BS EN 62439-5:2010
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Industrial communication networks. High availability automation networks Beacon redundancy protocol (BRP)
Hardcopy , PDF
15-03-2018
English
30-06-2010
INTRODUCTION
1 Scope
2 Normative references
3 Terms, definitions, abbreviations, acronyms, and
conventions
4 BRP overview
5 BRP principle of operation
6 BRP stack and fault detection features
7 BRP protocol specification
8 BRP message structure
9 BRP fault recovery time
10 BRP service definition
11 BRP Management Information Base (MIB)
Bibliography
Annex ZA (normative) - Normative references to international
publications with their corresponding European
publications
Pertains to high-availability automation networks based on the ISO/IEC 8802-3 (IEEE 802.3) (Ethernet) technology.
Committee |
GEL/65/3
|
DevelopmentNote |
Together with BS EN 62439-1, BS EN 62439-2, BS EN 62439-3, BS EN 62439-4 and BS EN 62439-6, it supersedes BS EN 62439. (06/2010)
|
DocumentType |
Standard
|
Pages |
46
|
PublisherName |
British Standards Institution
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
The IEC 62439 series is applicable to high-availability automation networks based on the ISO/IEC 8802-3 (IEEE 802.3) (Ethernet) technology.
This part of the IEC 62439 series specifies a redundancy protocol that is based on the duplication of the network, the redundancy protocol being executed within the end nodes, as opposed to a redundancy protocol built in the switches. Fast error detection is provided by two beacon nodes, the switchover decision is taken in every node individually. The cross-network connection capability enables single attached end nodes to be connected on either of the two networks.
Standards | Relationship |
IEC 62439-5:2016 | Identical |
IEC 62439-5:2010 | Identical |
EN 62439-5:2010 | Identical |
EN 62439-5 : 2018 | Identical |
EN 62439-1:2010/A2:2017 | INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 1: GENERAL CONCEPTS AND CALCULATION METHODS (IEC 62439-1:2010/A2:2016) |
IEC 62439-3:2016 | Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR) |
IEC 62439-4:2010 | Industrial communication networks - High availability automation networks - Part 4: Cross-network Redundancy Protocol (CRP) |
ISO/IEC 8802-3:2000 | Information technology Telecommunications and information exchange between systems Local and metropolitan area networks Specific requirements Part 3: Carrier sense multiple access with collision detection (CSMA/CD) access method and physical layer specifications |
IEEE 802.1Q-2014 | IEEE Standard for Local and metropolitan area networks--Bridges and Bridged Networks |
IEEE 802.1D-2004 | IEEE Standard for Local and metropolitan area networks: Media Access Control (MAC) Bridges |
IEC 62439-1:2010+AMD1:2012+AMD2:2016 CSV | Industrial communication networks - High availability automation networks - Part 1: General concepts and calculation methods |
IEC 62439-6:2010 | Industrial communication networks - High availability automation networks - Part 6: Distributed Redundancy Protocol (DRP) |
ISO/IEC TR 8802-1:2001 | Information technology Telecommunications and information exchange between systems Local and metropolitan area networks Specific requirements Part 1: Overview of Local Area Network Standards |
IEC 62439-2:2016 | Industrial communication networks - High availability automation networks - Part 2: Media Redundancy Protocol (MRP) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.