.S. EN 1090-3:2008 | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 3: TECHNICAL REQUIREMENTS FOR ALUMINIUM STRUCTURES |
| PREN 1090-3 : DRAFT 2017 | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 3: TECHNICAL REQUIREMENTS FOR ALUMINIUM STRUCTURES |
| BS EN 1090-1 : 2009 | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 1: REQUIREMENTS FOR CONFORMITY ASSESSMENT OF STRUCTURAL COMPONENTS |
| 09/30209028 DC : 0 | BS EN 131-2 - LADDERS - PART 2: REQUIREMENTS, TESTING, MARKING |
| PREN 12732 : DRAFT 2009 | GAS INFRASTRUCTURE - WELDING STEEL PIPEWORK - FUNCTIONAL REQUIREMENTS |
| PREN 12953-4 : DRAFT 2017 | SHELL BOILERS - PART 4: WORKMANSHIP AND CONSTRUCTION OF PRESSURE PARTS OF THE BOILER |
| PREN 13480-4 : DRAFT 2011 | METALLIC INDUSTRIAL PIPING - PART 4: FABRICATION AND INSTALLATION |
| 17/30348961 DC : 0 | BS EN 12953-4 - SHELL BOILERS - PART 4: WORKMANSHIP AND CONSTRUCTION OF PRESSURE PARTS OF THE BOILER |
| PREN 1090-2 : DRAFT 2015 | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 2: TECHNICAL REQUIREMENTS FOR STEEL STRUCTURES |
| 09/30180290 DC : 0 | BS EN 1247:2004/A1 - FOUNDRY MACHINERY - SAFETY REQUIREMENTS FOR LADLES, POURING EQUIPMENT, CENTRIFUGAL CASTING MACHINES, CONTINUOUS AND SEMI CONTINUOUS CASTING MACHINES |
| DIN EN 1090-3:2008-09 | EXECUTION OF STEEL AND ALUMINIUM STRUCTURES - PART 3: TECHNICAL RULES FOR EXECUTION OF ALUMINIUM STRUCTURES |
| I.S. EN 4677-001:2012 | AEROSPACE SERIES - WELDED AND BRAZED ASSEMBLIES FOR AEROSPACE CONSTRUCTION - JOINTS OF METALLIC MATERIALS BY ELECTRON BEAM WELDING - PART 001: QUALITY OF WELDED ASSEMBLIES |
| 16/30328759 DC : 0 | BS EN 13814-1 - SAFETY OF AMUSEMENT RIDES AND AMUSEMENT DEVICES - PART 1: DESIGN AND MANUFACTURE |
| PREN 131-2 : DRAFT 2009 | LADDERS - PART 2: REQUIREMENTS, TESTING, MARKING |
| DIN EN 1090-2:2015-07 (Draft) | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 2: TECHNICAL REQUIREMENTS FOR STEEL STRUCTURES |
| I.S. EN 13110:2012 | LPG EQUIPMENT AND ACCESSORIES - TRANSPORTABLE REFILLABLE WELDED ALUMINIUM CYLINDERS FOR LIQUEFIED PETROLEUM GAS (LPG) - DESIGN AND CONSTRUCTION |
| EN 13445-4 : 2014 COR 2017 | UNFIRED PRESSURE VESSELS - PART 4: FABRICATION |
| DIN EN 1011-1:2009-07 | WELDING - RECOMMENDATIONS FOR WELDING OF METALLIC MATERIALS - PART 1: GENERAL GUIDANCE FOR ARC WELDING |
| I.S. EN 131-2:2010 | LADDERS - PART 2: REQUIREMENTS, TESTING, MARKING |
| DIN EN 13084-1:2007-05 | Free-standing chimneys - Part 1: General requirements |
| I.S. EN 1011-1:2009 | WELDING - RECOMMENDATIONS FOR WELDING OF METALLIC MATERIALS - PART 1: GENERAL GUIDANCE FOR ARC WELDING |
| I.S. EN 13480-4:2017 | METALLIC INDUSTRIAL PIPING - PART 4: FABRICATION AND INSTALLATION |
| I.S. EN 12732:2013 | GAS INFRASTRUCTURE - WELDING STEEL PIPEWORK - FUNCTIONAL REQUIREMENTS |
| DIN EN 13110:2017-05 | LPG EQUIPMENT AND ACCESSORIES - TRANSPORTABLE REFILLABLE WELDED ALUMINIUM CYLINDERS FOR LIQUEFIED PETROLEUM GAS (LPG) - DESIGN AND CONSTRUCTION |
| I.S. EN 13941:2009 | DESIGN AND INSTALLATION OF PREINSULATED BONDED PIPE SYSTEMS FOR DISTRICT HEATING |
| I.S. EN 1247:2004 | FOUNDRY MACHINERY - SAFETY REQUIREMENTS FOR LADLES, POURING EQUIPMENT, CENTRIFUGAL CASTING MACHINES, CONTINUOUS AND SEMI CONTINUOUS CASTING MACHINES |
| I.S. EN 13084-1:2007 | FREE-STANDING CHIMNEYS - PART 1: GENERAL REQUIREMENTS |
| I.S. EN 12952-5:2011 | WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 5: WORKMANSHIP AND CONSTRUCTION OF PRESSURE PARTS OF THE BOILER |
| DIN EN 12732:2000-09 | GAS INFRASTRUCTURE - WELDING STEEL PIPEWORK - FUNCTIONAL REQUIREMENTS |
| 09/30186448 DC : 0 | BS EN 13941 - DESIGN AND INSTALLATION OF REINSULATED BONDED PIPE SYSTEMS FOR DISTRICT HEATING |
| 07/30158903 DC : 0 | BS EN 1011-1 - WELDING - RECOMMENDATIONS FOR WELDING OF METALLIC MATERIALS - PART 1: GENERAL GUIDANCE FOR ARC WELDING |
| 16/30342040 DC : 0 | BS EN 13941-2 - DISTRICT HEATING PIPES - DESIGN AND INSTALLATION OF THERMAL INSULATED BONDED SINGLE AND TWIN PIPE SYSTEMS FOR DIRECTLY BURIED HOT WATER NETWORKS - PART 2: INSTALLATION |
| PREN 13941 : DRAFT 2009 | DESIGN AND INSTALLATION OF REINSULATED BONDED PIPE SYSTEMS FOR DISTRICT HEATING |
| PREN 4677-001 : 200P1 | AEROSPACE SERIES - WELDED AND BRAZED ASSEMBLIES FOR AEROSPACE CONSTRUCTION - JOINTS OF METALLIC MATERIALS BY ELECTRON BEAM WELDING - PART 001: QUALITY OF WELDED ASSEMBLIES |
| I.S. EN 12953-4:2002 | SHELL BOILERS - PART 4: WORKMANSHIP AND CONSTRUCTION OF PRESSURE PARTS OF THE BOILER |
| I.S. EN 12972:2015 | TANKS FOR TRANSPORT OF DANGEROUS GOODS - TESTING, INSPECTION AND MARKING OF METALLIC TANKS |
| EN 1090-2:2008+A1:2011 | Execution of steel structures and aluminium structures - Part 2: Technical requirements for steel structures |
| EN 1090-3:2008 | Execution of steel structures and aluminium structures - Part 3: Technical requirements for aluminium structures |
| BS EN 1090-2 : 2008 | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 2: TECHNICAL REQUIREMENTS FOR STEEL STRUCTURES |
| DIN EN 1247:2010-12 | Foundry machinery - Safety requirements for ladles, pouring equipment, centrifugal casting machines, continuous and semi continous casting machines (includes Amendment A1:2010) |
| DIN EN 13110:2012-07 | LPG EQUIPMENT AND ACCESSORIES - TRANSPORTABLE REFILLABLE WELDED ALUMINIUM CYLINDERS FOR LIQUEFIED PETROLEUM GAS (LPG) - DESIGN AND CONSTRUCTION |
| BS EN 12972:2015 | Tanks for transport of dangerous goods. Testing, inspection and marking of metallic tanks |
| BS EN 15085-2:2007 | Railway applications. Welding of railway vehicles and components Quality requirements and certification of welding manufacturer |
| BS EN 15085-5:2007 | Railway applications. Welding of railway vehicles and components Inspection, testing and documentation |
| I.S. EN 15085-2:2007 | RAILWAY APPLICATIONS - WELDING OF RAILWAY VEHICLES AND COMPONENTS - PART 2: QUALITY REQUIREMENTS AND CERTIFICATION OF WELDING MANUFACTURER |
| EEMUA 158 : 2014 | CONSTRUCTION SPECIFICATION FOR FIXED OFFSHORE STRUCTURES |
| EN 15085-2:2007 | Railway applications - Welding of railway vehicles and components - Part 2: Quality requirements and certification of welding manufacturer |
| BS EN 1247 : 2004 | FOUNDRY MACHINERY - SAFETY REQUIREMENTS FOR LADLES, POURING EQUIPMENT, CENTRIFUGAL CASTING MACHINES, CONTINUOUS AND SEMI CONTINUOUS CASTING MACHINES |
| EEMUA 143 : 1985 | RECOMMENDATIONS FOR TUBE END WELDING |
| PREN 12972 : DRAFT 2017 | TANKS FOR TRANSPORT OF DANGEROUS GOODS - TESTING, INSPECTION AND MARKING OF METALLIC TANKS |
| NF EN 1090-2 : 2009 + A1 2011 | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 2: TECHNICAL REQUIREMENTS FOR STEEL STRUCTURES |
| 17/30360691 DC : 0 | BS EN 12972 - TANKS FOR TRANSPORT OF DANGEROUS GOODS - TESTING, INSPECTION AND MARKING OF METALLIC TANKS |
| 17/30348949 DC : 0 | BS EN 1090-3 - EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 3: TECHNICAL REQUIREMENTS FOR ALUMINIUM STRUCTURES |
| BS EN 131-2 : 2010 | LADDERS - PART 2: REQUIREMENTS, TESTING, MARKING |
| BS EN 12952-5:2011 | Water-tube boilers and auxiliary installations Workmanship and construction of pressure parts of the boiler |
| BS EN 13480-4:2017 | Metallic industrial piping Fabrication and installation |
| BS EN 1011-1:2009 | Welding. Recommendations for welding of metallic materials General guidance for arc welding |
| BS EN 12732 : 2013 | GAS INFRASTRUCTURE - WELDING STEEL PIPEWORK - FUNCTIONAL REQUIREMENTS |
| BS EN 13941 : 2009 | DESIGN AND INSTALLATION OF PREINSULATED BONDED PIPE SYSTEMS FOR DISTRICT HEATING |
| BS EN 13084-1:2007 | Free-standing chimneys General requirements |
| EN 13941:2009+A1:2010 | Design and installation of preinsulated bonded pipe systems for district heating |
| EN 4678:2011 | Aerospace series - Weldments and brazements for aerospace structures - Joints of metallic materials by laser beam welding - Quality of weldments |
| EN 4677-001:2012 | Aerospace series - Welded and brazed assemblies for aerospace construction - Joints of metallic materials by electron beam welding - Part 001: Quality of welded assemblies |
| EN 15085-5:2007 | Railway applications - Welding of railway vehicles and components - Part 5: Inspection, testing and documentation |
| I.S. EN 1090-1:2009 | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 1: REQUIREMENTS FOR CONFORMITY ASSESSMENT OF STRUCTURAL COMPONENTS |
| KTA 3205.2 : 2015 COR 2016 | COMPONENT SUPPORT STRUCTURES WITH NON-INTEGRAL CONNECTIONS - PART 2: COMPONENT SUPPORT STRUCTURES WITH NON-INTEGRAL CONNECTIONS FOR PRESSURE AND ACTIVITY-RETAINING COMPONENTS IN SYSTEMS OUTSIDE THE PRIMARY CIRCUIT |
| I.S. EN 1090-2:2008 | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 2: TECHNICAL REQUIREMENTS FOR STEEL STRUCTURES |
| NF EN 1090-1 : 2009 + A1 2012 | EXECUTION OF STEEL STRUCTURES AND ALUMINIUM STRUCTURES - PART 1: REQUIREMENTS FOR CONFORMITY ASSESSMENT OF STRUCTURAL COMPONENTS |
| BS EN 1090-3:2008 | Execution of steel structures and aluminium structures Technical requirements for aluminium structures |
| EN 12953-4:2018 | Shell boilers - Part 4: Workmanship and construction of pressure parts of the boiler |
| I.S. EN 4678:2011 | AEROSPACE SERIES - WELDMENTS AND BRAZEMENTS FOR AEROSPACE STRUCTURES - JOINTS OF METALLIC MATERIALS BY LASER BEAM WELDING - QUALITY OF WELDMENTS |
| DIN EN 12952-5:2012-01 | Water-tube boilers and auxiliary installations - Part 5: Workmanship and construction of pressure parts of the boiler |
| BS EN 13445-4 : 2014 | UNFIRED PRESSURE VESSELS - PART 4: FABRICATION |
| BS EN 13110 : 2012 | LPG EQUIPMENT AND ACCESSORIES - TRANSPORTABLE REFILLABLE WELDED ALUMINIUM CYLINDERS FOR LIQUEFIED PETROLEUM GAS (LPG) - DESIGN AND CONSTRUCTION |
| EN 13084-1:2007 | Free-standing chimneys - Part 1: General requirements |
| EN 131-2:2010+A2:2017 | Ladders - Part 2: Requirements, testing, marking |
| DIN EN 1090-1:2012-02 | Execution of steel structures and aluminium structures - Part 1: Requirements for conformity assessment of structural components (includes Amendment A1:2011) |
| EN 12732:2013+A1:2014 | Gas infrastructure - Welding steel pipework - Functional requirements |
| UNE-EN 1090-1:2011 | Execution of steel structures and aluminium structures - Part 1: Requirements for conformity assessment of structural components |
| UNE-EN 13110:2012+A1:2017 | LPG equipment and accessories - Transportable refillable welded aluminium cylinders for liquefied petroleum gas (LPG) - Design and construction |
| UNE-EN 12952-5:2012 | Water-tube boilers and auxiliary installations - Part 5: Workmanship and construction of pressure parts of the boiler |
| UNE-EN 12732:2014 | Gas infrastructure - Welding steel pipework - Functional requirements |
| UNE-EN 13445-4:2015 | Unfired pressure vessels - Part 4: Fabrication |
| UNE-EN 12972:2015 | Tanks for transport of dangerous goods - Testing, inspection and marking of metallic tanks |
| UNE-EN 13480-4:2017 | Metallic industrial piping - Part 4: Fabrication and installation |
| UNE-EN 1090-2:2011 | Execution of steel structures and aluminium structures - Part 2: Technical requirements for steel structures |
| UNE-EN 1090-3:2011 | Execution of steel structures and aluminium structures - Part 3: Technical requirements for aluminium structures |
| UNE-EN 12732:2014+A1:2014 | Gas infrastructure - Welding steel pipework - Functional requirements |
| UNE-EN 1247:2005 | Foundry machinery - Safety requirements for ladles, pouring equipment, centrifugal casting machines, continuous and semi continous casting machines |
| UNE-EN 13110:2012 | LPG equipment and accessories - Transportable refillable welded aluminium cylinders for liquefied petroleum gas (LPG) - Design and construction |
| ISO 3834-1:2005 | Quality requirements for fusion welding of metallic materials — Part 1: Criteria for the selection of the appropriate level of quality requirements |
| ISO 3834-4:2005 | Quality requirements for fusion welding of metallic materials — Part 4: Elementary quality requirements |
| ISO 3834-2:2005 | Quality requirements for fusion welding of metallic materials — Part 2: Comprehensive quality requirements |
| ISO 3834-5:2015 | Quality requirements for fusion welding of metallic materials — Part 5: Documents with which it is necessary to conform to claim conformity to the quality requirements of ISO 3834-2, ISO 3834-3 or ISO 3834-4 |
| ISO 3834-3:2005 | Quality requirements for fusion welding of metallic materials — Part 3: Standard quality requirements |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.