BS EN ISO 16484-1:2010
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Building automation and control systems (BACS) Project specification and implementation
Hardcopy , PDF
25-01-2024
English
31-12-2010
Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviated terms
5 Requirements and recommendations
6 Review and improvement of building performance
Bibliography
Describes guiding principles for project design and implementation and for the integration of other systems into the building automation and control systems (BACS).
Committee |
RHE/16
|
DevelopmentNote |
Supersedes 09/30202642 DC. (12/2010)
|
DocumentType |
Standard
|
Pages |
34
|
PublisherName |
British Standards Institution
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
This International Standard specifies guiding principles for project design and implementation and for the integration of other systems into the building automation and control systems (BACS).
This International Standard specifies the phases required for the BACS project, including:
-
design (determination of project requirements and production of design documents including technical specifications),
-
engineering (detailed function and hardware design),
-
installation (installing and commissioning of the BACS), and
-
completion (handover, acceptance and project finalization).
This International Standard also specifies the requirements for as-built documentation and training.
This International Standard is not applicable to operation and maintenance, nor is it applicable to retro or continuous commissioning, including a commissioning authority.
Standards | Relationship |
ISO 16484-1:2010 | Identical |
EN ISO 16484-1:2010 | Identical |
IEC 60050-351:2013 | International Electrotechnical Vocabulary (IEV) - Part 351: Control technology |
ISO 16484-5:2017 | Building automation and control systems (BACS) — Part 5: Data communication protocol |
ASHRAE GUIDELINE 0 : 2013 | THE COMMISSIONING PROCESS |
ISO 16484-6:2014 | Building automation and control systems (BACS) Part 6: Data communication conformance testing |
ISO 16484-2:2004 | Building automation and control systems (BACS) — Part 2: Hardware |
ASHRAE GUIDELINE 13 : 2014 | SPECIFYING BUILDING AUTOMATION SYSTEMS |
ISO/IEC TR 14763-2:2000 | Information technology Implementation and operation of customer premises cabling Part 2: Planning and installation of copper cabling |
ISO 16484-3:2005 | Building automation and control systems (BACS) — Part 3: Functions |
EN 15232:2012 | Energy performance of buildings - Impact of Building Automation, Controls and Building Management |
IEC 62305-4:2010 | Protection against lightning - Part 4: Electrical and electronic systems within structures |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.