CECC 00401 : 91 AMD 1
Withdrawn
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
GLOSSARY OF ABBREVIATIONS, TERMS AND DEFINITIONS OF THE CECC SYSTEM
Withdrawn date
02-06-2016
Published date
12-01-2013
Publisher
Sorry this product is not available in your region.
DocumentType |
Standard
|
PublisherName |
Cenelec Electronic Components Committee
|
Status |
Withdrawn
|
PD R086-001:2000 | Guidance for technology audit of fibre optic connector kits and terminated connectors |
BS CECC 265001:1998 | Harmonized system of quality assessment for electronic components. Technology approval schedule. Film and hybrid integrated circuits |
BS CECC 200025:1998 | Harmonized system of quality assessment for electronic components. Process assessment schedule: printed board assembly facilities |
96/205775 DC : 0 | BS CECC 210003 - TECHNOLOGY APPROVAL SCHEDULE FOR PRINTED BOARDS |
CEI CECC 200025 : 2000 | PROCESS ASSESSMENT SCHEDULE: PRINTED BOARD ASSEMBLY FACILITIES |
EN 100114-1 : 1996 | RULE OF PROCEDURE - QUALITY ASSESSMENT PROCEDURES - PART 1: CECC REQUIREMENTS FOR THE APPROVAL OF AN ORGANIZATION |
BS CECC 00114-5:1993 | Rule of procedure 14. Quality assessment procedures Process approval of specialist contractors within the electronic components industry |
96/205776 DC : DRAFT MAY 1996 | BS CECC 200021 - PROCESS ASSESSMENT SCHEDULE FOR MASS LAMINATION PANELS |
BS CECC 200000:1993 | Harmonized system of quality assessment for electronic components. Requirements for process assessment schedules for process approval |
BS CECC 299001:1999 | Technology approval schedule. Manufacture of electrical connectors |
CECC 200025 : 1998 | PROCESS ASSESSMENT SCHEDULE: PRINTED BOARD ASSEMBLY FACILITIES |
DIN EN 100114-1:1996-11 | RULE OF PROCEDURE - QUALITY ASSESSMENT PROCEDURE - PART 1: CECC REQUIREMENTS FOR THE APPROVAL OF AN ORGANIZATION |
BS QC 200012:1996 | Process assessment schedule for printed board design facilities |
BS EN 100114-1:1997 | Rule of Procedure 14. Quality assessment procedures CECC requirements for the approval of an organization |
I.S. EN 100114-1:1997 | RULE OF PROCEDURE - QUALITY ASSESSMENT PROCEDURES - PART 1: CECC REQUIREMENTS FOR THE APPROVAL OF AN ORGANIZATION |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.