DEFSTAN 05-57/4(2000) : 2000
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
CONFIGURATION MANAGEMENT OF DEFENSE MATERIAL
Hardcopy , PDF
17-06-2005
English
01-01-2000
Description
Content
Preface
Main Text
SECTION 1 - GENERAL REQUIREMENTS
0 Introduction
1 Scope
2 Warning
3 Related Documents
4 Definitions and Abbreviations
SECTION 2 - CONFIGURATION MANAGEMENT SYSTEM
5 Configuration Management Requirements
6 Configuration Management and Planning
7 Selection of Configuration Items
8 Configuration Identification and Documentation
9 Configuration Change Management
10 Configuration Status Accounting
11 Configuration Status Record
12 Configuration Audit
SECTION 3 - CONFIGURATION MANAGEMENT RESPONSIBILITIES
13 Under Contractor Control
14 Under Ministry Control
ANNEXES
ANNEX A1 - Definitions
ANNEX A2 - Abbreviations
ANNEX B - Configuration Management Process
ANNEX C - Configuration Management Plan
ANNEX D1 - Example Modification Proposal Form
ANNEX D2 - Information for completion of Example
Modification Proposal Form
ANNEX E - Modification Classification Categories
ANNEX F - Configuration Audits
Applies to all defence material from product concept to disposal. It gives generic CM requirements which may be tailored to suit individual contract/project needs, taking into account the complexity and nature of the work.
DevelopmentNote |
Supersedes DEFSTAN 05-57/3(1993), DEFSTAN 05-57/2(1985) & DEFSTAN 05-57/1(1980) (11/2000)
|
DocumentType |
Standard
|
Pages |
56
|
PublisherName |
UK Ministry of Defence Standards
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
DEFSTAN 05-123(PT0)/2(2004) : 2004 | TECHNICAL PROCEDURES FOR THE PROCUREMENT OF AIRCRAFT, WEAPONS AND ELECTRONIC SYSTEMS - PART 0: GENERAL INFORMATION & INDEX TO ALL PARTS OF DEF STAN 05-123 |
DEFSTAN 00-55(PT2)/2(1997) : 1997 ERRATUM 1997 | REQUIREMENTS FOR SAFETY RELATED SOFTWARE IN DEFENCE EQUIPMENT - PART 2: GUIDANCE |
DEFSTAN 05-61(PT13)/1(1994) : 1994 | QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 13: ACCEPTANCE PROCEDURES FOR PROOF EQUIPMENT |
DEFSTAN 21-13(PT2)/1(2000) : 2000 | COMBAT SYSTEM INTERFACE AND LINK DOCUMENTATION - PART 2: INTERFACE DOCUMENTATION |
DEFSTAN 00-55(PT1)/2(1997) : 1997 | REQUIREMENTS FOR SAFETY RELATED SOFTWARE IN DEFENCE EQUIPMENT - PART 1: REQUIREMENTS |
DEFSTAN 00-970(PT0)/6(2010) : 2010 | DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS |
DEFSTAN 00-25(PT15)/1(2004) : 2004 | HUMAN FACTORS FOR DESIGNERS OF SYSTEMS - PART 15: PRINCIPLES AND PROCESS |
DEFSTAN 00-60(PT2)/5(2002) : 2002 | INTEGRATED LOGISTIC SUPPORT GUIDE TO THE APPLICATION OF LSA AND LSAR |
DEFSTAN 00-60(PT20)/6(2002) : 2002 | INTEGRATED LOGISTIC SUPPORT - PART 20: APPLICATION OF INTEGRATED SUPPLY SUPPORT PROCEDURES |
DEFSTAN 00-60(PT22)/4(2003) : 2003 | INTEGRATED LOGISTIC SUPPORT PROCEDURES FOR CODIFICATION |
DEFSTAN 00-60(PT0)/4(2000) : 2000 | INTEGRATED LOGISTIC SUPPORT PART 0: APPLICATION OF INTEGRATED LOGISTIC SUPPORT (ILS) |
DEFSTAN 00-60(PT3)/2(1998) : 1998 | INTEGRATED LOGISTIC SUPPORT - PART 3: GUIDANCE FOR APPLICATION SOFTWARE SUPPORT |
DEFSTAN 00-970(PT0)/7(2011) : 2011 | DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS |
DEFSTAN 00-60(PT0)/5(2002) : 2002 CORR 2004 | INTEGRATED LOGISTIC SUPPORT - PART 0: APPLICATION OF INTEGRATED LOGISTIC SUPPORT (ILS) |
DEFSTAN 00-60(PT21)/5(2002) : 2002 | INTEGRATED LOGISTIC SUPPORT - PART 21: PROCEDURES FOR INITIAL PROVISIONING |
DEFSTAN 00-60(PT0)/6(2004) : 2004 | INTEGRATED LOGISTIC SUPPORT - PART 0: APPLICATION OF INTEGRATED LOGISTIC SUPPORT (ILS) |
DEFSTAN 00-60(PT25)/2(1998) : 1998 | INTEGRATED LOGISTIC SUPPORT - PART 25: PROCEDURES FOR INVOICING |
DEFSTAN 00-60(PT24)/4(2000) : 2000 | INTEGRATED LOGISTIC SUPPORT PART 24: PROCEDURES FOR ORDER ADMINISTRATION |
DEFSTAN 00-60(PT23)/2(1998) : 1998 | INTEGRATED LOGISTIC SUPPORT - PART 23: PROCEDURES FOR PROCUREMENT PLANNING |
DEFSTAN 00-60(PT1)/2(1998) : 1998 | INTEGRATED LOGISTIC SUPPORT - PART 1: LOGISTIC SUPPORT ANALYSIS (LSA) AND LOGISTIC SUPPORT ANALYSIS RECORD (LSAR) |
DEFSTAN 00-60(PT21)/4(2000) : 2000 | INTEGRATED LOGISTIC SUPPORT PART 21: PROCEDURES FOR INITIAL PROVISIONING |
DEFSTAN 05-10/4(1990) : 1990 | DRAWING PROCEDURE |
DEFSTAN 23-6/3(2000) : 2000 | GUIDE TO THE COMMON TECHNICAL REQUIREMENTS FOR MILITARY LOGISTIC VEHICLES AND TOWED EQUIPMENT |
DEFSTAN 00-60(PT24)/5(2002) : 2002 | INTEGRATED LOGISTIC SUPPORT - PART 24: PROCEDURES FOR ORDER ADMINISTRATION |
DEFSTAN 00-970(PT0)/5(2007) : 2007 | DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS |
DEFSTAN 21-13(PT3)/1(2000) : 2000 | COMBAT SYSTEM INTERFACE AND LINK DOCUMENTATION - PART 3: LINK DOCUMENT GUIDE |
DEFSTAN 05-95/3(1995) : 1995 | QUALITY SYSTEM REQUIREMENTS FOR THE DESIGN, DEVELOPMENT, SUPPLY AND MAINTENANCE OF SOFTWARE |
DEFSTAN 00-56(PT1)/2(1996) : 1996 | SAFETY MANAGEMENT REQUIREMENTS FOR DEFENCE SYSTEMS - PART 1: REQUIREMENTS |
DEFSTAN 00-25(PT12)/1(1989) : 1989 | HUMAN FACTORS FOR DESIGNERS OF EQUIPMENT - PART 12: SYSTEMS |
DEFSTAN 00-56(PT2)/3(2004) : INTERIM | SAFETY MANAGEMENT REQUIREMENTS FOR DEFENCE SYSTEMS - PART 2: GUIDANCE ON ESTABLISHING A MEANS OF COMPLYING WITH PART 1 |
DEFSTAN 21-13(PT1)/1(2000) : 2000 | COMBAT SYSTEM INTERFACE AND LINK DOCUMENTATION - PART 1: MANAGEMENT GUIDE |
DEFSTAN 00-42(PT4)/1(2002) : 2002 | RELIABILITY AND MAINTAINABILITY (R&M) ASSURANCE GUIDE - PART 4: TESTABILITY |
DEFSTAN 02-41/2(2000) : 2000 AMD 1 2004 | REQUIREMENTS FOR CONFIGURATION MANAGEMENT OF SURFACE WARSHIPS |
STANAG 4427 : 2014 | CONFIGURATION MANAGEMENT IN SYSTEM LIFE CYCLE MANAGEMENT |
DEFSTAN 05-61(PT1)/3(1998) : 1998 | QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 1: DEVIATION/PRODUCTION PERMITS AND WAIVERS/CONCESSIONS - QUALITY ASSURANCE OF SUBCONTRACT WORK |
DEFSTAN 05-91/2(1995) : 1995 | QUALITY SYSTEM REQUIREMENTS FOR DESIGN/DEVELOPMENT, PRODUCTION, INSTALLATION AND SERVICING |
DEFSTAN 05-10/4(1990) : 1990 | DRAWING PROCEDURE |
ISO/IEC 12207:2008 | Systems and software engineering — Software life cycle processes |
DEFSTAN 05-95/3(1995) : 1995 | QUALITY SYSTEM REQUIREMENTS FOR THE DESIGN, DEVELOPMENT, SUPPLY AND MAINTENANCE OF SOFTWARE |
ISO 10007:2017 | Quality management — Guidelines for configuration management |
STANAG 4159 : 0 | NATO MATERIAL CONFIGURATION MANAGEMENT POLICY AND PROCEDURES FOR MULTINATIONAL JOINT PROJECTS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.