DEFSTAN 08-101(PT1)/1(2000) : 2000
Superseded
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
REQUIREMENTS FOR THE CONSTRUCTION AND SYSTEM ARRANGEMENTS IN MAGAZINES AND WEAPON STORAGE COMPARTMENTS - CATEGORY 1 - PART 1: HM SURFACE SHIPS
Superseded date
18-03-2005
Superseded by
Published date
12-01-2013
Publisher
Sorry this product is not available in your region.
DevelopmentNote |
It renumbers DEFSTAN 02-183(PT1)(2000). (01/2001)
|
DocumentType |
Standard
|
PublisherName |
UK Ministry of Defence Standards
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
DEFSTAN 02-53/2(2001) : 2001 | GUIDE TO THE COMPLETION OF FORM DGSF 129- SHORE SUPPORT REQUIREMENTS FOR WARSHIPS |
DEFSTAN 02-102(PT1)/3(2005) : 2005 | REQUIREMENTS FOR AIR-CONDITIONING AND VENTILATION - PART 1: HM SURFACE SHIPS AND ROYAL FLEET AUXILIARIES |
DEFSTAN 02-603/2(2001) : INTERIM | REQUIREMENTS FOR THE POLICY, DESIGN AND INSTALLATION OF FIRE DETECTION SYSTEMS IN SHIPS |
DEFSTAN 02-179/1(2002) : 2002 | REQUIREMENTS FOR LOCKERS (MAGAZINE, RU MAGAZINE AND DETONATOR) USED FOR STORAGE OF EXPLOSIVE STORES IN HM SURFACE SHIPS AND SUBMARINES |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.