DIN EN 61400-25-5 : 2007
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING
Hardcopy
18-10-2018
English
01-01-2007
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviated terms
5 Introduction to conformance testing
5.1 General
5.2 Conformance test procedures
5.3 Quality assurance and testing
5.4 Testing
5.5 Documentation of conformance test report
6 Device related conformance testing
6.1 General guidelines
6.2 Standard test procedures
6.3 Conformance test procedures
7 Performance tests
7.1 General
7.2 Communications latency
7.3 Time synchronisation and accuracy
7.4 Stability test
Annex A (informative) Examples of test procedure template
Annex ZA (normative) Normative references to international
publications with their corresponding European
publications
Bibliography
Describes standard techniques for testing of conformance of implementations, as well as specific measurement techniques to be applied when declaring performance parameters.
DevelopmentNote |
DRAFT 2017 issued in August 2017. (08/2017)
|
DocumentType |
Standard
|
Pages |
47
|
PublisherName |
Verband Deutscher Elektrotechniker
|
Status |
Superseded
|
Standards | Relationship |
UNE-EN 61400-25-5:2007 | Identical |
IEC 61400-25-5:2017 | Identical |
BS EN 61400-25-5:2007 | Identical |
NBN EN 61400-25-5 : 2007 | Identical |
I.S. EN 61400-25-5:2007 | Identical |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.