EN 60953-1:1995

Current

Current

The latest, up-to-date edition.

Rules for steam turbine thermal acceptance tests - Part 1: Method A - High accuracy for large condensing steam turbines

Published date

15-12-1995

Sorry this product is not available in your region.

FOREWORD
PREFACE
INTRODUCTION
1 Scope and object
  1.1 Scope
  1.2 Object
  1.3 Matters to be considered in the contract
2 Units, symbols, terms and definitions
  2.1 General
  2.2 Symbols, units
  2.3 Subscripts, superscripts and definitions
  2.4 Definition of guarantee values and test results
3 Guiding principles
  3.1 Advance planning for test
  3.2 Preparatory agreements and arrangements for tests
  3.3 Planning of the tests
  3.4 Preparation of the tests
  3.5 Comparison measurements
  3.6 Settings for tests
  3.7 Preliminary tests
  3.8 Acceptance tests
  3.9 Repetition of acceptance tests
4 Measuring techniques and measuring instruments
  4.1 General
  4.2 Measurement of power
  4.3 Flow measurement
  4.4 Pressure measurement (excluding condensing turbine
      exhaust pressure)
  4.5 Condensing turbine exhaust pressure measurement
  4.6 Temperature measurement
  4.7 Steam quality measurement
  4.8 Time measurement
  4.9 Speed measurement
5 Evaluation of tests
  5.1 Preparation of evaluation
  5.2 Computation of results
6 Correction of test results and comparison with
  guarantee
  6.1 Guarantee values and guarantee conditions
  6.2 Correction of initial steam flow capacity
  6.3 Correction of maximum output
  6.4 Correction of thermal and thermodynamic efficiency
  6.5 Definition and application of correction values
  6.6 Correction methods
  6.7 Variables to be considered in the correction
  6.8 Guarantee comparison
Appendix A Feedwater heater leakage and condenser leakage
           tests
Appendix B Throat tap nozzle
Appendix C The use of flow straighteners in fluid
           flow measurements
Annex ZA (normative) Normative references to international
                     publications with their corresponding
                     European publications

Specifies very accurate testing of steam turbines to obtain the level of performance with minimum measuring uncertainty. Defines uniform rules for preparing and carrying out an evaluation of the acceptance tests. Defines also the conditions under which the acceptance tests shall take place. The cost for conducting this test method will generally be justified economically for large and/or proptotype units.

Committee
CLC/SR 5
DocumentType
Standard
PublisherName
European Committee for Standards - Electrical
Status
Current

Standards Relationship
IEC 60953-1:1990 Identical
NF EN 60953-1 : 2002 Identical
NBN EN 60953-1 : 1996 Identical
NEN 10953-1 : 1996 Identical
I.S. EN 60953-1:1998 Identical
PN EN 60953-1 : 1999 Identical
SN EN 60953-1 : 1995 Identical
UNE-EN 60953-1:1995 Identical
BS EN 60953-1:1996 Identical
CEI EN 60953-1 : 1996 Identical

BS EN 45510-5-1:1998 Guide for the procurement of power station equipment Steam turbines
CEI EN 60953-3 : 2003 RULES FOR STEAM TURBINE THERMAL ACCEPTANCE TESTS - PART 3: THERMAL PERFORMANCE VERIFICATION TESTS OF RETROFITTED STEAM TURBINES
EN 60953-3:2002 Rules for steam turbine thermal acceptance tests - Part 3: Thermal performance verification tests of retrofitted steam turbines
EN 45510-5-1:1998 Guide for procurement of power station equipment - Part 5-1: Steam turbines
CEI UNI EN 45510-5-1 : 2000 GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT - PART 5-1: STEAM TURBINES
I.S. EN 60953-3:2002 RULES FOR STEAM TURBINE THERMAL ACCEPTANCE TESTS - PART 3: THERMAL PERFORMANCE VERIFICATION TESTS OF RETROFITTED STEAM TURBINES
BS EN 60953-3:2002 Rules for steam turbine thermal acceptance tests Thermal performance verification tests of retrofitted steam turbines
EN 45510-5-1 : 1998 GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT - PART 5-1: STEAM TURBINES

HD 532 : 200S1 HARD-DRAWN ALUMINIUM WIRE FOR OVERHEAD LINE CONDUCTORS
ISO 5167:1980 Measurement of fluid flow by means of orifice plates, nozzles and Venturi tubes inserted in circular cross-section conduits running full
IEC 60034-2:1972 Rotating electrical machines. Part 2: Methods for determining losses and efficiency of rotating electrical machinery from tests (excluding machines for traction vehicles)

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.