CEI EN 61850-5 : 2013
Current
The latest, up-to-date edition.
COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 5: COMMUNICATION REQUIREMENTS FOR FUNCTIONS AND DEVICE MODELS
Hardcopy , PDF
English
01-01-2013
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviations
5 Power utility automation functions
6 Goal and requirements
7 Categories of functions
8 Function description and function requirements
9 The application concept for logical nodes
10 System description and system requirements
11 Performance requirements
12 Additional requirements for the data model
Annex A (informative) - Logical nodes and related
PICOMs
Annex B (informative) - PICOM identification and
message classification
Annex C (informative) - Communication optimization
Annex D (informative) - Rules for function definition
Annex E (informative) - Interaction of functions and
logical nodes
Annex F (informative) - Functions
Annex G (informative) - Results from function description
Annex H (informative) - Substation configurations
Annex I (informative) - Examples for protection functions
in compensated networks
Bibliography
ANNEX ZA (normative) - Normative reference to
international publications with their
corresponding European publications
Pertains to power utility automation systems with the core part of substation automation systems (SAS).
Committee |
CT 57
|
DevelopmentNote |
Classificazione CEI 57-51. (01/2005)
|
DocumentType |
Standard
|
Pages |
150
|
PublisherName |
Comitato Elettrotecnico Italiano
|
Status |
Current
|
Standards | Relationship |
IEC 61850-5:2013 | Identical |
EN 61850-5:2013 | Identical |
EN 61850-6:2010 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
IEC 61850-7-2:2010 | Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
IEC 61850-6:2009 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
IEC 60870-4:1990 | Telecontrol equipment and systems. Part 4: Performance requirements |
IEC TR 61850-1:2013 | Communication networks and systems for power utility automation - Part 1: Introduction and overview |
IEC 60834-2:1993 | Performance and testing of teleprotection equipment of power systems - Part 2: Analogue comparison systems |
IEC 61850-7-1:2011 | Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models |
IEC 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
IEC 61850-7-3:2010 | Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
IEC 61850-10:2012 | Communication networks and systems for power utility automation - Part 10: Conformance testing |
IEC TS 61850-2:2003 | Communication networks and systems in substations - Part 2: Glossary |
EN 61000-4-15:2011 | Electromagnetic compatibility (EMC) - Part 4-15: Testing and measurement techniques - Flickermeter - Functional and design specifications |
IEC 61850-3:2013 | Communication networks and systems for power utility automation - Part 3: General requirements |
IEC 60834-1:1999 | Teleprotection equipment of power systems - Performance and testing - Part 1: Command systems |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.