BS 9000-2:1991
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
General requirements for a system for electronic components of assessed quality Specification for the national implementation of the CECC system
Hardcopy , PDF
15-05-1996
English
31-10-1991
Committees responsible
Foreword
Specification
1 Scope
2 Operation of the CECC System
3 National procedure for implementation
Appendix
A List of other CECC documents
Lists the definitive documents and details the national organizations relevant.
Committee |
W/-
|
DevelopmentNote |
SUPERSEDES BS 9000: PART 2:1983.
|
DocumentType |
Standard
|
Pages |
8
|
PublisherName |
British Standards Institution
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
Standards | Relationship |
CECC 00112 : 82 AMD 4 | Similar to |
CECC 00111 : 80 AMD 3 | Similar to |
CECC 00104 : 89 AMD 3 93 | Similar to |
CECC 00108 : 94 AC 98 | Similar to |
CECC 00109 : 1974 | Similar to |
CECC 00114 : 93 AMD 1 | Corresponds |
BS 9000-3:1991 | General requirements for a system for electronic components of assessed quality Specification for the national implementation of the IECQ system |
BS CECC 00114-5:1993 | Rule of procedure 14. Quality assessment procedures Process approval of specialist contractors within the electronic components industry |
BS 9610:1982 | Specification for quartz crystal units of assessed quality: generic data and methods of test |
BS CECC 00111-3:1991 | Rule of Procedure 11. Specifications Regulations for CECC Specifications for components for general and professional (civil and military) usage (excluding detail specifications) |
BS CECC 00104:1991 | Rule of Procedure 4. CECC Working Groups. General rules and additional rules |
BS CECC 00114-3:1993 | Rule of procedure 14. Quality assessment procedures Capability approval of an electronic component manufacturing activity |
BS CECC 00112-1:1993 | Rule of Procedure 12. Voting procedures CECC Rules of Procedure and specifications (excluding ENs) |
BS CECC 00111-4:1991 | Rule of Procedure 11. Specifications Regulations for CECC detail specifications |
BS CECC 00114-4:1992 | Rule of procedure 14. Quality assessment procedures Procedure for enhanced assessment of quality |
BS CECC 00111-5:1991 | Rule of Procedure 11. Specifications Preparation of specifications under the Single Originator Procedure |
BS 9000-4:1991 | General requirements for a system for electronic components of assessed quality Specification of procedures for the approval of an organization |
BS EN 175100:1993 | Harmonized system of quality assessment for electronic components. Sectional specification. Two part and edge socket connectors for printed board applications |
BS CECC 30700:1991 | Harmonized system of quality assessment for electronic components. Sectional specification: fixed capacitors of ceramic dielectric, class 2 |
BS CECC 00111-2:1991 | Rule of Procedure 11. Specifications Regulations for CECC Specifications for components of enhanced assessment of quality |
BS CECC 31501:1988 | Specification for harmonized system of quality assessment for electronic components. Blank detail specification: fixed ceramic capacitors of dielectric class 2 for electrical shock hazard protection |
BS CECC 00800:1988 | Harmonized system of quality assessment for electronic components. Code of practice for the use of the ppm approach in association with the CECC system |
BS CECC 00109:1991 | Rule of Procedure 9. Certified test records |
BS 9018:1973 | Rules for the preparation of detail specifications for pulse modulator hydrogen thyratrons of assessed quality |
CECC 00109 : 1974 | CECC RULES OF PROCEDURE: RP 9: CERTIFIED TESTS RECORDS |
CECC 00112 : 82 AMD 4 | CECC RULES OF PROCEDURE: RP 12: VOTING PROCEDURES |
CECC 00102 : 86 AMD 1 91 | CECC RULES OF PROCEDURE: RP 2: ADMINISTRATION PROCEDURES - ORGANISATION OF THE CECC GENERAL SECRETARIAT - CECC FINANCIAL ADMINISTRATION |
CECC 00103 : 1990 | CECC RULES OF PROCEDURE: RP 3: THE ELECTRONIC COMPONENTS QUALITY ASSURANCE COMMITTEE (ECQAC) |
BS 9000-4:1991 | General requirements for a system for electronic components of assessed quality Specification of procedures for the approval of an organization |
CECC 00600 : 1982 | RULES FOR THE USE AND ADMINISTRATION OF THE CECC CERTIFICATION MARK |
CECC 00104 : 89 AMD 3 93 | CECC RULES OF PROCEDURE: RP 4: CECC WORKING GROUPS - GENERAL RULES - ADDITIONAL RULES |
CECC 00101 : 91 AMD 2 93 | CECC RULES OF PROCEDURE: RP 1: THE CENELEC ELECTRONICS COMPONENTS COMMITTEE (CECC) |
BS 9000-8.1(1989) : 1989 | GENERAL REQUIREMENTS FOR A SYSTEM FOR ELECTRONIC COMPONENTS OF ASSESSED QUALITY - DRAFTING REQUIREMENTS - GENERIC, SECTIONAL AND BLANK DETAIL SPECIFICATIONS PRODUCED UNDERQUALIFICATIONS APPROVAL |
BS 9000-7:1989 | General requirements for a system for electronic components of assessed quality Specification of lot formation, release procedures and certified test records |
CECC 00114 : 93 AMD 1 | QUALITY ASSESSMENT PROCEDURES - APPROVAL OF MANUFACTURERS AND OTHER ORGANIZATIONS |
BS 9000-8.2(1989) : 1989 | GENERAL REQUIREMENTS FOR A SYSTEM FOR ELECTRONIC COMPONENTS OF ASSESSED QUALITY - DRAFTING REQUIREMENTS - GENERIC AND SECTIONAL SPECIFICATIONS PRODUCED UNDER CAPABILITY APPROVAL |
CECC 00113 : 1993 | CECC RULES OF PROCEDURE: RP 13: NATIONAL STATEMENT OF SURVEILLANCE ARRANGEMENTS |
BS 9000-6:1989 | General requirements for a system for electronic components of assessed quality Specification of capability approval procedures |
CECC 00111 : 80 AMD 3 | CECC RULES OF PROCEDURE: RP 11: SPECIFICATIONS AND THEIR HARMONIZATION - COMPONENTS FOR GENERAL AND PROFESSIONAL USAGE - COMPONENTS OF ENHANCED ASSESSMENT OF QUALITY |
BS 9000-5:1989 | General requirements for a system for electronic components of assessed quality Specification of qualification approval and conformance testing procedures |
CECC 00106 : 1991 | CECC RULES OF PROCEDURE: RP 6: METHODS OF AMENDING THE RULES OF PROCEDURE OF THE SYSTEM |
CECC 00108 : 94 AC 98 | RULE OF PROCEDURE 8 (ATTESTATION OF CONFORMITY) - PART 1: THE CECC MARK AND CONDITIONS OF USE - PART 2: CERTIFICATES OF APPROVAL - PART 3: PROCEDURES FOR THE ATTESTATION OF CONFORMITY |
CECC 00105 : 1989 | CECC RULE OF PROCEDURE: RP 5: CECC MEMBERSHIP REGISTER |
CECC 00400 : 86 ERRATUM 92 | HANDBOOK FOR THE PRODUCTION OF CECC DOCUMENTS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.