EN 61850-4:2011
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Communication networks and systems for power utility automation - Part 4: System and project management
08-01-2021
10-06-2011
FOREWORD
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviations
5 Engineering requirements
6 System life cycle
7 Quality assurance
Annex A (informative) - Announcement of discontinuation
(example)
Annex B (informative) - Delivery obligations after
discontinuation (example)
Bibliography
Annex ZA (normative) - Normative references to international
publications with their corresponding European
publications
IEC 61850-4:2011 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like e.g. substation automation systems (SAS). It defines the system and project management for UAS systems with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements. This second edition constitutes a technical revision to align the document more closely with the other parts of the IEC 61850 series, in addition to enlarging the scope from substation automation systems to all utility automation systems. This publication is of core relevance for Smart Grid.
Committee |
CLC/TC 57
|
DocumentType |
Standard
|
PublisherName |
European Committee for Standards - Electrical
|
Status |
Superseded
|
SupersededBy |
Standards | Relationship |
IEC 61850-4:2011 | Identical |
I.S. EN 61850-4:2011 | Identical |
UNE-EN 61850-4:2011 | Identical |
CEI EN 61850-4 : 2012 | Identical |
NEN EN IEC 61850-4 : 2011 | Identical |
BS EN 61850-4:2011 | Identical |
NBN EN 61850-4 : 2011 | Identical |
NF EN 61850-4 : 2011 | Identical |
DIN EN 61850-4:2012-04 | Identical |
PN EN 61850-4 : 2011 | Identical |
PNE-FprEN 61850-4 | Identical |
BS EN 63024:2018 | Identical |
EN 61400-25-5:2017 | Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing |
EN 61850-10:2013 | Communication networks and systems for power utility automation - Part 10: Conformance testing |
EN 62271-3:2015 | High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850 |
I.S. EN 62271-3:2015 | HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850 |
BS EN 62271-3:2015 | High-voltage switchgear and controlgear Digital interfaces based on IEC 61850 |
BS EN 61850-7-1:2011 | Communication networks and systems for power utility automation Basic communication structure. Principles and models |
BS EN 61400-25-5:2017 | Wind energy generation systems Communications for monitoring and control of wind power plants. Compliance testing |
EN 61850-7-1:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011) |
CEI EN 61850-7-1 : 2012 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS |
BS EN 61850-10:2013 | Communication networks and systems for power utility automation Conformance testing |
I.S. EN 61400-25-5:2017 | WIND ENERGY GENERATION SYSTEMS - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - COMPLIANCE TESTING |
I.S. EN 61850-7-1:2011 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011 (EQV)) |
I.S. EN 61850-10:2013 | COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 10: CONFORMANCE TESTING (IEC 61850-10:2012 (EQV)) |
EN 81346-2 : 2009 | INDUSTRIAL SYSTEMS, INSTALLATIONS AND EQUIPMENT AND INDUSTRIAL PRODUCTS - STRUCTURING PRINCIPLES AND REFERENCE DESIGNATIONS - PART 2: CLASSIFICATION OF OBJECTS AND CODES FOR CLASSES |
EN 61850-6:2010 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
IEC 61175:2005 | Industrial systems, installations and equipment and industrial products - Designation of signals |
IEC 61850-6:2009 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
IEC 81346-1:2009 | Industrial systems, installations and equipment and industrial products - Structuring principles and reference designations - Part 1: Basic rules |
IEC 81346-2:2009 | Industrial systems, installations and equipment and industrial products - Structuring principles and reference designations - Part 2: Classification of objects and codes for classes |
EN 60848:2013 | GRAFCET specification language for sequential function charts |
IEC 60848:2013 | GRAFCET specification language for sequential function charts |
ISO 9001:2015 | Quality management systems — Requirements |
EN 81346-1:2009 | Industrial systems, installations and equipment and industrial products - Structuring principles and reference designations - Part 1: Basic rules |
IEC 61850-10:2012 | Communication networks and systems for power utility automation - Part 10: Conformance testing |
EN 61175:2005 | Industrial systems, installations and equipment and industrial products - Designation of signals |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.