Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

DEFSTAN 02-43/3(2003) : 2003

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

ANCILLARY SUPPORT EQUIPMENT, TEST EQUIPMENT AND TOOLS

Withdrawn date

30-10-2012

Published date

12-01-2013

Sorry this product is not available in your region.

Preface
Main Text
SECTION 1 GENERAL REQUIREMENTS
0 Introduction
1 Scope
2 Warning
3 Related Documents
4 Definitions
5 Abbreviations
SECTION 2 POLICY, PLANNING AND ASSESSMENT OF REQUIREMENTS
6 Policy
7 Planning and Assessment of ASE, CUHT, GPTMEE, GPTMEM and STTE
8 Planning and Assessment of PSSE
9 Provision of Finance for ASE, CUHT, GPTMEE, GPTMEM, PSSE
   and STTE
10 Provision of ASE, CUHT, GPTMEE, GPTMEM, PSSE and STTE for
   Changes of Platform and Weapon Fitted Equipment
SECTION 3 SCREENING AND ESTABLISHMENT OF ALLOWANCES
11 Procedure
12 ASE
13 CUHT
14 GPTMEE
15 GPTMEM
16 PSSE Management Procedures
17 Identification of ASE
18 Identification of CUHT, GPTMEE and GPTMEM
19 Identification of PSSE
20 Platform (Onboard) Allowances
SECTION 3 SCREENING AND ESTABLISHMENT OF ALLOWANCES
21 Weapon's Items of GPTMEE and STTE
SECTION 4 PROCUREMENT
22 Extension of Applicability
23 Procurement of ASE and GPTMEE for New-to-Service Equipments
24 Procurement of ASE for Platforms (Onboard) and FSU
25 Procurement of New-to-Service CUHT, GPTMEE and GPTMEM
26 Procurement of PSSE for RC
27 Procurement of RATS Containers and their Special-to-Contents
   Inserts
28 Procurement of STTE (Weapons Items)
SECTION 5 DRAWINGS FOR TEST EQUIPMENT
29 Preparation of Drawings
30 Details of Compartment Tool Boxes
SECTION 6 SUPPLY AND CUSTODY
31 Supply
32 Tallying and Packaging
33 Onboard Storage and Stowage
34 Resupply of ASE
35 Resupply of GPTMEM
36 Resupply of PSSE

Provides guidance on the procedures to be adopted for the provision of equipment that may be required to upkeep, by maintenance or overhaul, Surface Ship and Submarine Platform-fitted systems and equipment sponsored by the MOD.

DevelopmentNote
Supersedes DEFSTAN 02-43/2(2001) (10/2003)
DocumentType
Standard
PublisherName
UK Ministry of Defence Standards
Status
Withdrawn
Supersedes

DEFSTAN 02-307/2(2004) : 2004 REQUIREMENTS FOR WORKSHOP EQUIPMENT - CATEGORY 2
DEFSTAN 66-31(PT1)/2(2008) : 2008 BASIC REQUIREMENTS AND TESTS FOR ELECTRONIC AND ELECTRICAL TEST AND MEASUREMENT EQUIPMENT - PART 1: INTRODUCTION AND GUIDE TO THE SPECIFICATION AND SELECTION OF TEST AND MEASUREMENT EQUIPMENT BY THE PROCURING AUTHORITY
DEFSTAN 66-31(PT1)/1(2007) : 2007 BASIC REQUIREMENTS & TESTS FOR ELECTRONIC & ELECTRICAL TEST & MEASUREMENT EQUIPMENT - PART 1: INTRODUCTION AND GUIDE TO THE SPECIFICATION AND SELECTION OF TEST AND MEASUREMENT EQUIPMENT BY THE PROCURING AUTHORITY
DEFSTAN 66-31(PT4)/1(2007) : 2007 BASIC REQUIREMENTS & TESTS FOR ELECTRONIC & ELECTRICAL TEST & MEASUREMENT EQUIPMENT - PART 4: CONTRACTOR REQUIREMENTS - NAVAL USE APPLICATION
DEFSTAN 02-250(PT0)/1(2013) : 2013 MARITIME SUPPORT MANAGEMENT - PART 0: GENERAL INFORMATION FOR TYPE A AND TYPE B SUPPORT
DEFSTAN 02-250(PT0)/2(2015) : 2015 MARITIME SUPPORT MANAGEMENT - PART 0: GENERAL INFORMATION FOR TYPE A AND TYPE B SUPPORT
DEFSTAN 66-31(PT4)/2(2008) : 2008 BASIC REQUIREMENTS & TESTS FOR ELECTRONIC & ELECTRICAL TEST & MEASUREMENT EQUIPMENT - PART 4: CONTRACTOR REQUIREMENTS - NAVAL USE APPLICATION

BS 3925(1965) : LATEST TOUGHENED SAFETY GLASS FOR SHIPS' WINDOWS
DEFSTAN 02-723/1(2000) : 2000 REQUIREMENTS FOR MARKER PLATES
DEFSTAN 02-302(PT2)(2000) : 2000 REQUIREMENTS FOR MAINTENANCE ENVELOPES AND REMOVAL ROUTES - PART 2: REQUIREMENTS FOR SUBMARINES CATEGORY 2
DEFSTAN 02-40(PT1)/1(2000) : 2000 REQUIREMENTS FOR THE PREPARATION OF TECHNICAL PUBLICATIONS - PART 1: SYSTEM AND EQUIPMENT PUBLICATIONS CATEGORY 2
DEFSTAN 02-40(PT3)/1(2000) : 2000 REQUIREMENTS FOR THE PREPARATION OF TECHNICAL PUBLICATIONS - PART 3: ENGINEERING MANUALS CATEGORY 2
DEFSTAN 02-722/1(2000) : 2000 REQUIREMENTS FOR THE PREPARATION, IDENTIFICATION AND MANAGEMENTS OF DRAWINGS
DEFSTAN 00-60(PT0)/5(2002) : 2002 CORR 2004 INTEGRATED LOGISTIC SUPPORT - PART 0: APPLICATION OF INTEGRATED LOGISTIC SUPPORT (ILS)
DEFSTAN 02-501(2000) : 2000 GENERAL REQUIREMENTS FOR THE DESIGN OF ELECTROTECHNICAL AND NAVAL WEAPON EQUIPMENT CATEGORY 2
DEFSTAN 02-54/1(2000) : 2000 SUPPLY OF INFORMATION TO DETERMINE, THE SHIP-FIT OF EQUIPMENT AND THE IDENTIFICATION OF PARTS AND SPARES
BS 0-3:1997 A standard for standards Specification for structure, drafting and presentation
DEFSTAN 02-41/2(2000) : 2000 AMD 1 2004 REQUIREMENTS FOR CONFIGURATION MANAGEMENT OF SURFACE WARSHIPS
ISO/IEC Guide 2:2004 Standardization and related activities — General vocabulary

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.