Customer Support: 131 242

  • Shopping Cart
    There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

DEFSTAN 00-35(PT3)/4(2006) : 2006

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

ENVIRONMENTAL HANDBOOK FOR DEFENCE MATERIEL - PART 3: ENVIRONMENTAL TEST METHODS

Available format(s)

Hardcopy , PDF

Superseded date

28-01-2017

Language(s)

English

Published date

01-01-2006

Free

SECTION 1 - GENERAL
Chapter 1-01 - General
Chapter 1-02 - Selection and Sequence of Tests
Chapter 1-03 - General Environmental Test Conditions and
               Tolerances
Chapter 1-04 - Test Apparatus/Jigs/Fixtures and Test Control
Chapter 1-05 - Examination and Performance Evaluation
Chapter 1-06 - Glossary of Terms
SECTION 2 - MECHANICAL
Chapter 2-01 - Test M1 - General Purpose Vibration Test
Chapter 2-02 - Test M2 - Multi-Exciter Vibration and Shock Test
Chapter 2-03 - Test M3 - Classical and Sine Waveform Shock
Chapter 2-04 - Test M4 - Drop, Topple and Roll Test
Chapter 2-05 - Test M5 - Impact (Vertical and Horizontal) Test
Chapter 2-06 - Test M6 - Operational Shock Simulation Test
Chapter 2-07 - Test M7 - Shock Testing for Warship Equipment
               and Armament Stores
Chapter 2-08 - Test M8 - Acoustic Noise Test Using a
               Reverberation Chamber
Chapter 2-09 - Test M9 - Acoustic Noise Test using a Progressive
               Wave Tube
Chapter 2-10 - Test M10 - Combined Acoustic, Temperature and
               Vibration
Chapter 2-11 - Test M11 - Wheeled Vehicle Transportation Bounce
               Test
Chapter 2-12 - Test M12 - Bump Test
Chapter 2-13 - Test M13 - Steady State Acceleration Test
Chapter 2-14 - Test M14 - Test Track Trial
Chapter 2-15 - Test M15 - Lifting Test
Chapter 2-16 - Test M16 - Stacking Static Load Test
Chapter 2-17 - Test M17 - Bending Test
Chapter 2-18 - Test M18 - Racking Test
Chapter 2-19 - Test M19 - General Time History Replication Test
SECTION 3 - CLIMATIC
Chapter 3-01 - Test CL1 - Constant High Temperature - Low
               Humidity Test
Chapter 3-02 - Test CL2 - High Temperature, Low Humidity and
               Solar Heating Test
Chapter 3-03 - Test CL3 - Solar Radiation Test
Chapter 3-04 - Test CL4 - Constant Low Temperature Test
Chapter 3-05 - Test CL5 - Low Temperature Test
Chapter 3-06 - Test CL6 - High Temperature, Humidity and Solar
               Heating Diurnal Cycle Test
Chapter 3-07 - Test CL7 - Constant High Temperature - High
               Humidity Test
Chapter 3-08 - Test CL8 - Kinetic (Aerodynamic) Heating
Chapter 3-09 - Test CL9 - Rapid and Explosive Decompression
Chapter 3-10 - Test CL10 - Icing
Chapter 3-11 - Test CL11 - High Temperature - Low Pressure
Chapter 3-12 - Test CL12 - Low Temperature - Low Pressure Test
Chapter 3-13 - Test CL13 - Low Temperature - Low Pressure - High
               Humidity
Chapter 3-14 - Test CL14 - Thermal Shock and Rapid Rate of
               Change of Temperature
Chapter 3-15 - Test CL15 - Air Pressure (above Standard
               Atmospheric)
Chapter 3-16 - Test CL16 - High Winds
Chapter 3-17 - Test CL17 - Elevated Ground-Temperature/Humidity
               Diurnal Cycles
Chapter 3-18 - Test CL18 - Driving Snow
Chapter 3-19 - Test CL19 - Erosion and Structural Damage in
               Flight by Rain, Hail, Dust or Sand
Chapter 3-20 - Test CL20 - Rapid Change of Pressure
Chapter 3-21 - Test CL21 - Low Air Pressure and Air
               Transportation Tests
Chapter 3-22 - Test CL22 - Snow Load
Chapter 3-23 - Test CL23 - Impact Icing
Chapter 3-24 - Test CL24 - Freeze - Thaw
Chapter 3-25 - Test CL25 - Dust and Sand
Chapter 3-26 - Test CL26 - Mist, Fog and Low Cloud
Chapter 3-27 - Test CL27 - Driving Rain
Chapter 3-28 - Test CL28 - Dripproofness
Chapter 3-29 - Test CL29 - Immersion
Chapter 3-30 - Test CL30 - Sealing (Pressure Differential)
SECTION 4 - CHEMICAL AND BIOLOGICAL
Chapter 4-01 - Test CN1 - Mould Growth
Chapter 4-02 - Test CN2 - Salt (Corrosive) Atmospheres
Chapter 4-03 - Test CN3 - Acid Corrosion
Chapter 4-04 - Test CN4 - Contamination by Fluids
Chapter 4-05 - Test CN5 - Corrosion Test for Materiel Immersed
               in Salt Water
SECTION 5 - ABNORMAL (ACCIDENTAL & HOSTILE)
Chapter 5-01 - Test FX1 - Bullet Attack Test for Munitions
Chapter 5-02 - Test FX2 - Standard Liquid Fuel Fire
Chapter 5-03 - Test FX3 - Safety Impact Test for Munitions
Chapter 5-04 - Test FX4 - Slow Heating Tests for Munitions
Chapter 5-05 - Test FX5 - Sympathetic Reaction, Munition Test

Contains environmental descriptions, a range of tests procedures and default test severities representing conditions which may be encountered during the life of defence materiel.

DevelopmentNote
Supersedes DEFSTAN 00-35(PT3)/3(1999) (09/2006)
DocumentType
Standard
Pages
605
PublisherName
UK Ministry of Defence Standards
Status
Superseded
Supersedes

DEFSTAN 81-41(PT3)/5(2007) : 2007 PACKAGING OF DEFENCE MATERIEL - PART 3: ENVIRONMENTAL TESTING
DEFSTAN 00-970(PT1)SEC7/5(2007) : 2007 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: COMBAT AIRCRAFT - SECTION 7: OPERATING LIMITATIONS AND INFORMATION
DEFSTAN 00-970(PT0)/6(2010) : 2010 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
DEFSTAN 02-121(PT1)/3(2010) : 2010 REQUIREMENTS FOR GALLEYS AND ASSOCIATED SPACES - PART 1: COMMON REQUIREMENTS
DEFSTAN 00-970(PT1)SEC7/9(2013) : 2013 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 7: OPERATING LIMITATIONS AND INFORMATION
DEFSTAN 00-250(PT3)SEC1-7/1(2008) : 2008 HUMAN FACTORS FOR DESIGNERS OF SYSTEMS - PART 3: TECHNICAL GUIDANCE - SECTIONS 1-7 - OVERALL CONTENTS/SCOPE
DEFSTAN 08-107/3(2013) : 2013 GENERAL REQUIREMENTS FOR THE DESIGN OF ELECTROTECHNICAL AND NAVAL WEAPON EQUIPMENT
DEFSTAN 02-123(PT1)/3(2015) : 2015 REQUIREMENTS FOR LAUNDRIES AND ASSOCIATED COMPARTMENTS - PART 1: LAUNDRIES AND ASSOCIATED COMPARTMENTS
DEFSTAN 00-970(PT1)SEC7/11(2014) : 2014 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 7: OPERATING LIMITATIONS AND INFORMATION
DEFSTAN 47-32/2(2011) : 2011 RUBBER HOSE AND HOSE ASSEMBLIES FOR FLUID POWER SYSTEMS
DEFSTAN 00-970(PT1)SEC2/7(2011) : 2011 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 2: FLIGHT
DEFSTAN 00-970(PT1)SEC2/13(2015) : 2015 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 2: FLIGHT
DEFSTAN 00-970(PT1)SEC6/15(2015) : 2015 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 6: EQUIPMENT
DEFSTAN 00-970(PT1)SEC6/6(2010) : 2010 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 6: EQUIPMENT
DEFSTAN 00-250(PT1)/1(2008) : 2008 HUMAN FACTORS FOR DESIGNERS OF SYSTEMS - PART 1: OVERARCHING PEOPLE-RELATED REQUIREMENTS
DEFSTAN 00-970(PT1)SEC7/12(2014) : 2014 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 7: OPERATING LIMITATIONS AND INFORMATION
DEFSTAN 00-970(PT1)SEC2/9(2013) : 2013 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 2: FLIGHT
DEFSTAN 00-250(PT3)SEC11/1(2008) : 2008 HUMAN FACTORS FOR DESIGNERS OF SYSTEMS - PART 3: TECHNICAL GUIDANCE - SECTION 11 - TRAINING
DEFSTAN 00-970(PT1)SEC2/6(2011) : 2011 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 2: FLIGHT
DEFSTAN 00-970(PT1)SEC6/10(2013) : 2013 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 6: EQUIPMENT
DEFSTAN 00-970(PT1)SEC6/11(2013) : 2013 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 6: EQUIPMENT
DEFSTAN 00-970(PT1)SEC6/9(2012) : 2012 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 6 - EQUIPMENT
DEFSTAN 00-970(PT1)SEC6/5(2007) : 2007 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: COMBAT AIRCRAFT - SECTION 6: EQUIPMENT
DEFSTAN 02-112/3(2007) : 2007 REQUIREMENTS FOR WINDOWS AND WINDOW WIPERS FOR HM SURFACE SHIPS
DEFSTAN 00-035(PT2)/5(2017) : 2017 ENVIRONMENTAL HANDBOOK FOR DEFENCE MATERIEL - PART 2: ENVIRONMENTAL TRIALS PROGRAMME DERIVATION AND ASSESSMENT METHODOLOGIES
DEFSTAN 00-970(PT1)SEC2/12(2014) : 2014 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 2: FLIGHT
DEFSTAN 00-250(PT3)SEC15/1(2008) : 2008 HUMAN FACTORS FOR DESIGNERS OF SYSTEMS - PART 3: TECHNICAL GUIDANCE - SECTION 15 - WORK EQUIPMENT
DEFSTAN 00-250(PT3)SEC13/1(2008) : 2008 HUMAN FACTORS FOR DESIGNERS OF SYSTEMS - PART 3: TECHNICAL GUIDANCE - SECTION 13 - THE WORKPLACE
DEFSTAN 02-113/2(2010) : 2010 REQUIREMENTS FOR MECHANICAL HANDLING
DEFSTAN 00-250(PT3)SEC8/1(2008) : 2008 HUMAN FACTORS FOR DESIGNERS OF SYSTEMS - PART 3: TECHNICAL GUIDANCE - SECTION 8 - PEOPLE IN SYSTEMS
DEFSTAN 00-970(PT1)SEC2/11(2014) : 2014 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 2: FLIGHT
DEFSTAN 00-250(PT3)SEC9/1(2008) : 2008 HUMAN FACTORS FOR DESIGNERS OF SYSTEMS - PART 3: TECHNICAL GUIDANCE - SECTION 9 - PEOPLE CHARACTERISTICS
DEFSTAN 02-860/1(2010) : 2010 REQUIREMENTS FOR THE DESIGN AND MANUFACTURE OF PORTABLE FIRE EXTINGUISHERS
DEFSTAN 00-970(PT1)SEC6/14(2015) : 2015 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 6: EQUIPMENT
DEFSTAN 02-327/4(2016) : 2016 STANDARDS FOR DEFENCE REQUIREMENTS AND GUIDANCE FOR THE PROCUREMENT OF PUMPS FOR AUXILIARY SYSTEMS
DEFSTAN 00-250(PT3)SEC10/1(2008) : 2008 HUMAN FACTORS FOR DESIGNERS OF SYSTEMS - PART 3: TECHNICAL GUIDANCE - SECTION 10 - SYSTEMS SAFETY
DEFSTAN 00-970(PT1)SEC2/8(2012) : 2012 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 2 - FLIGHT
DEFSTAN 00-250(PT3)SEC12/1(2008) : 2008 HUMAN FACTORS FOR DESIGNERS OF SYSTEMS - PART 3: TECHNICAL GUIDANCE - SECTION 12 - OPERATIONS, MAINTENANCE & SUPPORT
DEFSTAN 00-250(PT2)/1(2008) : 2008 HUMAN FACTORS FOR DESIGNERS OF SYSTEMS - PART 2: PARTICULAR PEOPLE-RELATED REQUIREMENTS
DEFSTAN 61-021 SUPP42/4(2017) : INTERIM GENERAL SPECIFICATION FOR BATTERIES - SUPPLEMENT 42: SEALED LEAD ACID BATTERY 12V 110 AH (MINIMUM) NSN 6140-99-219-2903, NSN 6140-99-690-6632, NSN 6140-12-369-8589, NSN 6140-99-738-0574, NSN 6140-01-485-1472
DEFSTAN 00-250(PT3)SEC16/1(2008) : 2008 HUMAN FACTORS FOR DESIGNERS OF SYSTEMS - PART 3: TECHNICAL GUIDANCE - SECTION 16 - LIVING SPACES
DEFSTAN 00-250(PT3)SEC14/1(2008) : 2008 HUMAN FACTORS FOR DESIGNERS OF SYSTEMS - PART 3: TECHNICAL GUIDANCE - SECTION 14 - THE ENVIRONMENT
DEFSTAN 00-970(PT1)SEC7/10(2013) : 2013 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 7: OPERATING LIMITATIONS AND INFORMATION
DEFSTAN 00-035(PT5)/5(2018) : 2018 ENVIRONMENTAL HANDBOOK FOR DEFENCE MATERIEL - PART 5: MECHANICAL ENVIRONMENTS
DEFSTAN 00-970(PT1)SEC2/10(2013) : 2013 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 2: FLIGHT
DEFSTAN 81-41(PT3)/6(2014) : 2014 PACKAGING OF DEFENCE MATERIEL - PART 3: ENVIRONMENTAL TESTING
DEFSTAN 02-900(PT0)/2(2013) : 2013 GENERAL NAVAL STANDARD - PART 0: MANAGEMENT INFORMATION, COMMON DATA AND PROCEDURES FOR USE
DEFSTAN 47-032/3(2017) : 2017 RUBBER HOSE AND HOSE ASSEMBLIES FOR FLUID POWER SYSTEMS
DEFSTAN 00-970(PT1)SEC6/7(2011) : 2011 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 6: EQUIPMENT
DEFSTAN 00-970(PT1)SEC6/8(2011) : 2011 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 6 - EQUIPMENT
DEFSTAN 00-970(PT1)SEC6/13(2014) : 2014 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 6: EQUIPMENT
DEFSTAN 00-970(PT0)/5(2007) : 2007 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 0: PROCEDURES FOR USE, CONTENT AND DEFINITIONS
DEFSTAN 00-970(PT1)SEC7/8(2012) : 2012 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 7: OPERATING LIMITATIONS AND INFORMATION
DEFSTAN 02-795/2(2016) : 2016 REQUIREMENTS FOR HEALTH PHYSICS LABORATORIES AND RADIATION FACILITIES IN NUCLEAR SUBMARINES
DEFSTAN 00-003/5(2016) : 2016 DESIGN GUIDANCE FOR THE TRANSPORTABILITY OF EQUIPMENT
DEFSTAN 02-123(PT2)/3(2015) : 2015 REQUIREMENTS FOR LAUNDRIES AND ASSOCIATED COMPARTMENTS - PART 2: LAUNDRY MACHINERY, EQUIPMENT AND FITTINGS
DEFSTAN 81-041(PT1)/9(2016) : 2016 PACKAGING OF DEFENCE MATERIEL - PART 1: INTRODUCTION TO DEFENCE PACKAGING REQUIREMENTS
DEFSTAN 02-606/2(2007) : 2007 SELECTION OF TORSIONMETER SYSTEMS
DEFSTAN 00-003/6(2017) : 2017 DESIGN GUIDANCE FOR THE TRANSPORTABILITY OF EQUIPMENT
AEP-4495 : 2016 GUIDANCE FOR THE PROCUREMENT OF LASER EYE PROTECTION (LEP) FOR THE INDIVIDUAL MILITARY USER
DEFSTAN 02-322/3(2010) : 2010 OIL AND BILGE WATER SHIPBOARD PROCESSING ARRANGEMENTS
DEFSTAN 00-970(PT1)SEC6/16(2016) : 2016 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 6: EQUIPMENT
DEFSTAN 00-970(PT1)SEC2/14(2015) : 2015 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 2: FLIGHT
DEFSTAN 00-970(PT1)SEC7/13(2015) : 2015 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 7: OPERATING LIMITATIONS AND INFORMATION
DEFSTAN 00-970(PT1)SEC7/7(2011) : 2011 DESIGN AND AIRWORTHINESS REQUIREMENTS FOR SERVICE AIRCRAFT - PART 1: FIXED WING - SECTION 7: OPERATING LIMITATIONS AND INFORMATION
DEFSTAN 00-84/1(2010) : 2010 DESIGN GUIDELINES FOR THE PROCUREMENT OF DEHUMIDIFIERS AND ASSOCIATED EQUIPMENT
DEFSTAN 00-035(PT3)/5(2017) : 2017 ENVIRONMENTAL HANDBOOK FOR DEFENCE MATERIEL - PART 3: ENVIRONMENTAL TEST METHODS
DEFSTAN 61-5(PT6)/6(2009) : 2009 NOMINAL 12 V AND 24 V DC ELECTRICAL SYSTEMS IN MILITARY PLATFORMS
AAS3P-10 : 2011 SAFETY AND SUITABILITY FOR SERVICE ASSESSMENT TESTING FOR SHOULDER LAUNCHED MUNITIONS
DEFSTAN 00-035(PT1)/5(2018) : 2018 ENVIRONMENTAL HANDBOOK FOR DEFENCE MATERIEL - PART 1: CONTROL AND MANAGEMENT

STANAG 4142 : 77 AMD 5 SHOCK RESISTANCE ANALYSIS OF EQUIPMENT FOR SURFACE SHIPS
MIL-HDBK-781 Revision A:1996 RELIABILITY TEST METHODS, PLANS, AND ENVIRONMENTS FOR ENGINEERING DEVELOPMENT, QUALIFICATION AND PRODUCTION
STANAG 4141 : 76 AMD 4 SHOCK TESTING OF EQUIPMENT FOR SURFACE SHIPS
MIL S 901 : D SHOCK TESTS, HI [HIGH IMPACT] SHIPBOARD MACHINERY, EQUIPMENT AND SYSTEMS, REQUIREMENTS FOR
STANAG 4150 : 79 AMD 2 SHOCK TESTING OF HEAVYWEIGHT SURFACE SHIP EQUIPMENT IN FLOATING SHOCK VEHICLES
STANAG 4137 : 76 AMD 6 STANDARD UNDERWATER EXPLOSION TEST FOR OPERATIONAL SURFACE SHIPS AND CRAFTS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.