Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

BS CECC 299001:1999

Current

Current

The latest, up-to-date edition.

Technology approval schedule. Manufacture of electrical connectors

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

15-11-1999

$443.41
Including GST where applicable

Introduction
1 General
      1.1 Scope
      1.2 Related Documents
      1.3 Units, Symbols and Technology
      1.4 Standard and Preferred Values
      1.5 Definitions
2 Definition of the Component Technology
      2.1 Scope
      2.2 Description of Activities and Flow Charts
      2.3 Technology Abstract
3 Component Design
      3.1 Scope
      3.2 Description of Activities and Flow Charts
      3.3 Interrelationships
             3.3.1 Design Manufacture
             3.3.2 Customer/User
             3.3.3 Subcontractors, Vendors and Internal
                      Suppliers
4 Piece-Part Manufacture
      4.1 Scope
      4.2 Description of Activities and Flow Charts
      4.3 Materials, Inspection and Handling
      4.4 Equipment
      4.5 Rework
      4.6 Validation and Control of the Process(es)
      4.7 Subcontracting
5 Assembly
      5.1 Scope
      5.2 Description of Activities and Flow Charts
      5.3 Materials, Inspection and Handling
      5.4 Equipment
      5.5 Rework
      5.6 Validation and Control of the Process(es)
      5.7 Subcontracting
6 Testing
      6.1 Scope
      6.2 Description of Activities and Flow Charts
      6.3 Equipment
      6.4 Test Procedures
      6.5 Interrelationships
             6.5.1 Subcontracting
             6.5.2 Verification of Customer Specification
7 Verification and Test Vehicles
      7.1 Process Boundary Verification
      7.2 Product Verification
8 Process Characterisation
      8.1 Identification of Process Characteristics
      8.2 Description of Activities and Flow Charts
9 Primary Packaging and Shipment
      9.1 Description of Activities and Flow Charts
      9.2 Interrelationships
             9.2.1 Verification of Customer Requirements
             9.2.2 Subcontracting
      9.3 Validity of Release
10 Withdrawal of Technology Approval
Figure 1 - Example Flow Chart - Design/Manufacture/Test
Figure 2 - Example Flow Chart - Design
Figure 3 - Example Flow Chart - Piece-Part Manufacture
Figure 4 - Example Flow Chart - Connector Assembly
Figure 5 - Example Flow Chart - Testing of Connectors
Annex A - Example Abstract of Technology Approval

Specifies the terms, definitions, symbols, quality system, tests, assessment, verification methods and other requirements relevant to the design, manufacture and supply of electrical connectors.

Committee
EPL/46
DevelopmentNote
Reviewed and confirmed by BSI, December 2005. (11/2005)
DocumentType
Standard
Pages
26
PublisherName
British Standards Institution
Status
Current

Standards Relationship
CECC 21999 001 : 1999 Identical

EN 175100 : 1992 HARMONIZED SYSTEM OF QUALITY ASSESSMENT FOR ELECTRONIC COMPONENTS - SECTIONAL SPECIFICATION: TWO PART AND EDGE SOCKET CONNECTORS FOR PRINTED BOARD APPLICATIONS
CECC 00114-0 : 1994 RULE OF PROCEDURE 14: QUALITY ASSESSMENT PROCEDURES - AN INTRODUCTION TO THE TYPES OF APPROVAL AVAILABLE UNDER THE CECC SYSTEM
EN 175300:1996 Sectional Specification: Rectangular connectors for frequencies below 3 MHz
CECC 00806 : 1994 GUIDE TO TOTAL QUALITY MANAGEMENT (TQM) FOR CECC APPROVED ORGANIZATIONS
IEC 60027-1:1992 Letters symbols to be used in electrical technology - Part 1: General
CECC 00114-6 : 1994 TECHNOLOGY APPROVAL OF ELECTRONIC COMPONENT MANUFACTURERS
CECC 00016 : 1990 BASIC SPECIFICATION - BASIC REQUIREMENTS FOR THE USE OF STATISTICAL PROCESS CONTROL (SPC) IN THE CECC SYSTEM
ISO 9001:2015 Quality management systems — Requirements
CECC 00200 : 2002 REGISTER OF FIRMS, PRODUCTS AND SERVICES APPROVED UNDER CECC CERTIFICATION SYSTEM FOR ELECTRONIC COMPONENTS
CECC 210000 : 1994 HARMONIZED SYSTEM OF QUALITY ASSESSMENT FOR ELECTRONIC COMPONENTS - REQUIREMENTS FOR TECHNOLOGY APPROVAL SCHEDULES (TAS)
ISO 497:1973 Guide to the choice of series of preferred numbers and of series containing more rounded values of preferred numbers
CECC 00401 : 91 AMD 1 GLOSSARY OF ABBREVIATIONS, TERMS AND DEFINITIONS OF THE CECC SYSTEM
EN 175200:1996 Sectional Specification: Circular connectors
EN 45001 : 1989 GENERAL CRITERIA FOR THE OPERATION OF TESTING LABORATORIES

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more