Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

DEFSTAN 05-10(PT3)/6(2013) : 2013

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

PRODUCT DEFINITION INFORMATION - PART 3: PRODUCT DEFINITION INFORMATION GUIDANCE

Available format(s)

Hardcopy , PDF

Withdrawn date

14-06-2018

Language(s)

English

Published date

01-01-2013

Free

Foreword
0 Introduction
1 Scope
2 Warning
3 Normative References
4 Definitions and Abbreviations
5 Configuration Management Considerations
6 Guidance for Part 1 - Hard Copy/Microform
  Product Definition Information
7 Guidance for Part 2 - digital Product
  Definition Information
Annex A - BS EN ISO 10303 Application Protocols

Specifies best practice for the implementation of Parts 1 and 2 of this Standard in a contract.

DevelopmentNote
Supersedes DEFSTAN 05-10(PT3)/5(2006). (04/2013)
DocumentType
Standard
Pages
34
PublisherName
UK Ministry of Defence Standards
Status
Withdrawn
Supersedes

DEFSTAN 02-123(PT1)/3(2015) : 2015 REQUIREMENTS FOR LAUNDRIES AND ASSOCIATED COMPARTMENTS - PART 1: LAUNDRIES AND ASSOCIATED COMPARTMENTS
DEFSTAN 08-107/3(2013) : 2013 GENERAL REQUIREMENTS FOR THE DESIGN OF ELECTROTECHNICAL AND NAVAL WEAPON EQUIPMENT
DEFSTAN 02-330/3(2013) : 2013 REQUIREMENTS FOR MAIN PROPULSION PLANT CONDENSERS IN NUCLEAR POWERED SUBMARINES
DEFSTAN 02-900(PT0)/3(2014) : 2014 GENERAL NAVAL STANDARD - PART 0: MANAGEMENT INFORMATION, COMMON DATA AND PROCEDURES FOR USE
DEFSTAN 02-329/4(2015) : 2015 REQUIREMENTS FOR HEAT EXCHANGERS FOR HM SURFACE SHIPS AND SUBMARINES
DEFSTAN 02-327/4(2016) : 2016 STANDARDS FOR DEFENCE REQUIREMENTS AND GUIDANCE FOR THE PROCUREMENT OF PUMPS FOR AUXILIARY SYSTEMS
DEFSTAN 02-375/2(2017) : 2017 VALVE DESIGN AND MANUFACTURE
DEFSTAN 02-900(PT0)/2(2013) : 2013 GENERAL NAVAL STANDARD - PART 0: MANAGEMENT INFORMATION, COMMON DATA AND PROCEDURES FOR USE
DEFSTAN 02-304(PT1)/3(2015) : 2015 SHAFTING SYSTEMS & PROPULSORS - PART 1: DESIGN REQUIREMENTS FOR MAIN PROPULSION SHAFTING
DEFSTAN 02-345/2(2013) : 2013 REQUIREMENTS FOR FLEXIBLE RUBBER PIPE ASSEMBLIES AND BELLOWS FOR USE IN SYSTEMS FROM VACUUM TO 20 BAR
DEFSTAN 02-900(PT2)/1(2013) : 2013 GENERAL NAVAL STANDARD - PART 2: SHIP CAPABILITY
DEFSTAN 02-795/2(2016) : 2016 REQUIREMENTS FOR HEALTH PHYSICS LABORATORIES AND RADIATION FACILITIES IN NUCLEAR SUBMARINES
DEFSTAN 02-123(PT2)/3(2015) : 2015 REQUIREMENTS FOR LAUNDRIES AND ASSOCIATED COMPARTMENTS - PART 2: LAUNDRY MACHINERY, EQUIPMENT AND FITTINGS
DEFSTAN 02-41/4(2015) : 2015 REQUIREMENTS FOR CONFIGURATION MANAGEMENT OF SURFACE SHIPS
DEFSTAN 02-304(PT2)/3(2015) : 2015 SHAFTING SYSTEMS & PROPULSORS - PART 2: DESIGN REQUIREMENTS FOR MAIN PROPULSION SHAFTING AUXILIARIES
DEFSTAN 02-125/4(2015) : 2015 REQUIREMENTS FOR NAAFI COMPARTMENTS IN HM SURFACE SHIPS AND SUBMARINES
DEFSTAN 02-303/3(2015) : 2015 LUBRICATING OIL SYSTEMS FOR PROPULSION AND GENERATION IN HM SURFACE SHIPS & SUBMARINES
DEFSTAN 05-57/6(2014) : 2014 CONFIGURATION MANAGEMENT OF DEFENCE MATERIEL
DEFSTAN 02-748/4(2017) : 2017 REQUIREMENTS FOR STRAINERS IN HM SURFACE SHIPS AND SUBMARINES
DEFSTAN 02-111/3(2016) : 2016 REQUIREMENTS FOR THE CONSTRUCTION, FITTING OUT AND TESTING OF REFRIGERATION SPACES IN HM SURFACE SHIPS AND SUBMARINES

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more