Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

DEFSTAN 05-57/4(2000) : 2000

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

CONFIGURATION MANAGEMENT OF DEFENSE MATERIAL

Available format(s)

Hardcopy , PDF

Superseded date

17-06-2005

Language(s)

English

Published date

01-01-2000

$33.14
Including GST where applicable

Description
Content
Preface
Main Text
SECTION 1 - GENERAL REQUIREMENTS
0 Introduction
1 Scope
2 Warning
3 Related Documents
4 Definitions and Abbreviations
SECTION 2 - CONFIGURATION MANAGEMENT SYSTEM
5 Configuration Management Requirements
6 Configuration Management and Planning
7 Selection of Configuration Items
8 Configuration Identification and Documentation
9 Configuration Change Management
10 Configuration Status Accounting
11 Configuration Status Record
12 Configuration Audit
SECTION 3 - CONFIGURATION MANAGEMENT RESPONSIBILITIES
13 Under Contractor Control
14 Under Ministry Control
ANNEXES
ANNEX A1 - Definitions
ANNEX A2 - Abbreviations
ANNEX B - Configuration Management Process
ANNEX C - Configuration Management Plan
ANNEX D1 - Example Modification Proposal Form
ANNEX D2 - Information for completion of Example
           Modification Proposal Form
ANNEX E - Modification Classification Categories
ANNEX F - Configuration Audits

Applies to all defence material from product concept to disposal. It gives generic CM requirements which may be tailored to suit individual contract/project needs, taking into account the complexity and nature of the work.

DevelopmentNote
Supersedes DEFSTAN 05-57/3(1993), DEFSTAN 05-57/2(1985) & DEFSTAN 05-57/1(1980) (11/2000)
DocumentType
Standard
Pages
56
PublisherName
UK Ministry of Defence Standards
Status
Superseded
SupersededBy
Supersedes

DEFSTAN 05-123(PT0)/2(2004) : 2004 TECHNICAL PROCEDURES FOR THE PROCUREMENT OF AIRCRAFT, WEAPONS AND ELECTRONIC SYSTEMS - PART 0: GENERAL INFORMATION & INDEX TO ALL PARTS OF DEF STAN 05-123
DEFSTAN 00-55(PT2)/2(1997) : 1997 ERRATUM 1997 REQUIREMENTS FOR SAFETY RELATED SOFTWARE IN DEFENCE EQUIPMENT - PART 2: GUIDANCE
DEFSTAN 05-61(PT13)/1(1994) : 1994 QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 13: ACCEPTANCE PROCEDURES FOR PROOF EQUIPMENT
DEFSTAN 21-13(PT2)/1(2000) : 2000 COMBAT SYSTEM INTERFACE AND LINK DOCUMENTATION - PART 2: INTERFACE DOCUMENTATION
DEFSTAN 00-55(PT1)/2(1997) : 1997 REQUIREMENTS FOR SAFETY RELATED SOFTWARE IN DEFENCE EQUIPMENT - PART 1: REQUIREMENTS
DEFSTAN 00-970(PT0)/6(2010) : 2010 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
DEFSTAN 00-25(PT15)/1(2004) : 2004 HUMAN FACTORS FOR DESIGNERS OF SYSTEMS - PART 15: PRINCIPLES AND PROCESS
DEFSTAN 00-60(PT2)/5(2002) : 2002 INTEGRATED LOGISTIC SUPPORT GUIDE TO THE APPLICATION OF LSA AND LSAR
DEFSTAN 00-60(PT20)/6(2002) : 2002 INTEGRATED LOGISTIC SUPPORT - PART 20: APPLICATION OF INTEGRATED SUPPLY SUPPORT PROCEDURES
DEFSTAN 00-60(PT22)/4(2003) : 2003 INTEGRATED LOGISTIC SUPPORT PROCEDURES FOR CODIFICATION
DEFSTAN 00-60(PT0)/4(2000) : 2000 INTEGRATED LOGISTIC SUPPORT PART 0: APPLICATION OF INTEGRATED LOGISTIC SUPPORT (ILS)
DEFSTAN 00-60(PT3)/2(1998) : 1998 INTEGRATED LOGISTIC SUPPORT - PART 3: GUIDANCE FOR APPLICATION SOFTWARE SUPPORT
DEFSTAN 00-970(PT0)/7(2011) : 2011 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
DEFSTAN 00-60(PT0)/5(2002) : 2002 CORR 2004 INTEGRATED LOGISTIC SUPPORT - PART 0: APPLICATION OF INTEGRATED LOGISTIC SUPPORT (ILS)
DEFSTAN 00-60(PT21)/5(2002) : 2002 INTEGRATED LOGISTIC SUPPORT - PART 21: PROCEDURES FOR INITIAL PROVISIONING
DEFSTAN 00-60(PT0)/6(2004) : 2004 INTEGRATED LOGISTIC SUPPORT - PART 0: APPLICATION OF INTEGRATED LOGISTIC SUPPORT (ILS)
DEFSTAN 00-60(PT25)/2(1998) : 1998 INTEGRATED LOGISTIC SUPPORT - PART 25: PROCEDURES FOR INVOICING
DEFSTAN 00-60(PT24)/4(2000) : 2000 INTEGRATED LOGISTIC SUPPORT PART 24: PROCEDURES FOR ORDER ADMINISTRATION
DEFSTAN 00-60(PT23)/2(1998) : 1998 INTEGRATED LOGISTIC SUPPORT - PART 23: PROCEDURES FOR PROCUREMENT PLANNING
DEFSTAN 00-60(PT1)/2(1998) : 1998 INTEGRATED LOGISTIC SUPPORT - PART 1: LOGISTIC SUPPORT ANALYSIS (LSA) AND LOGISTIC SUPPORT ANALYSIS RECORD (LSAR)
DEFSTAN 00-60(PT21)/4(2000) : 2000 INTEGRATED LOGISTIC SUPPORT PART 21: PROCEDURES FOR INITIAL PROVISIONING
DEFSTAN 05-10/4(1990) : 1990 DRAWING PROCEDURE
DEFSTAN 23-6/3(2000) : 2000 GUIDE TO THE COMMON TECHNICAL REQUIREMENTS FOR MILITARY LOGISTIC VEHICLES AND TOWED EQUIPMENT
DEFSTAN 00-60(PT24)/5(2002) : 2002 INTEGRATED LOGISTIC SUPPORT - PART 24: PROCEDURES FOR ORDER ADMINISTRATION
DEFSTAN 00-970(PT0)/5(2007) : 2007 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
DEFSTAN 21-13(PT3)/1(2000) : 2000 COMBAT SYSTEM INTERFACE AND LINK DOCUMENTATION - PART 3: LINK DOCUMENT GUIDE
DEFSTAN 05-95/3(1995) : 1995 QUALITY SYSTEM REQUIREMENTS FOR THE DESIGN, DEVELOPMENT, SUPPLY AND MAINTENANCE OF SOFTWARE
DEFSTAN 00-56(PT1)/2(1996) : 1996 SAFETY MANAGEMENT REQUIREMENTS FOR DEFENCE SYSTEMS - PART 1: REQUIREMENTS
DEFSTAN 00-25(PT12)/1(1989) : 1989 HUMAN FACTORS FOR DESIGNERS OF EQUIPMENT - PART 12: SYSTEMS
DEFSTAN 00-56(PT2)/3(2004) : INTERIM SAFETY MANAGEMENT REQUIREMENTS FOR DEFENCE SYSTEMS - PART 2: GUIDANCE ON ESTABLISHING A MEANS OF COMPLYING WITH PART 1
DEFSTAN 21-13(PT1)/1(2000) : 2000 COMBAT SYSTEM INTERFACE AND LINK DOCUMENTATION - PART 1: MANAGEMENT GUIDE
DEFSTAN 00-42(PT4)/1(2002) : 2002 RELIABILITY AND MAINTAINABILITY (R&M) ASSURANCE GUIDE - PART 4: TESTABILITY
DEFSTAN 02-41/2(2000) : 2000 AMD 1 2004 REQUIREMENTS FOR CONFIGURATION MANAGEMENT OF SURFACE WARSHIPS

STANAG 4427 : 2014 CONFIGURATION MANAGEMENT IN SYSTEM LIFE CYCLE MANAGEMENT
DEFSTAN 05-61(PT1)/3(1998) : 1998 QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 1: DEVIATION/PRODUCTION PERMITS AND WAIVERS/CONCESSIONS - QUALITY ASSURANCE OF SUBCONTRACT WORK
DEFSTAN 05-91/2(1995) : 1995 QUALITY SYSTEM REQUIREMENTS FOR DESIGN/DEVELOPMENT, PRODUCTION, INSTALLATION AND SERVICING
DEFSTAN 05-10/4(1990) : 1990 DRAWING PROCEDURE
ISO/IEC 12207:2008 Systems and software engineering — Software life cycle processes
DEFSTAN 05-95/3(1995) : 1995 QUALITY SYSTEM REQUIREMENTS FOR THE DESIGN, DEVELOPMENT, SUPPLY AND MAINTENANCE OF SOFTWARE
ISO 10007:2017 Quality management — Guidelines for configuration management
STANAG 4159 : 0 NATO MATERIAL CONFIGURATION MANAGEMENT POLICY AND PROCEDURES FOR MULTINATIONAL JOINT PROJECTS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more